Search results

1 – 10 of 16
Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

80459

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 27 August 2024

Emmanuel Itodo Daniel, Anthony Babalola, Olugbenga Timo Oladinrin, Lovelin Ifeoma Obi, Olalekan Oshodi and Ashendra Nikeshala Konara Mudiyanselage

Improving construction projects' performance through innovative approaches such as lean construction (LC) and offsite construction (OSC) methods are at the centre of various…

Abstract

Purpose

Improving construction projects' performance through innovative approaches such as lean construction (LC) and offsite construction (OSC) methods are at the centre of various debates. However, there is a limited understanding of the current link between LC and OSC approaches. This study aims to conduct a scientometric analysis on LC and OSC research to unpack and establish the nexus and suggest future research focus.

Design/methodology/approach

Scientometric analysis was used to systematically examine existing literature on LC and OSC to identify possible connections. Relevant publications were extracted from the Scopus database, using inclusion and exclusion criteria. VOSviewer software was used as a visualisation technique to analyse and map the interrelations and connections of the concepts being studied. Bibliograhic data on the 68 selected papers were extracted from the Scopus database.

Findings

The search results cover the period between 2003 and 2021. Descriptive statistics show that the number of published papers has increased yearly. Researchers in the USA and Canada are the most productive authors regarding the number of published papers. The directions for future research suggested are the need to identify best practices for integrating LC and OSC methods, the need for more interdisciplinary and cross-country collaboration among researchers, the use of alternative research methods will provide a better understanding of the benefit of integrating LC and OSC techniques and more research is needed to showcase how the use of lean and offsite construction can facilitate the attainment of net-zero in the construction industry.

Originality/value

This study provides insights into the trends and gaps in knowledge on integrating LC and OSC methods and offers valuable insights to scholars and practitioners in integrating LC and OSC principles. This knowledge is vital for identifying strategies to improve the outcome of construction projects and contribute to the sustainable socio-economic development of cities across the globe.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 14 October 2024

Tan Tan, Grant Mills, Xiaolin Ma and Eleni Papadonikolaki

Off-Site Construction (OSC) has received much government and public attention during and after COVID. Building Information Modelling (BIM) is an initiative discussed widely to…

Abstract

Purpose

Off-Site Construction (OSC) has received much government and public attention during and after COVID. Building Information Modelling (BIM) is an initiative discussed widely to promote OSC implementation. Although many policy promotions have been published, there are many challenges to implementing BIM and OSC in real life and questions of whether they really offer value to healthcare design professionals. This research aims to investigate BIM and OSC to understand their commonalities and differences of challenges by collecting empirical evidence from China’s healthcare construction.

Design/methodology/approach

This exploratory research adopted a mixed method with a questionnaire survey and interviews. A total of 261 questionnaires were received (with 183 valid), followed by 31 semi-structured interviews.

Findings

This research reveals that although both OSC and BIM face similar adoption challenges and suspicious attitudes in real-life projects, their challenges’ connotations and reasons are different. OSC faces scepticism for its customisation costs and technical constraints, while BIM is seen as limited in utility and complex to integrate. Highlighting these as socio-technical challenges, the research advocates for an integrated framework to effectively implement OSC and BIM, addressing both technical and collaborative needs in healthcare construction.

Originality/value

This research examines OSC and BIM within the context of healthcare construction, a focus that is relatively underexplored. The research provides a juxtaposition of the perceived and practical challenges of adopting these technologies, revealing a gap between the industry’s expectations and the current capabilities of OSC and BIM, thereby contributing to the development of modern methods of design in healthcare.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 July 2024

Marjan Pouraghajan, Sara Omrani and Robin Drogemuller

This study addresses the global landscape of offsite construction, highlighting its variable adoption patterns and the challenge posed by the prevalent use of suboptimal…

Abstract

Purpose

This study addresses the global landscape of offsite construction, highlighting its variable adoption patterns and the challenge posed by the prevalent use of suboptimal decision-making methods. In response, the decision-making model seeks to equip decision-makers with tools for well-informed decisions on concrete construction systems, tailored to the unique characteristics of each project, in contrast to the persisting reliance on expert knowledge, checklists or similar tools.

Design/methodology/approach

The study extracts decision-making criteria through literature reviews, pilot studies and surveys amongst Australian construction professionals. A comprehensive comparison of four concrete systems against each identified criterion is conducted, followed by the application of an integrated decision model (Entropy-TOPSIS) to rank the systems, considering all criteria simultaneously. Real-world case studies validate the practical applicability of the model.

