Yishuo Jiao, Renhong Zhu, Jialiang Fu, Xiaowei Li and Yichao Wang
The rapid development of digital technologies drives digital entrepreneurs to pivot, a behavior that allows entrepreneurs to adjust original opportunities and explore new…
Abstract
Purpose
The rapid development of digital technologies drives digital entrepreneurs to pivot, a behavior that allows entrepreneurs to adjust original opportunities and explore new opportunities. This study aims to investigate the effect of the structural characteristics of digital entrepreneurial teams, the functional heterogeneity, on pivoting from the perspective of digital agility. Moreover, this study also examines the moderating effect of knowledge sharing.
Design/methodology/approach
Two-phase survey data were sourced from Chinese digital entrepreneurial teams through the entrepreneurial networks of MBA programs of a Chinese business school and entrepreneurial support organizations in China. The sample of 272 teams with 708 entrepreneurs was collected to test the hypotheses.
Findings
The functional heterogeneity of digital entrepreneurial teams, including industry background heterogeneity and occupational experience heterogeneity, positively impacts pivoting by providing heterogeneous knowledge and resources. Moreover, this relationship is mediated by the digital agility of the digital team, and knowledge sharing moderates the relationship between functional heterogeneity and digital agility.
Originality/value
While existing studies have mainly focused on the external factors, this study empirically investigates the team-level internal factors of digital pivoting in digital entrepreneurial teams, enriching the research perspective of pivoting. Moreover, the current study bridges the literature on digital agility with pivoting, broadening the theoretical mechanism of pivoting and expanding the theoretical boundaries of digital agility.
Details
Keywords
Minggao Tan, Yichao Lian, Xianfang Wu and Houlin Liu
The purpose of this paper is to investigate the clocking effect of impellers and the superposition between pump stages caused by clocking effect in a five-stage centrifugal pump…
Abstract
Purpose
The purpose of this paper is to investigate the clocking effect of impellers and the superposition between pump stages caused by clocking effect in a five-stage centrifugal pump. Then the best clocking scheme in terms of vibration is tried to be provided as well.
Design/methodology/approach
All curves of pressure fluctuation in different impeller stages can be divided into two groups for the difference of 1/16 T in time domain. The difference is mostly in vibration frequency and amplitude, little in pump head and efficiency.
Findings
All curves of pressure fluctuation in different impeller stages can be divided into two groups for the difference of 1/16 T in time domain. The difference is mostly in vibration frequency and amplitude, little in pump head and efficiency.
Research limitations/implications
This research involves eight different impeller clocking schemes. The results show that the clocking effect has little influence in pump head and efficiency, but the influence in pressure fluctuation is larger.
Practical implications
The paper provides guidance for the design of multistage pump for better vibration performance.
Originality/value
This research involves eight different impeller clocking schemes, the results show that the clocking effect has little influence in pump head and efficiency, but the influence in pressure fluctuation is larger. Then the best clocking scheme In terms of vibration is tried to be provided through analysis.
Details
Keywords
Wei He, Yichao Shi and Dewei Kong
The construction industry is characterized by a long construction period, high cost and many uncontrollable factors. The owners and contractors are increasingly focusing on the…
Abstract
Purpose
The construction industry is characterized by a long construction period, high cost and many uncontrollable factors. The owners and contractors are increasingly focusing on the efficiency of their construction and costs in pursuit of greater economic benefits. However, current methods used in the construction period and cost optimization analysis with multiple constraints the have their own limitations. Therefore, this study aims to propose a combination of genetic algorithm (GA) and building information modeling (BIM) to construct a five-dimensional construction duration-cost optimization model with the advantages of optimization and simulation for optimization.
Design/methodology/approach
This design first analyzed the characteristics of changing construction period and cost and then improved the genetic mechanism and the data processing method in the GA according to the aforementioned characteristics. Then, BIM technology was combined with GA to testify the feasibility of the model in the practical engineering project.
Findings
The result proved that this new method was reasonable and effective in dealing with the complicated problem of period and cost. GA accelerated the optimization process and yielded a reliable Pareto solution. BIM technology simulated the construction process before construction to increase the feasibility of the construction scheme.
Originality/value
This method not only can rapidly provide the best construction period/cost decision to the architect according to the previous working period/cost or contract data that can meet the demands of the architect but also visualize the construction and give a dynamic schedule of the project.
