Search results

1 – 10 of 10
Article
Publication date: 29 October 2024

Saeed Reza Mohandes, Khalid Kaddoura, Atul Kumar Singh, Moustafa Y. Elsayed, Saeed Banihashemi, Maxwell Fordjour Antwi-Afari, Timothy O. Olawumi and Tarek Zayed

This study underscores the critical importance of well-functioning sewer systems in achieving smart and sustainable urban drainage within cities. It specifically targets the…

Abstract

Purpose

This study underscores the critical importance of well-functioning sewer systems in achieving smart and sustainable urban drainage within cities. It specifically targets the pressing issue of sewer overflows (SO), widely recognized for their detrimental impact on the environment and public health. The primary purpose of this research is to bridge significant research gaps by investigating the root causes of SO incidents and comprehending their broader ecological consequences.

Design/methodology/approach

To fill research gaps, the study introduces the Multi-Phase Causal Inference Fuzzy-Based Framework (MCIF). MCIF integrates the fuzzy Delphi technique, fuzzy DEMATEL method, fuzzy TOPSIS technique and expert interviews. Drawing on expertise from developed countries, MCIF systematically identifies and prioritizes SO causes, explores causal interrelationships, prioritizes environmental impacts and compiles mitigation strategies.

Findings

The study's findings are multifaceted and substantially contribute to addressing SO challenges. Utilizing the MCIF, the research effectively identifies and prioritizes causal factors behind SO incidents, highlighting their relative significance. Additionally, it unravels intricate causal relationships among key factors such as blockages, flow velocity, infiltration and inflow, under-designed pipe diameter and pipe deformation, holes or collapse, providing a profound insight into the intricate web of influences leading to SO.

Originality/value

This study introduces originality by presenting the innovative MCIF tailored for SO mitigation. The combination of fuzzy techniques, expert input and holistic analysis enriches the existing knowledge. These findings pave the way for informed decision-making and proactive measures to achieve sustainable urban drainage systems.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 November 2022

Sanaz Tabatabaee, Mojtaba Ashour, Haleh Sadeghi, Seyed Amirali Hoseini, Saeed Reza Mohandes, Amir Mahdiyar, Syuhaida Ismail and M. Reza Hosseini

To come up with a prudent decision on the installation of an appropriate green wall (GW) on buildings, this study presents a novel decision-making algorithm. The proposed…

Abstract

Purpose

To come up with a prudent decision on the installation of an appropriate green wall (GW) on buildings, this study presents a novel decision-making algorithm. The proposed algorithm considers the importance of barriers hampering GW adoption, as well as their relationships with regard to different types of GWs existing in a contextual setting.

Design/methodology/approach

The proposed methodological approach is based on the integration of qualitative and quantitative techniques by employing focus group discussion, fuzzy-based best-worst method and fuzzy TOPSIS.

Findings

Based on the experiences of qualified experts involved in related projects in Hong Kong, the following conclusions are drawn: (1) cost, installation and maintenance-related barriers are perceived to have the highest importance, (2) modular living wall system is the most suitable GW system for the context of Hong Kong and (3) existing barriers are found to have a pivotal role in the ranking of the most suitable GW systems.

Practical implications

The findings provide valuable insight not only for policymakers and stakeholders, but also for establishing a methodological approach that can assist decision-makers in identifying the most beneficial GW system rather than the most applicable one. This could have significant implications and introduce potential changes to the common way of practice within the industry and lay the foundation for wider adoption of GW.

Originality/value

While previous studies have investigated the sustainability-related issues of GW façade applications, the current body of knowledge is deprived of a comprehensive methodological approach for the selection of the most suitable GW systems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 August 2024

Atul Kumar Singh, Saeed Reza Mohandes, Bankole Osita Awuzie, Temitope Omotayo, V.R. Prasath Kumar and Callum Kidd

This study delves into the challenges obstructing the integration of blockchain-enabled smart contracts (BESC) in the construction industry. Its primary objective is to identify…

Abstract

Purpose

This study delves into the challenges obstructing the integration of blockchain-enabled smart contracts (BESC) in the construction industry. Its primary objective is to identify these barriers and propose a roadmap to streamline BESC adoption, thereby promoting sustainability and resilience in building engineering.

Design/methodology/approach

Employing a unique approach, this study combines the Technology-Organization-Environment-Social (TOE + S) framework with the IF-Delphi-HF-DEMATEL-IFISM methodology. Data is collected through surveys and expert interviews, enabling a comprehensive analysis of BESC implementation barriers.

Findings

The analysis reveals significant hindrances in the construction industry’s adoption of BESC. Key obstacles include economic and market conditions, insufficient awareness and education about blockchain technology among stakeholders, and limited digital technology integration in specific cultural and societal contexts. These findings shed light on the complexities faced by the industry in embracing blockchain solutions.