Findings

An analysis of 15 criteria demonstrated the multifaceted nature of selecting concrete construction systems, emphasising evolving industry priorities like time efficiency, environmental considerations and logistical constraints. The enduring appeal of in-situ concrete in complex projects underscores the significance of traditional methods. The integration of the Entropy-TOPSIS model proved to be a robust decision-making tool, enabling professionals to simultaneously consider all criteria and make well-informed, customised decisions.

Originality/value

The study’s originality lies in its comprehensive approach, considering diverse criteria and presenting a flexible decision-making model suitable for the dynamic demands of the construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 February 2023

Yanqing Fang, Shang Gao, Yanwu Jiang and Shuquan Li

Building information modelling (BIM), lean construction (LC) and prefabricated housing construction (PHC) have individually aroused great attention from academia and industry…

734

Abstract

Purpose

Building information modelling (BIM), lean construction (LC) and prefabricated housing construction (PHC) have individually aroused great attention from academia and industry. However, the integration of LC and BIM in PHC projects has not been sufficiently explored. This study aims to assess the current status of the implementation of BIM and LC in China’s PHC sector given, firstly, that China is a developing country characterised by the world’s largest population and a huge housing market, and secondly, that although China’s PHC is strongly supported by the government, the adoption of BIM and LC in PHC varies.

Design/methodology/approach

A mixed approach (questionnaire survey and interviews) is adopted in this study. A total of 127 valid questionnaires were collected. This is followed by interviewing 12 interviewees who are key stakeholders in PHC and hold managerial positions.

Findings

The findings of the questionnaire survey show that BIM is more prevalent than LC in PHC projects in China. In addition, the adoption of LC exhibits more maturity in stages associated with production and manufacturing, and logistics and transportation, whereas BIM has seen wider adoption in design and construction. The interviews validated the factors that influence the implementation of BIM and LC in PHC projects in China.

Originality/value

The study uses a strengths, weaknesses, opportunities and threats analysis framework to clarify the opportunities, threats, strengths and weaknesses of BIM and LC in China’s PHC and proposes strategies.

Details

International Journal of Lean Six Sigma, vol. 14 no. 7
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 14 February 2023

Rehan Masood, Krishanu Roy, Vicente A. González, James B.P. Lim and Abdur Rehman Nasir

Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers…

Abstract

Purpose

Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers, of prefabricated housebuilding projects is still not perceptually aligned, hindering innovation diffusion. This paper investigates the contemporary industry perspective on PHB for conceptualisation, market share and growth, innovation diffusion and the producer's role in the context of New Zealand.

Design/methodology/approach

An exploratory qualitative research design was chosen to learn the perceptual stance of the industry. A semi-structured survey was conducted, followed by interviews with selected supply chain participants, who were producers and non-producers and had relevant experience in the PHB industry.

Findings

This study reports the common terminologies used by supply chain members, with justification and explanation. Further, the perceived market share and growth of the PHB industry are obtained and compared with subsequent studies to determine the capability and capacity. The perception of the diffusion of PHB by type is reported to portray the overall trend of the industry. In the last, the role of producers as the suppliers of PHB projects is investigated to establish the stakeholder positional criticality.

Practical implications

This study can help researchers and practitioners gain insight into the PHB industry from a multi-dimensional perspective. This study is a potential first step to formalise the policy, programme, strategies and action plan for the uptake of the PHB in the New Zealand.

Originality/value

PHB diffusion in the supply chain perspective, considering multi-dimensional aspects, has not been considered in previous studies as government agencies produce most of the literature. This academic research establishes the theoretical linkage towards PHB diffusion and reports the current status.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 March 2024

Margarida P. Santos, Fernando A. F. Ferreira, Neuza C. M. Q. F. Ferreira, João J. M. Ferreira and Ieva Meidutė-Kavaliauskienė

Gazelle companies are characterized by rapid growth in a short time. Identifying the determinants of this exponential expansion is important as these firms have a significant…

Abstract

Purpose

Gazelle companies are characterized by rapid growth in a short time. Identifying the determinants of this exponential expansion is important as these firms have a significant impact on the economy. They generate increased employment and investment by investors interested in new opportunities. Previous studies have failed to reach a consensus about what fosters high growth in gazelle companies as each firm’s geographical, political and economic context is different. The present research uses cognitive mapping and interpretive structural modeling (ISM) to overcome the limitations of prior investigations and identify factors that can potentially accelerate growth in gazelle companies.

