Search results

1 – 10 of 21
Article
Publication date: 20 September 2024

Justina Falana, Robert Osei-Kyei and Vivian W.Y. Tam

Stakeholder interests are complex, sensitive and highly uncertain and may influence the development of net zero carbon building (NZCB). However, this study aims to conduct a…

Abstract

Purpose

Stakeholder interests are complex, sensitive and highly uncertain and may influence the development of net zero carbon building (NZCB). However, this study aims to conduct a systematic literature review to explore the stakeholder interests towards achieving NZCB.

Design/methodology/approach

A total of 62 articles were identified from the Scopus database and thoroughly reviewed to extract relevant information on stakeholders' interest towards achieving NZCB.

Findings

A total of 28 stakeholder interests influencing the development of NZCB were identified from the literature and were classified into six major groups according to their uniqueness (economic, social, environmental, technological, political, regulatory and legal).

Research limitations/implications

The findings of this study provide insight into the specific stakeholder interests towards achieving NZCB. Thus, the findings of this study could serve as a guide for future research, policy formulation and implementation to expedite the practice of building towards net zero carbon (NZC). Empirical studies are suggested in future studies to test and consolidate the theoretical claims of this study.

Originality/value

This paper undertakes a comprehensive systematic review of studies on stakeholder interests towards achieving NZCB, which is the least investigated in the literature.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 27 February 2024

Qianwen Zhou and Xiaopeng Deng

Despite the knowledge transfer between projects has received increasing attention from scholars, few scholars still conduct comprehensive research on inter-project knowledge…

Abstract

Purpose

Despite the knowledge transfer between projects has received increasing attention from scholars, few scholars still conduct comprehensive research on inter-project knowledge transfer from both horizontal and vertical perspectives. Besides, knowledge transfer is affected by multiple antecedent conditions, and these factors should be combined for analysis. Therefore, this paper aims to explore the key factors influencing knowledge transfer between projects using the fuzzy-set qualitative comparative analysis (fsQCA) method from both horizontal and vertical perspectives and how these factors combine to improve the effectiveness of knowledge transfer (EKT) between projects.

Design/methodology/approach

First, nine factors affecting knowledge transfer between projects were identified, which were from the four dimensions of subject, relationship, channel, and context, namely temporary nature (TN), time urgency (TU), transmit willingness (TW), receive willingness (RW), trust (TR), project-project transfer channels (PPC), project-enterprise transfer channels (PEC), organizational atmosphere (OA), and motivation system (MS). Then, the source of the samples was determined and the data from the respondents was collected for analysis. Following the operation steps of the fsQCA method, variable calibration, single condition necessity analysis, and configuration analysis were carried out. After that, the configurations of influencing factors were obtained and the robustness test was conducted.

Findings

The results of the fsQCA method show that there are five configurations that can obtain better EKT between projects. Configuration 3 (∼TN * ∼TU * TW * RW * TR * ∼PPC * PEC * MS) has the highest consistency, indicating that it has the highest degree of the explanatory variable subset. Configuration 1 (∼TN * ∼TU * TW * RW * PEC * OA * MS) has the highest coverage, meaning that this configuration can explain most cases. Also, the five configurations were divided into three types: vertical transfer, horizontal-vertical transfer, and channel-free transfer category.

Originality/value

Firstly, this study explores the key factors influencing knowledge transfer between projects from four dimensions, which presents the logical chain of influencing factors more clearly. Then, this study divided the five configurations obtained into three categories according to the transfer direction: vertical, horizontal-vertical, and channel-free transfer, which gives implications to focus on both horizontal knowledge transfer (HKT) and (VKT) when studying knowledge transfer between projects. Lastly, this study helps to realize the exploration of combined improvement strategies for EKT, thereby providing meaningful recommendations for enterprises and project teams to facilitate knowledge transfer between projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 May 2024

Ali Mohammad Mirzaee and Igor Martek

Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues…

Abstract

Purpose

Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues, potentially unfulfilled contractual obligations, performance claims and counter-claims, combined with consequently deteriorating stakeholder relationships, the management of closeouts is fraught with difficulties leading to suboptimal outcomes. This is particularly true where general contractor (GC) organizations do not have a claims management office (CMO) dedicated to improving such suboptimal clean-up outcomes. Thus, this study aims to develop a model by which CMOs’ may effectively manage the clean-up phase in an environment of closeout claims.

Design/methodology/approach

X-inefficiency theory was utilized as the theoretical lens guiding this study. The theory helps identify closeout strategies implemented by a GC, which manages completion claims through a CMO. Data were received and analyzed from a large GC, which served as the firm case study. In this case, managing the closeout completion claims was the main function of the CMO.

