Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

107

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 12 July 2024

Maryam AlQasmi and Kamla Ali Al-Busaidi

This study aims to investigate the most effective enablers and tools for inhabitants’ knowledge acquisition in public policymaking organizations.

34

Abstract

Purpose

This study aims to investigate the most effective enablers and tools for inhabitants’ knowledge acquisition in public policymaking organizations.

Design/methodology/approach

Based on a literature review, the study summarized 51 individual, organizational, technological and inhabitant-related enablers of inhabitants’ knowledge acquisition, as well as 36 technological and social tools. The study assessed the effectiveness of these enablers and tools based on two rounds of a Delphi study targeting 31 policymakers in the Gulf Cooperation Council (GCC) countries. Kendall’s coefficient of concordance was assessed to determine consensus among participating policymakers.

Findings

The findings indicate that the most effective enablers were inhabitants’ willingness to get involved, information technology (IT) infrastructure, IT staff support and inhabitants’ trust in policymakers. Additionally, the study found that the most effective tools for inhabitants’ knowledge acquisition included meetings, interviews, social media and field visits.

Originality/value

Inhabitants’ knowledge acquisition is an important social and economic force that will drive change in any society by enabling the implementation of innovative ideas and practices. A review of the relevant research shows that despite the usability of inhabitants’ knowledge, the degree to which inhabitants’ knowledge acquisition is integrated into the public policymaking system remains unclear. This study of inhabitants’ knowledge acquisition from the policymaker perspective provides a better understanding of the inhabitants’ knowledge acquisition process in policymaking organizations.

Details

VINE Journal of Information and Knowledge Management Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2059-5891

Keywords

Access Restricted. View access options
Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

114

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 21 August 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of…

267

Abstract

Purpose

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of diverse stakeholders. Conducting a bibliometric analysis, this paper aims to unravel the major research themes and methodologies utilised by researchers in studying the critical success criteria for construction projects, as well as extracting these success criteria.

Design/methodology/approach

The researchers systematically searched and screened 95 papers from Scopus and Web of Science (WoS) databases. This study conducted research focus parallelship network (RFPN) analysis and keywords co-occurrence network (KCON) analysis using BibExcel and Gephi to cluster the papers, illuminate the relationships among keywords within each cluster, and identify the primary research directions.

Findings

Using the RFPN analysis, this study classified the papers into three distinct clusters: infrastructure and public projects success, risk and knowledge management, and contractors and procurement management. Statistical techniques such as structural equation modelling (SEM) and multi-criteria decision-making methods such as analytic hierarchy process (AHP) have been used to analyse project success in the construction industry.

Research limitations/implications

Considering the intensified demand for streamlined digital interactions and the increasing emphasis on sustainability and safety performance, construction companies are recommended to allocate greater investments toward the automation and digitisation of their products and processes. Prioritising modular construction and embracing transformative technologies alongside data science is crucial for enabling well-informed decision-making, and enhancing project success.

Originality/value

This study contributes to the existing body of knowledge by conducting a quantitative and systematic evaluation of the literature on project success criteria in the construction industry and uncovering key research areas. It addresses the pressing need to understand the complexities of construction projects amidst evolving industry dynamics and emerging disruptions. Moreover, by highlighting the implications of digital innovations and modular construction, this study urges deeper exploration into their impact on project performance and stakeholder satisfaction. This research sets a comprehensive framework for investigating the interplay between project complexity, technological advancements, and sustainable practices in the construction sector, paving the way for strategic advancements in the field.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 29 November 2022

Minh Van Nguyen

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

674

Abstract

Purpose

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Design/methodology/approach

A literature review was first conducted to identify barriers to CSR performance. After that, construction professionals were invited to validate the appropriateness of the obstacles. The discussion allowed the establishment of a list of barriers to CSR performance and their corresponding categories. Data collected from the survey were then analyzed to prioritize the importance of these barriers by the fuzzy DEMATEL-based ANP (DANP) technique.

Findings

The findings presented 16 barriers to CSR, which were categorized into four clusters. The fuzzy DANP analysis showed that strategic vision is the most crucial cluster, followed by the measurement system, stakeholder perspective and scarce resources. Among the sixteen barriers examined, lack of awareness, knowledge and information of CSR; low priority of CSR; lack of metrics to quantify CSR benefits; lack of guidelines and coherent strategies; and lack of CSR enforcement mechanism are the five most crucial barriers.