Design/methodology/approach

Two sessions were held with an expert panel with knowledge about and experience with these firms. In the first session, data were collected to create a group cognitive map, while the second meeting comprised ISM-based analyses of the high-growth determinants identified and the causal relationships between them. A final consolidation session was held to discuss the results with two members of the Committee for Central Region Coordination and Development (i.e. Comissão de Coordenação e Desenvolvimento Regional do Centro – a public entity that grants gazelle awards in Portugal).

Findings

The analysis system created was tested, and the results demonstrate that the dual methodology used can increase our understanding of the dynamics of high-growth determinants and lead to more informed and potentially better evaluations of gazelle companies. Indeed, once high-growth determinants in gazelle companies are understood, this information can help other firms implement the same business model to achieve similarly rapid growth. The strengths and shortcomings of this new structured analysis model are also analyzed.

Originality/value

The authors know of no prior work reporting the integrated use of cognitive mapping and ISM in this study context.

Details

Journal of Small Business and Enterprise Development, vol. 31 no. 5
Type: Research Article
ISSN: 1462-6004

Keywords

Article
Publication date: 22 November 2024

Ashlin Oglesby-Neal, Bryce E. Peterson and Daniel S. Lawrence

This study explores how various officer and event-level factors influence Milwaukee Police Department officers’ decision to activate their body-worn cameras (BWCs) across both…

Abstract

Purpose

This study explores how various officer and event-level factors influence Milwaukee Police Department officers’ decision to activate their body-worn cameras (BWCs) across both community member-initiated services and officer-initiated activities.

Design/methodology/approach

Across the 1,052 officers and 1,066,112 officer-events in the sample, we use descriptive and logistical regressions to assess differences in BWC activations across calls for service and officer-initiated activities.

Findings

We found similar activation rates between calls for service (41.5%) and officer-initiated activities (44.1%). However, our logistic regression analysis results suggest the explanatory power of the event and officer-level variables was substantially better in models examining officer-initiated activities. Among calls for service, officers were more likely to activate BWCs during calls involving crimes against persons compared to other crimes or non-criminal incidents. Activation was more frequent during traffic stops than other self-initiated activities. Activation increased when the event resulted in an advisement, citation, detention or arrest.

Originality/value

The success of police BWC programs hinges on whether officers activate their cameras when interacting with community members. Findings suggest that officers are more likely to activate their BWCs during activities that involve direct interactions with community members, especially in situations with a higher potential for volatility or serious criminal implications.

Details

Policing: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1363-951X

Keywords

Article
Publication date: 21 November 2023

Sharaf AlKheder, Hajar Al Otaibi, Zahra Al Baghli, Shaikhah Al Ajmi and Mohammad Alkhedher

Megaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many…

Abstract

Purpose

Megaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many restrictions that discourage their execution causing a significant delay in bidding, design, construction and operation phases with the execution quality being affected. The objective of this study is to develop a complexity measurement model using analytic hierarchy process (AHP) for megaprojects in Kuwait, with a focus on the New Kuwait University multi-billion campus Shadadiyah (College of Social Science, Sharia and Law (CSSL)) as a case study.

Design/methodology/approach

The study applies a hybrid fuzzy analytic hierarchy process (FAHP) method to compare the results with those obtained using the conventional AHP method. This can facilitate the project management activities during the different stages of construction. Data were collected based on the results of a two-round Delphi questionnaire completed by seniors and experts of the selected project.

Findings

It was found that project modeling methodology was responsible for complexity. It was grouped under several categories that include technological, goal, organizational, environmental and cultural complexities. The study compares complexity degrees assessed by AHP and FAHP methods. “Technological Complexity” scores highest in both methods, with FAHP reaching 7.46. “Goal Complexity” follows closely behind, with FAHP. “Cultural Complexity” ranks third, differing between methods, while “Organizational” and “Environmental Complexity” consistently score lower, with FAHP values slightly higher. These results show varying complexity levels across dimensions. Assessing and understanding such complexities were essential toward the completion of such megaprojects.

Originality/value

The contribution of this study is on providing the empirical evidential knowledge for the priority over construction complexities in a developing country (Kuwait) in the Middle East.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 16