Željko Stević, Çağlar Karamaşa, Ezgi Demir and Selçuk Korucuk
Forests are negatively affected from rapid world population increase and industrialization that create intense pressures on natural resources and the possibility of an achieving…
Abstract
Purpose
Forests are negatively affected from rapid world population increase and industrialization that create intense pressures on natural resources and the possibility of an achieving circular economy. Forests can be considered as essential resources for providing sustainable society and meeting the requirements of future generations and circular economy. Therefore sustainable production tools as part of circular economy can be handled as one of the basic indicators for achieving circular economy. Accordingly the main purpose of this study is developing a novel rough – fuzzy multi-criteria decision-making model (MCDM) for evaluation sustainable production for forestry firms in Eastern Black Sea Region.
Design/methodology/approach
For determining 18 criteria weights a novel Rough PIPRECIA (PIvot Pairwise RElative Criteria Importance Assessment) method is developed. Eight decision-makers (DMs) participated in the research, and to obtain group rough decision matrix, rough Dombi weighted geometric averaging (RNDWGA) operator has been applied. For evaluation forestry firms fuzzy MARCOS (Measurement of alternatives and ranking according to COmpromise solution) method was utilized.
Findings
After application developed model the fourth alternative was found as the best. Sensitivity analysis and comparison were made to present the applicability of this method.
Originality/value
Development of novel integrated Rough PIPRECIA-Fuzzy MARCOS model with emphasis on developing new Rough PIPRECIA method.
Details
Keywords
Modish Kumar and Santosh Kumari
This paper aims to evaluate the available research to identify the factors contributing to the delays in road construction projects. The primary goals of this study are to…
Abstract
Purpose
This paper aims to evaluate the available research to identify the factors contributing to the delays in road construction projects. The primary goals of this study are to determine the critical elements that cause delays in road projects, and to investigate the appropriate corrective actions suggested to lessen the delays in road projects. The study also assesses the theoretical background, methodology, limitations and future research prospects suggested in relevant research works related to causes for delays in road construction.
Design/methodology/approach
This study adopted systematic literature review in three steps: collecting relevant literature, descriptive analysis and content analysis. This study used keyword analysis and thematic content analysis on some relevant selected studies. NVivo 12 was used for thematic content analysis utilising description-focused coding, the text was thematically analysed, three other software: MS Excel, VOSviewer and Mendeley were also used for analysis in this study.
Findings
The findings revealed that road projects around the world experienced delays and the reasons for delays are many. After the analysis of literature, number of factors causing delays in road projects were identified, which were then divided into seven broad groups using thematic content analysis. The investigation shows that variations in design and inefficient management of project by contractor including inadequate planning and scheduling are the top two factors of delay. The most frequent suggested corrective measure to reduce delay was employing technically competent employees and contractor should conduct thorough survey on his part, rather than just accepting the survey report at face value.
Research limitations/implications
This review paper is addressing the issues related to delays in road construction projects and suggests remedial measure to reduce them. The paper will be useful for researchers, industry professionals, academician and policy makers concerned with the road construction projects. The study conducted the review of selected relevant articles related to causes of delay in road construction projects for qualitative analysis. The research articles using quantitative methods and studies conducted on other types of infrastructure projects were not included; however, findings from this study may be applicable to other construction projects as well.
Practical implications
The findings of this paper are useful in the fields of economy, industry, academia and public policies. The paper thoroughly examined the factors causing delays in highway projects, offering insights for practitioners to identify best practices and mitigation strategies. These findings can guide investment and policy decisions for highway infrastructure projects, promoting a holistic approach to development. Additionally, this paper can help enhance research methods in studies about delays in road infrastructure projects.
Originality/value
The literature review in the paper used a qualitative method. The causes of road project delays, remedial action, context, methodology and theoretical foundation were all examined in this paper.