Search results

1 – 4 of 4
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 9 November 2022

Esther Oluwadamilola Olufemi Rotimi, Funmilayo Ebun Rotimi, C.W. Chathurani Silva and Itohan Esther Aigwi

There are several technologies positively impacting the management of construction projects. Building information modelling (BIM) is one such technology, slowly changing project…

318

Abstract

Purpose

There are several technologies positively impacting the management of construction projects. Building information modelling (BIM) is one such technology, slowly changing project delivery. However, enhancing knowledge transfer (KT) within the construction industry is crucial because of the characteristic slow uptake of innovation. Therefore, this study aims to establish the effectiveness of the KT mechanism for BIM implementation in construction organisations.

Design/methodology/approach

This study adopted a quantitative research method where a structured questionnaire was distributed to construction professionals. A partial least square structural equation modeling path analysis was used to test the direct and indirect relationships of computer self-efficacy (CS), perceived ease of use (PEOU), KT and BIM usage.

Findings

This study found that CS could improve KT, which will, in turn, increase the implementation of BIM within construction organisations. However, in terms of KT, individuals’ confidence and ability to use BIM inspires them to share the knowledge of BIM they had received through training. Furthermore, this study found that the ease of interacting, learning and being skilful with BIM may not necessarily ensure the actual transfer of knowledge.

Originality/value

This study provides valuable insights into KTs (BIM implementation) in the construction industry. It will enhance the use of BIM systems and related knowledge through effective training amongst construction practitioners. Other previous studies have focused on challenges and barriers to BIM implementation, this study goes deeper into establishing the effectiveness of the KT mechanism for BIM implementation in construction organisations.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 27 February 2023

C.W. Chathurani Silva, Dilini Dineshika Rathnayaka and M.A.C.S. Sampath Fernando

This study aims to evaluate the adoption of four types of supplier sustainability risk management (SSRM) strategies, namely, risk avoidance (RA), risk acceptance (RAC)…

841

Abstract

Purpose

This study aims to evaluate the adoption of four types of supplier sustainability risk management (SSRM) strategies, namely, risk avoidance (RA), risk acceptance (RAC), collaboration-based risk mitigation (CBM) and monitoring-based risk mitigation (MBM) in Sri Lankan apparel and retail industries, and to investigate their effect on supply chain performance (SCP).

Design/methodology/approach

This study uses the dynamic capability view (DCV) to develop its hypotheses. Data collected from 89 firms were analysed using partial least square (PLS) structural equation modelling and PLS-based multiple group analysis.

Findings

Sri Lankan apparel and retail firms adopt RA and MBM strategies relatively more than CBM and RAC strategies, whereas there is no significant difference between the two industries in terms of the use of SSRM strategies. The path analysis revealed significant effects of RA and RAC strategies on SCP of both industries. The effect of CBM strategy on SCP is moderated by industry, while MBM has no significant impact.

Research limitations/implications

While managing supplier sustainability risks effectively, RA and RAC strategies provide more opportunities for managers to improve SCP. In achieving SCP, CBM strategies are proven to be more effective for retail industry compared with the apparel sector. Although MBM strategies offer sustainability advantages to firms, their contribution to improving the performance of apparel and retail supply chains is not significant. This research is limited to only two industries (apparel and retail) in Sri Lanka, where the evidence for the effects of SSRM strategies is not available for other contexts.

Originality/value

Either the effects of the four types of SSRM strategies on SCP or the moderating effect of industry on these effects have not been empirically confirmed in the literature. Evaluating the extent to which different strategies are implemented in Sri Lankan apparel and retail industries is another significant contribution of this research. Furthermore, this study contributes by using DCV to a sustainability-based supply chain risk management research.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Access Restricted. View access options
Article
Publication date: 15 May 2023

Funmilayo Ebun Rotimi, Marcela Brauner, Megan Burfoot, Nicola Naismith, C.W. Chathurani Silva and Mahsa Mohaghegh

This study aims to determine the effects of sexism and unfavourable job conditions on women's mental and physical wellbeing in construction operations. In addition, this study…

829

Abstract

Purpose

This study aims to determine the effects of sexism and unfavourable job conditions on women's mental and physical wellbeing in construction operations. In addition, this study will establish the mediating role of work morale in the association between workplace challenges and wellbeing.

Design/methodology/approach

Data for this study were obtained from women working in office environments, onsite professionals and those in trades. A total of 65 participants responded to the survey. The partial least square structural equation modelling method was applied to validate the measurement model and test the hypotheses.

Findings

The findings demonstrate that benevolent and hostile sexism directly influences work morale and indirectly affects women's mental and physical wellbeing in the construction industry. Hostile sexism is the most significant challenge for female construction workers in New Zealand.

Research limitations/implications

The finding is theory-building and challenges the assumptions that the nature of the construction industry has a bearing on the mental and physical health of women in construction. In addition, the finding is useful for creating positive work environments that are both inclusive and empathetic to the diverse needs of the modern-day construction workforce. Thus, reducing the challenges experienced by construction women's workforce.

Originality/value

The current study focuses on women and those who identified themselves as such. The conclusions show the relevance of work morale to their mental wellbeing. This exploratory quantitative study contributes to research by advancing understanding of the challenges women face in the industry and the consequences of those challenges on their physical and mental wellbeing.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 31 July 2024

Oluwole Alfred Olatunji, James Olabode Bamidele Rotimi, Funmilayo Ebun Rotimi and Chathurani C.W. Silva

Cost and schedule overruns are rife in dam projects. Normative evidence espouses overruns as though they are inimical to development and prosperity aspirations of stakeholders…

115

Abstract

Purpose

Cost and schedule overruns are rife in dam projects. Normative evidence espouses overruns as though they are inimical to development and prosperity aspirations of stakeholders. This study examines the causal relationship between project financing and overruns.

Design/methodology/approach

Causative data were extracted from completion reports of 28 major dam projects in Africa. Each of the projects was financed jointly by up to 10 international development lenders. Relationships between causes of overruns and project outcomes were analysed.

Findings

Analyses elicit indicators of remarkable correlations between finance procedures and project outcomes. Lenders’ disposition to risk attenuation was the main debacles to project success. Interests had mounted, whilst release of fund was erratic and ill-timed. Finance objectives and mechanisms were grossly inadequate for projects’ intense bifurcations. Projects had slowed or stalled because lenders’ risks attenuation processes were purposed to favour lenders’ objectives, and not projects’ interests. In addition, findings also show project owners’ own funds and the number of lenders to a single project correlate with overruns.

Practical implications

Findings imply commercial complexities around major projects. They also show transactions are shaped by subtle (mis)trust behaviours in project finance procedures. Thus, scholarly solutions to project performance issues should consider behavioural issues of stakeholding parties more broadly, beyond contractors and project owners. Project finance ecosystems are vulnerable to major actors’ self-interests, opportunism and predatory conducts. Borrowers would manage this by developing and improving their capacity to build resilience and trust. Evidence shows intense borrower nations in Africa have limited capacity and acuity for these.

Originality/value

This study contextualises megaprojects in complexity rather than cost. Its additionality is in how finance steers absolute control of project environment away from project owners and how finance administration triggers risks and overrun.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 4 of 4
Per page
102050