Findings

The average delay of closeout completion was four times greater than construction phase delays. The GC results highlighted the “economic destruction tsunami of projects,” as a root cause for these completion delays. Wrap-up activities under contract law are identified, including within the domains of statements of completion, project handover and debt settlement. Behavior strategies are also defined, including relational and contractual approaches. Moreover, a process for improving closeout claim performance is described, comprising project closeout identification, rational intra-firm behavior, closeout completion and program closeout practice.

Originality/value

Findings from this work can significantly contribute in X-inefficiency theory in relation to how a decrease of X-inefficiency will lead to better closeout claim performance. It also offers practical insights into how best to minimize delayed closeout completion while providing valuable lessons for stakeholders in complex infrastructure projects. Further, a model is developed that may be utilized by owners, consultancies, designers and other contractor organizations in an effort to improve closeout claim performance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2023

Fei Hui Lim, Nurhidayah Bahar, Siti Norida Wahab and Muhammad Iskandar Hamzah

This paper aims to investigate the motivational drivers for knowledge sharing (KS) through the application of mobile social networking (MSN) and their influence on employee…

Abstract

Purpose

This paper aims to investigate the motivational drivers for knowledge sharing (KS) through the application of mobile social networking (MSN) and their influence on employee productivity in the Malaysian construction industry.

Design/methodology/approach

The data was collected by distributing a self-administered questionnaire among employees working in the construction industry. A total of 250 questionnaires were collected and analysed using partial least squares structural equation modeling. This study used a variety of analysis methodologies including correlation analysis, reliability and validity testing, as well as a structural model in evaluating the relationships between KS, motivational factors and influence on productivity.

Findings

The empirical results of this study reveal that utilitarian motivation is positively related to internal and external KS. Similarly, internal and external KS have a positive influence on productivity, while internal and external hedonic motivation does not show any significant relationship with productivity.

Research limitations/implications

Considering the paucity of evidence regarding the determinants of KS motivational drives on employee productivity in the Malaysian construction industry, this study enriches the social cognitive theory-based literature on KS.

Practical implications

This study provides some insights to the players in the construction industry in implementing the most appropriate KS promotion strategies that could potentially influence employee productivity. Organisations in the construction industry that place great emphasis on utilitarian motivation including competency, reward and incentives are more likely to have a better influence on KS and, in turn, positively impact employee productivity.

Originality/value

This study meaningfully contributes to enhancing the understanding of the motivational drivers for sharing knowledge on MSN and its influence on productivity. The findings of this study potentially assist construction practitioners in developing a holistic blueprint for managing their KS towards improving the overall productivity of their employees.

Details

VINE Journal of Information and Knowledge Management Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2059-5891

Keywords

Article
Publication date: 13 December 2023

Guodong Ni, Qi Zhou, Xinyue Miao, Miaomiao Niu, Yuzhuo Zheng, Yuanyuan Zhu and Guoxuan Ni

New generation of construction workers (NGCWs) who were born in the 1980s and later have gradually become the main workforce of Chinese construction industry. They may behave…

Abstract

Purpose

New generation of construction workers (NGCWs) who were born in the 1980s and later have gradually become the main workforce of Chinese construction industry. They may behave differently when dealing with knowledge-related activities due to divergent characteristics caused by generational discrepancy. To provide a theoretical foundation for construction companies and safety managers to improve safety management, this research explores the factors and paths impacting the NGCWs' ability to share their safety knowledge.

Design/methodology/approach

Based on literature review, main factors that influence the safety knowledge sharing of the NGCWs were identified. Decision-Making Trial and Evaluation Laboratory and Interpretive Structural Modeling were applied to identify the hierarchical and contextual relations among the factors influencing the safety knowledge sharing of the NGCWs.

Findings

The results showed that sharing atmosphere ranked first in centrality and had a high degree of influence and being influenced, indicating itself an extremely important influencing factor of safety knowledge sharing of NGCWs. Six root influencing factors were identified, including individual characteristics, work pressure, sharing platform, incentive mechanism, leadership support and safety management system.

Research limitations/implications

The number of influencing factors of safety knowledge sharing of the NGCWs identified in this study is limited, and the data obtained by the expert scoring method is subjective. In future studies, the model should be further developed and validated by incorporating experts from different fields to improve its integrity and applicability.