Originality/value

The research makes a significant contribution by combining the TOE + S framework with the IF-Delphi-HF-DEMATEL-IFISM methodology, resulting in a comprehensive roadmap to address barriers in implementing BESC in Sustainable Construction Projects. Noteworthy for its practicality, this roadmap provides valuable guidance for construction stakeholders. Its impact extends beyond the industry, influencing both academic discourse and practical applications.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 May 2024

Saeed Reza Mohandes, Atul Kumar Singh, Abdulwahed Fazeli, Saeed Banihashemi, Mehrdad Arashpour, Clara Cheung, Obuks Ejohwomu and Tarek Zayed

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is…

Abstract

Purpose

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is still constrained. This study seeks to identify and examine the digital twin’s implementation barriers in construction building projects to augment operational performance and sustainability.

Design/methodology/approach

An iterative two-stage approach was adopted to explore the phenomena under investigation. General DT Implementation Barriers were first identified from extant literature and subsequently explored using primary questionnaire survey data from Hong Kong building industry professionals.

Findings

Survey results illustrated that Lack of methodologies and tools, Difficulty in ensuring a high level of performance in real-time communication, Impossibility of directly measuring all data relevant to the DT, need to share the DT among multiple application systems involving multiple stakeholders and Uncertainties in the quality and reliability of data are the main barriers for adopting digital twins' technology. Moreover, Ginni’s mean difference measure of dispersion showed that the stationary digital twin’s barriers adoption is needed to share the DT among multiple application systems involving multiple stakeholders.

Practical implications

The study’s findings offer valuable guidance to the construction industry. They help stakeholders adopt digital twins' technology, which, in turn, improves cost efficiency and sustainability. This adoption reduces project expenses and enhances environmental responsibility, providing companies a competitive edge in the industry.

Originality/value

This research rigorously explores barriers to Digital Twin (DT) implementation in the Hong Kong construction industry, employing a systematic approach that includes a comprehensive literature review, Ranking Analysis (RII) and Ginni’s coefficient of mean difference (GM). With a tailored focus on Hong Kong, the study aims to identify, analyze and provide novel insights into DT implementation challenges. Emphasizing practical relevance, the research bridges the gap between academic understanding and real-world application, offering actionable solutions for industry professionals, policymakers and researchers. This multifaceted contribution enhances the feasibility and success of DT implementation in construction projects within the Architecture, Engineering and Construction (AEC) sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 20 December 2022

Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli and Saeed Reza Mohandes

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction…

Abstract

Purpose

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction managers and practitioners to estimate the time of compound elements in building projects using the resource specification technique.

Design/methodology/approach

A 4D BIM estimation process was first developed by applying the resource specification and geometric information from the BIM model. A suite of OA including particle swarm optimization, ant colony, differential evolution and genetic algorithm were developed and compared in order to facilitate and automate the estimation process. The developed processes and porotypes were linked and integrated.

Findings

The OA-based automated 4D BIM estimation prototype was developed and validated through a real-life construction project. Different OAs were applied and compared, and the genetic algorithm was found as the best performing one. The prototype was successfully linked with BIM timeliner application. By using this approach, the start and finish dates of all object-based activities are developed, and the project completion time is automatically estimated.

Originality/value

Unlike conventional construction estimation methods which need various tools and are error prone and time-consuming, the developed method bypasses the existing time estimation tools and provides the integrated and automated process with BIM and machine learning algorithms. Furthermore, this approach integrates 4D BIM applications into construction design procedures, connected with OA automation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 July 2024

Ayaz Ahmad Khan, Rongrong Yu, Tingting Liu, Ning Gu, James Walsh and Saeed Reza Mohandes

To incentivize innovation, support competitiveness, lower skill scarcities, and alleviate the housing affordability difficulty, proponents underscore the pertinence of embracing…

Abstract

Purpose

To incentivize innovation, support competitiveness, lower skill scarcities, and alleviate the housing affordability difficulty, proponents underscore the pertinence of embracing contemporary construction methodologies, with particular emphasis on volumetric modular construction (VMC) as a sustainable paradigm for production and consumption. However, construction industry stakeholders in Australia have encountered profound challenges in adopting VMC, as its adoption remains significantly low. Therefore, this study investigated the constraints that hinder VMC in the Australian construction industry.

Design/methodology/approach

The study used qualitative methodology using semi-structured interviews as a core approach to glean professional experts' perspectives and insights, along with Pareto and mean index score analyses.

Findings

The study identified 77 reported and validated VMC constraints by professionals, categorizing them into eight categories: cultural, economic, knowledge, market, regulatory, stakeholder, supply chain, and technological. The mean index score analysis reveals stakeholder (µ = 9.67) constraints are the most significant, followed by cultural (µ = 9.62) and regulatory (µ = 9.11) constraints. Pareto analysis revealed 25 of the 77 constraints as ‘vital few” among different categories. This study presented causal relationships and mitigation strategies for VMC constraints, followed by an argument on whether VMC adoption in Australia requires a nudge or mandate.