Originality/value

This study is one of the first that proposes a comprehensive model to prioritize barriers to CSR performance of contractors considering their interrelationships. It provides construction stakeholders with a framework for understanding the linkage between the barriers and CSR framework under the umbrella of stakeholder theory. Thus, the findings might assist construction practitioners and academics in fostering the success of CSR implementation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 6 November 2024

Mohamed Saad Bajjou and Anas Chafi

In the modern era, the concept of sustainability has become pervasive, permeating various sectors, including the construction industry. Driven by growing environmental concerns…

84

Abstract

Purpose

In the modern era, the concept of sustainability has become pervasive, permeating various sectors, including the construction industry. Driven by growing environmental concerns, construction organizations are increasingly compelled to seek operational excellence while realigning their practices towards environmental sustainability goals. Hence, this paper investigates the capability of lean construction (LC) principles in enhancing environmental performance (EP) within the construction industry using a structural equation modeling (SEM) approach.

Design/methodology/approach

The study employs SEM to explore the relationship between LC components and environmental performance factors in the construction context. This methodology integrates both empirical and qualitative analyses within a structured framework to explore the relationship between LC components and EP factors in the construction context. By collecting and statistically testing data from 307 Moroccan construction companies, the study evaluates the impact of five LC principles – process transparency and standardization, continuous improvement, waste elimination, planning and scheduling and material flow and pull – on four environmental performance indicators: material use, energy consumption, non-product output and pollutant releases.

Findings

The analysis reveals that, among the five LC principles – process transparency and standardization, continuous improvement, waste elimination, planning and scheduling and material flow and pull – the principles of waste elimination and planning and scheduling significantly contribute to environmental improvements. These practices were shown to impact positively four environmental performance indicators: material use, energy consumption, non-product output and pollutant releases.

Originality/value

This research fills a critical gap in empirical studies on the beneficial effects of LC practices on environmental sustainability in the construction industry. It provides theoretical insights and practical recommendations for managers and practitioners to effectively implement LC principles, thereby promoting more efficient and sustainable practices, particularly in developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 28 February 2025

Sara Bayandor, Roohollah Kalatehjari, Reza Akherati and Jalal Kasebzadeh

Through a case study for Iran, this research seeks to pinpoint the dominant causes of delay and cost overruns in two standard Support of Excavation methods (Bracing strut and…

0

Abstract

Purpose

Through a case study for Iran, this research seeks to pinpoint the dominant causes of delay and cost overruns in two standard Support of Excavation methods (Bracing strut and top-down construction) in deep excavation projects from various points of view involving contractors, consultants and owners. This investigation identifies the root causes, compares them with existing literature to find similarities and differences with tunnelling and construction projects and proposes practical solutions.

Design/methodology/approach

The primary factors were identified after an extensive literature review and expert interview. Subsequently, a questionnaire was designed to classify related factors, considering impact indices, occurrence likelihood and overall significance. Eventually, the findings of the analysis were visually represented through cause-and-effect diagrams.

Findings

The results indicate that “inflation and exchange rate fluctuation” is the top-rated cause, followed by designers limited overall perspective of implementation issues. Also, comparing the roles of related teams shows that the contractor sector is the most responsible for delay and overruns in both methods. Finally, practical solutions are presented regarding the main affecting factors.

Originality/value

Prior research often addresses delay and costs in construction, but insufficient focus is given to deep excavation projects, particularly in Iran. This study not only fills the identified knowledge gap but also delves into the causes of delay, pursued until the fourth bone in some cases and proposes a solution framework derived from previous research, case studies and expert insights to mitigate construction delay.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Access Restricted. View access options
Article
Publication date: 4 December 2023

Alolote Ibim Amadi

This study aims to investigate ground-related design deficiencies as potential avenues of avoidable cost overruns, discernible from the geotechnical practices of highway agencies…

61

Abstract

Purpose

This study aims to investigate ground-related design deficiencies as potential avenues of avoidable cost overruns, discernible from the geotechnical practices of highway agencies in the Niger Delta region of Nigeria.