Practical implications

The influencing factors identified in this paper can provide a basis for construction companies and safety managers to improve productivity and safety management by taking relevant measures to promote safety knowledge sharing. The research contributes to the understanding knowledge management in the context of the emerging market. It helps to answer the question of how the market can maintain the economic growth success through effective knowledge management.

Originality/value

This paper investigates the influencing factors of NGCWs' safety knowledge sharing from the perspective of intergenerational differences, and the 13 influencing factor index system established expands the scope of research on factors influencing safety knowledge sharing among construction workers and fills the gap in safety knowledge sharing research on young construction workers. Furthermore, this paper establishes a multi-layer recursive structure model to clarify the influence path of the influencing factors and contributes to the understanding of safety knowledge sharing mechanism.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 July 2024

Wei Zhang, Ning Ding, Rui Xue, Yilong Han and Chenyu Liu

In today’s digital era, talent recruitment can help address the growing shortage of skilled labor in the construction industry and promote sustainable growth. While existing…

Abstract

Purpose

In today’s digital era, talent recruitment can help address the growing shortage of skilled labor in the construction industry and promote sustainable growth. While existing research has explored the association between talent acquisition and local labor productivity or economic progress, the impact on construction growth deserves further study. This study aims to (1) explore the influence of talent recruitment on the growth of the construction industry and (2) analyze whether different regional characteristics shape the differential impact of talent acquisition on construction growth.

Design/methodology/approach

This research employs a quantitative approach, focusing on 35 major cities in China. A panel data regression model is utilized to analyze annual data from 2013 to 2018, considering variables like the construction talent recruitment index, value added in construction, gross regional product per capita and others. The study also examines regional heterogeneity and conducts robustness tests to validate the findings.

Findings

The results reveal a positive and significant correlation between talent recruitment and construction industry growth. This correlation is more pronounced in economically advanced and infrastructure-rich regions. The study also finds that factors like capital investment, educational attainment and housing prices significantly contribute to industry growth. Talent recruitment not only transforms local labor market dynamics but also drives demand for construction services, promoting industry growth through economies of scale.

Originality/value

This research constructs a new measurement for talent recruitment and provides new insights into the pivotal role of talent recruitment in the sustainable growth of the construction industry. It underscores the need for construction firms to tailor talent acquisition policies to their specific circumstances and regional developmental conditions. The findings offer practical guidance for driving regional growth within the sector, emphasizing the importance of talent recruitment as a key yet previously underappreciated factor in industry development.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 July 2024

Ahmed Nouh Meshref, Elsayed Elkasaby and Omnia Wageh

To help decision-makers choose appropriate infrastructure project delivery systems (IPDS) and keep up with the construction industry’s rapid growth, this study aims to develop a…

Abstract

Purpose

To help decision-makers choose appropriate infrastructure project delivery systems (IPDS) and keep up with the construction industry’s rapid growth, this study aims to develop a goal optimization technique.This looks into team integration, large production and optimum sustainability. The suggested approach for meeting several infrastructure project objectives is flexible and expandable. This research overcomes the significant discrepancy between the construction industry’s progress and the rate at which project delivery methods evolve.

Design/methodology/approach

This study examined pertinent literature to choose an appropriate project delivery method and gave information on several elements that affect that decision. After optimization using a genetic algorithm (GA), a Pareto front of solutions has been found. The three construction goals of sustainability, mass production and team integration are all met by the chosen best solution. The four most popular possibilities for studying the suggested approach are five primary categories, each of which has 22 variables, and the weight of each variable was established using Simo’s procedure. This is optimized, demonstrating the accuracy of the optimization model.

Findings

Sustainability, mass production and team integration are the major goals of selecting the finest IPDS. The Pareto-optimal solutions discovered through analysis demonstrated that the created GA is reliable and generates solid outcomes. In fact, it enables decisions that were based on a single criterion to be overturned. The process has therefore demonstrated its efficacy in identifying the ideal answer. First integrated project delivery (IPD), second design-build (DB), third design-bid-build (DBB) and last construction manager at risk (CMR) are the best options. The weight of the aims function has found these rankings to be satisfactory.

Practical implications

The findings demonstrate that the suggested strategy can lead to optimization, providing the government with a wide range of options for attaining certain project objectives. The ability of this study to evaluate the combined effects of three objectives in choosing the best IPDS, the production of optimal selection solutions (IPDS), which can help with better decision-making when many objectives are present, and the flexibility and extendibility of the suggested approach for achieving priorities in infrastructure projects are what make it unique. This approach was able to select IPDS to meet developments in the construction project.

Originality/value

To confirm the validity of the GA, the factor of error was calculated, which is equal to 1.7599e-08.