Practical implications

This study offers guidance for efficient resource allocation, aiding management and government policy formulation. It's also valuable for global audiences, especially countries transitioning to modular construction.

Originality/value

This is one of the first studies to identify VMC constraints and delineate them into different categories in Australia, identify their causal interrelationships, and deliver countermeasures to overcome them.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 December 2023

Dephanie Cheok Ieng Chiang, Maxwell Fordjour Antwi-Afari, Shahnawaz Anwer, Saeed Reza Mohandes and Xiao Li

Given the growing concern about employees' well-being, numerous researchers have investigated the causes and effects of occupational stress. However, a review study on identifying…

Abstract

Purpose

Given the growing concern about employees' well-being, numerous researchers have investigated the causes and effects of occupational stress. However, a review study on identifying existing research topics and gaps is still deficient in the extant literature. To fill this gap, this review study aims to present a bibliometric and science mapping approach to review the state-of-the-art journal articles published on occupational stress in the construction industry.

Design/methodology/approach

A three-fold comprehensive review approach consisting of bibliometric review, scientometric analysis and in-depth qualitative discussion was employed to review 80 journal articles in Scopus.

Findings

Through qualitative discussions, mainstream research topics were summarized, research gaps were identified and future research directions were proposed as follows: versatile stressors and stress model; an extended subgroup of factors in safety behavior; adaptation of multiple biosensors and bio-feedbacks; evaluation and comparison of organizational stress interventions; and incorporation of artificial intelligence and smart technologies into occupational stress management in construction.

Originality/value

The findings of this review study present a well-rounded framework to identify the research gaps in this field to advance research in the academic community and enhance employees' well-being in construction.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 July 2024

Kaiyang Wang

In recent decades, interest in digital transformation (DX) within the architecture, engineering, and construction (AEC) industry has significantly increased. Despite the existence…

Abstract

Purpose

In recent decades, interest in digital transformation (DX) within the architecture, engineering, and construction (AEC) industry has significantly increased. Despite the existence of several literature reviews on DX research, there remains a notable lack of systematic quantitative and visual investigations into the structure and evolution of this field. This study aims to address this gap by uncovering the current state, key topics, keywords, and emerging areas in DX research specific to the AEC sector.

Design/methodology/approach

Employing a holistic review approach, this study undertook a thorough and systematic analysis of the literature concerning DX in the AEC industry. Utilizing a bibliometric analysis, 3,656 papers were retrieved from the Web of Science spanning the years 1990–2023. A scientometric analysis was then applied to these publications to discern patterns in publication years, geographical distribution, journals, authors, citations, and keywords.

Findings

The findings identify China, the USA, and England as the leading contributors in the field of DX in AEC sector. Prominent keywords include “building information modeling”, “design”, “system”, “framework”, “adoption”, “model”, “safety”, “internet of things”, and “innovation”. Emerging areas of interest are “deep learning”, “embodied energy”, and “machine learning”. A cluster analysis of keywords reveals key research themes such as “deep learning”, “smart buildings”, “virtual reality”, “augmented reality”, “smart contracts”, “sustainable development”, “building information modeling”, “big data”, and “3D printing”.

Originality/value

This study is among the earliest to provide a comprehensive scientometric mapping of the DX field. The findings presented here have significant implications for both industry practitioners and the scientific community, offering a thorough overview of the current state, prominent keywords, topics, and emerging areas within DX in the AEC industry. Additionally, this research serves as an invaluable reference and guideline for scholars interested in this subject.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 December 2023

Atul Kumar Singh and V.R. Prasath Kumar

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building…

Abstract

Purpose

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building information modeling (BEBIM) in FM. This research aims to identify and prioritize the barriers to adopting BEBIM in FM.

Design/methodology/approach

To address the knowledge gap, this study employs a two-phase methodology for evaluating the barriers to adopting BEBIM in FM. The first phase involves a comprehensive literature review identifying 14 barriers to BEBIM adoption. Using a Delphi approach, the identified barriers were categorized into 6 groups and finalized by 11 experts, adding 3 more barriers to the list. The best-worst method (BWM) determines the priority weights of identified barriers and sub-barriers in the second phase.

Findings

This study reveals that adopting BEBIM for FM in India faces significant hurdles. The most critical barriers are “limited collaboration” and “communication among stakeholders,” “legal constraints in certain jurisdictions” and “challenges in establishing trust and governance models.” To mitigate these barriers, stakeholders should foster collaboration and communication, develop efficient blockchain technology (BT) and establish a trust and governance model.

Practical implications

This work underscores the importance of formulating effective strategies to overcome the identified barriers and emphasizes implications that can assist policymakers and industry stakeholders in achieving successful BEBIM adoption for improved FM practice.

Originality/value

The study provides valuable insights for policymakers, construction industry stakeholders and facility managers interested in leveraging this technology to improve the efficiency and effectiveness of FM practice in India.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of 10