Details
Keywords
Ling Yan, Yichao Chen and Tingting Cao
The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB…
Abstract
Purpose
The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB) driven by the network structure is crucial to project performance. This article investigated how to stimulate the consulting project performance (CPP) improvement by considering the interactive effect of network structure and TBB. To be specific, this paper explored the configuration between structural characteristics of project networks, the dimension of TBB, and project performance in ICC projects.
Design/methodology/approach
Network density and centrality were used to reflect network structure. This study collected 216 valid responses from construction professionals (including project managers, department managers, and project engineers) via a questionnaire survey and analyzed the data using fsQCA.
Findings
Combining with the corresponding typical project case and analysis, the results concluded four types of configurations for achieving high performance in the ICC projects. Meanwhile, network centrality, density, ambassadorial behavior, coordination behavior, and detection behavior significantly impact high consulting project performance. Matching ICC network characteristics with the TBB is important. There are also three low performance configurations for the ICC projects. Low performance state also occurs when network centrality or density and coordination behavior is simultaneously low. Only the right match between the network characteristics and TBB can produce high consulting project performance.
Research limitations/implications
The network centrality and density, the implementation of TBB vary, and the paths to achieve high consulting project performance are different. Clients, ICC projects, and consulting teams should choose the appropriate development paths according to the actual situation. (1) Clients should commit to applying the ICC project model with high network centrality, density, and coordination behavior of ICC enterprises to promote project performance. (2) Consulting enterprises should carry out ICC business based on detecting behavior and coordinating behavior. (3) The market should cultivate head consulting enterprises with independence and integration, and bring into play the effectiveness of consulting team ambassadorial behavior.
Practical implications
Comparing the results of the four high CPP configurations, the network structure characteristics are essential, which means that in the Chinese consulting practice between the owner and the consulting firm pay attention to the use of appropriate ICC organizational structure model and arrange the degree of centralization of authorized responsibilities. Coordination behavior is necessary to achieve high CPP. Therefore, Chinese consulting firms should pay attention to effective communication and exchange with project contractors in order to get high CPP in conducting business; meanwhile, enabling behavior can achieve high CPP both in the presence and absence of configuration H1 and H4, which indicates that enabling behavior has substitution effect. Comparing the three low CPP configurations also contrarily confirms the indispensability of coordinating behavior. Comparing the results of high and low CPP configurations, the TBB is seriously missing and not properly applied in CPP enhancement. In detail, Chinese consulting firms have been regarded as independent third parties providing services, and less attention has been paid to the TBB of Chinese consulting firms in past practice, thus leading to the dilemma of inadequate empowerment of consulting firms due to their unclear status. To solve this dilemma, the findings of this paper offer a solution at the micro level to change the previous perception of consulting and demonstrate that Chinese consulting practice needs to pay attention to TBB with owners and contractors, and apply it well to enhance the reputation, management consulting level and capability, and experience and expertise of consulting firms to achieve high CPP.
Originality/value
The research results changed from the previous bilateral project governance to a new perspective of network embedding. It provided a theoretical basis for the improvement path of high consulting project performance, as well as providing ideas for clients on the organizational design of ICC projects. On the other hand, it provided a practical reference for TBB positioning of ICC enterprises for transformation and upgrading development.
Details
Keywords
Qingchao Sun, Xin Liu, Xiaokai Mu and Yichao Gao
This paper aims to study the relationship between normal contact stiffness and contact load. It purpose a new calculation model of the normal contact stiffness of joint surfaces…
Abstract
Purpose
This paper aims to study the relationship between normal contact stiffness and contact load. It purpose a new calculation model of the normal contact stiffness of joint surfaces by considering the elastic–plastic critical deformation change of asperities contact.
Design/methodology/approach
The paper described the surface topography of joint surfaces based on fractal geometry, and fractal parameters and of fractal function derived from measurement data. According to the plastic–elastic contact theory, the contact deformation characteristic of asperities was analyzed; the critical deformation estimation model was presented, which expressed critical deformation as the function of fractal parameters and contact deformation; the contact stiffness calculation model of single asperity was brought forward by considering critical deformation change.
Findings
The paper combined the surface topography description function, analyzed the asperity contact states by considering the critical deformation change, and calculated normal contact stiffness based on fractal theory and contact deformation analysis. The comparison between theoretical contact stiffness and experimental data indicated that the theoretical normal contact stiffness agreed with the experimental data, and the estimation model for normal contact stiffness was appropriate.