Article
Publication date: 19 July 2024

Zhengyi Zhou

This paper studies the determinants for the desirability of the public-private partnership (PPP) mode in infrastructure development.

Abstract

Purpose

This paper studies the determinants for the desirability of the public-private partnership (PPP) mode in infrastructure development.

Design/methodology/approach

The author manually collects data on over 12,000 PPP projects in China, and regard the successful transition and abnormal termination as signals for the mode’s desirability and undesirability, respectively. Then, guided by relevant theories in the literature, the author investigates the impact of various project characteristics on the projects’ successful transition and abnormal termination.

Findings

First, execution-stage projects in industries where government support is indispensable, or where quality improvement is more important than cost reduction, face higher likelihood of abnormal termination. But such negative effects are mitigated if state-owned enterprises (SOEs) participate in the social party. Second, the structure of social party matters. The participation by private firms in the social party increases the termination likelihood, while the decentralization of the social party decreases it. Third, pre-execution projects with government payment or subsidies are more likely to enter into the execution stage.

Practical implications

Regulations on participation by SOEs in PPPs, such as policy [2023 No. 115] announced by State Council, should take industrial heterogeneity into consideration.

Originality/value

Using a large sample, the author empirically tests the seminal PPP-related theories in the literature. The author also uncovers some unique stylized facts about PPPs in China, especially the impact of SOE participation in the social party on PPP survival.

Details

China Finance Review International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1398

Keywords

Article
Publication date: 31 May 2023

Jiahao Liu, Xi Xu and Jing Liu

Although building information modeling (BIM) has brought competitive advantages and many new jobs, the BIM-related job market is still confusing in China, which will undermine the…

Abstract

Purpose

Although building information modeling (BIM) has brought competitive advantages and many new jobs, the BIM-related job market is still confusing in China, which will undermine the adoption of BIM. This paper aims to show what kinds of BIM-related jobs are there in China, what employers require and whether all BIM engineers are the same kind.

Design/methodology/approach

A text mining approach, structural topic model, was used to process the job descriptions of 1,221 BIM-related online job advertisements in China, followed by a cluster analysis based on it.

Findings

First, 10 topics of requirements with the impact of experience and educational background to them were found, namely, rendering software, international project, design, management, personal quality, experience, modeling, relation and certificate. Then, six types were clustered, namely, BIM modeler, BIM application engineer, BIM consultant, BIM manager, BIM developer and BIM designer. Finally, different kinds of BIM engineers proved this title was an expediency leading to confusion.

Originality/value

This paper can provide a clear and insightful look into the confusing and unheeded BIM-related job market in China and might help to cope with the abuse of job titles. It could also benefit both employers and candidates in their recruitment for better matching.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 5 April 2024

Qiang Du, Yerong Zhang, Lingyuan Zeng, Yiming Ma and Shasha Li

Prefabricated buildings (PBs) have proven to effectively mitigate carbon emissions in the construction industry. Existing studies have analyzed the environmental performance of…

Abstract

Purpose

Prefabricated buildings (PBs) have proven to effectively mitigate carbon emissions in the construction industry. Existing studies have analyzed the environmental performance of PBs considering the shift in construction methods, ignoring the emissions abatement effects of the low-carbon practices adopted by participants in the prefabricated building supply chain (PBSC). Thus, it is challenging to exploit the environmental advantages of PBs. To further reveal the carbon reduction potential of PBs and assist participants in making low-carbon practice strategy decisions, this paper constructs a system dynamics (SD) model to explore the performance of PBSC in low-carbon practices.

Design/methodology/approach

This study adopts the SD approach to integrate the complex dynamic relationship between variables and explicitly considers the environmental and economic impacts of PBSC to explore the carbon emission reduction effects of low-carbon practices by enterprises under environmental policies from the supply chain perspective.

Findings

Results show that with the advance of prefabrication level, the carbon emissions from production and transportation processes increase, and the total carbon emissions of PBSC show an upward trend. Low-carbon practices of rational transportation route planning and carbon-reduction energy investment can effectively reduce carbon emissions with negative economic impacts on transportation enterprises. The application of sustainable materials in low-carbon practices is both economically and environmentally friendly. In addition, carbon tax does not always promote the implementation of low-carbon practices, and the improvement of enterprises' environmental awareness can further strengthen the effect of low-carbon practices.

Originality/value

This study dynamically assesses the carbon reduction effects of low-carbon practices in PBSC, informing the low-carbon decision-making of participants in building construction projects and guiding the government to formulate environmental policies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 21