Design/methodology/approach

The study deploys an interpretivist qualitative methodology to provide a detailed descriptive analysis of the design-related geotechnical practices of highway agencies during the pre-contract phase of highway projects. Semi-structured interviews were conducted with in-house professionals, consultants and contractors affiliated with the three highway agencies in the Niger Delta and thematically analysed to identify significant deviations from geotechnical best practices.

Findings

The study outcome shows that during the pre-contract phase, a chain of design-related geotechnical shortcomings has plagued highway projects executed in the Niger Delta. This view of practice uncovered in this study demonstrates a culture of significant deviation from best practice recommendations, which could plausibly contribute to the history of significant project cost overruns recorded in the region.

Originality/value

The study qualitatively spotlights gaps in the practice of highway agencies and reinforces the need for a re-orientation of the attitude to risk management, to give geotechnical concerns a priority in the financial management of highway projects executed in the Niger Delta region of Nigeria.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Available. Open Access. Open Access
Article
Publication date: 25 July 2024

Per Erik Eriksson

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the…

241

Abstract

Purpose

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the housing sector. More specifically, it investigates how clients’ choice of procurement strategies and organizational control systems is contingent upon various contextual factors and organizational goals.

Design/methodology/approach

It is based on an explorative interview study of clients and contractors in the Swedish housing sector underpinned by a review of organizational control literature.

Findings

The client's knowledge and resources, as well as project complexity and uncertainty, are the most important contextual contingency factors, while property management and sustainable development are the most important organizational goals that housing clients consider when designing procurement strategies.

Research limitations/implications

The paper contributes to the understanding of how construction clients choose procurement strategies, by providing new insights into effects of the mentioned contextual contingency factors and organizational goals on clients’ choice of control systems through their procurement strategies.

Practical implications

Property owners who continuously procure housing projects with sustainability requirements and high degrees of complexity and uncertainty should develop knowledge and resources related to their client role, to enable the design and implementation of appropriate procurement strategies.

Originality/value

Novel aspects of the paper are the demonstration of the value of a holistic approach, considering both contextual contingency factors and organizational goals, when selecting control systems and explicit discussion of how the client's knowledge and resources influence possibilities to implement different control systems.

Details

Journal of Financial Management of Property and Construction , vol. 30 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Available. Open Access. Open Access
Article
Publication date: 29 August 2024

Ana Sofia Silva Santos, Maria R.A. Moreira and Paulo S.A. Sousa

This study seeks to develop an Environmental Sustainability Balanced Scorecard (ESBSC) articulated through a strategic map for collaborative implementation by municipalities by…

543

Abstract

Purpose

This study seeks to develop an Environmental Sustainability Balanced Scorecard (ESBSC) articulated through a strategic map for collaborative implementation by municipalities by municipalities. In addition, it aims to elucidate the architecture of this tool.

Design/methodology/approach

The research uses qualitative methodology, initiating with document analysis, followed by municipal-level surveys and an interview with the Norte Portugal Regional Coordination and Development Commission (CCDR-N).

Findings

The study constructs an ESBSC that adopts an integrative approach to sustainability, focusing on municipal joint action. The tool fosters synergies and enhances cooperation. By incorporating a strategic mix, the tool contributes to improving the environmental management performance of the participating municipalities.

Practical implications

This study introduces a tool designed for municipalities that aspire to incorporate environmental sustainability into their strategies. This tool facilitates the implementation and management of a long-term environmental strategy, with potential implications for organization and its culture. In addition, it highlights critical environmental factors that should serve as a starting point in future studies or applications of this tool.

Social implications

Involving both an academic institution and multiple municipalities, this research identifies critical environmental factors that enhance environmental awareness within municipalities and designs a tool that, when consciously adopted, can influence the culture dynamics of the population involved. Furthermore, it proposes a structured and systematic research method for creating an ESBSC for joint municipal action.

Originality/value

To the best of authors’ knowledge, this research constitutes the first exploratory attempt to devise an environmental strategy for joint municipal action. Although the tool emphasizes the environmental component, it promotes an integrated vision of sustainability. Despite the extensive application of balanced scorecards in various organizational contexts, their utilization in fostering environmental sustainability at a municipal level remains underexplored. This study addresses this gap by developing a tailored strategic tool that operationalizes environmental priorities within municipal governance frameworks.

Details

Sustainability Accounting, Management and Policy Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-8021

Keywords