Research limitations/implications
Owing to the possibility of plastic deformation during the loading process, the experimental curve between the contact stiffness and the contact load is nonlinear, resulting in an error between the experimental results and the theoretical calculation results.
Originality/value
The paper established the relationship between critical deformation and fractal surface topography by constructing asperity distribution function. The paper proposed a new normal contact stiffness calculation model of joint surfaces by considering the variation of critical deformation in contact process.
Details
Keywords
Caiyun Sun and Li Shi
The purpose of this paper is to evaluate doctoral candidates’ innovative ability tendency.
Abstract
Purpose
The purpose of this paper is to evaluate doctoral candidates’ innovative ability tendency.
Design/methodology/approach
This study uses the theory of gray target contribution to analyze the influence degree of doctoral candidates’ individual personality factor toward their innovative ability and calculate gray impact quantitative values.
Findings
Based on the theory of contribution degree of gray target, a nine-factor model of innovative personality of doctoral candidates is built. IP=f (B, H, G, Q1, Q2, A, I, F, O), (therein: B – intelligence, H – social boldness, G – perseverance, Q1 – experimental, Q2 – independence, A – gregariousness, I – sensibility, F – excitability, O – anxiety).
Practical implications
This study based on gray target contribution theory builds nine-factor doctoral candidates’ innovative personality model to test the innovative ability tendency of doctoral candidates, which makes cultivating units, mentors and doctoral candidates to know their innovative ability tendency well, perfecting their own knowledge structure in time, effectively improving their innovative ability. The system can also be applied to the work of doctoral candidates as a reference tool to evaluate the innovative ability of applicants.
Originality/value
This study quantitatively evaluates the influence of doctoral candidates’ personality index on the tendency of doctoral candidates’ innovative ability.
Details
Keywords
Caroline Ingvarsson, Anette Hallin and Christof Kier
The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.
Abstract
Purpose
The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.
Design/methodology/approach
The paper presents the results of a systematic literature review of extant research concerning the gamification of projects. Based on this, an agenda for future studies is outlined.
Findings
Extant research on the gamification of projects is scarce and scattered among various disciplines, but the engineering fields dominate. The research performed does indicate that gamification may be used for involving stakeholders in projects, primarily by promoting learning, but also by engaging them, motivating action and solving problems.
Research limitations/implications
In several cases, extant research display poor quality in research design and a lack in cross-disciplinary perspectives, which means that more research is needed. The users’ perspective is often lacking. Furthermore, the ideas gamification might be “hidden” within other technologies.
Practical implications
The findings of this research may assist project management practitioners in the endeavor of adopting gamification principles to better involve stakeholders.
Originality/value
The study fills a gap in summarizing the research on how gamification may be used to promote project stakeholder engagement. Based on this, it proposes a research agenda for future research on the use of gamification to promote project stakeholder engagement.
Details
Keywords
Li Zhang, Bisheng Wu and Haitao Zhang
Natural gas hydrate (NGH) has been regarded as one of the most important resources due to NGH's large amounts of reserve. However, NGH development still faces many technical…
Abstract
Purpose
Natural gas hydrate (NGH) has been regarded as one of the most important resources due to NGH's large amounts of reserve. However, NGH development still faces many technical challenges, such as low production rate and reservoir instability resulting from NGH decomposition. Therefore, developing a fully coupled THMC model for simulating the hydrate decomposition and studying its mechanical behavior is very important and necessary. The purpose of this article is to develop and solve a multi-phase, strong nonlinearity and large-scale fully coupled thermal-hydro-mechanical–chemical (THMC) model for simulating the multi-physics processes involving solid-liquid-gas flow, heat transfer, NGH phase change and rock deformation during NGH decomposition.
Design/methodology/approach
In this paper, a multi-phase, strong nonlinearity and large-scale fully coupled THMC model is developed for simulating the multi-physics processes involving solid-liquid-gas flow, heat transfer, NGH phase change and rock deformation during NGH dissociation. The fully coupled THMC model is solved by using a fully implicit finite element method, in which the gas pressure, water pressure, temperature and displacement are taken as basic unknown variables. The proposed model is validated against with the experimental data, showing high accuracy and reliability.
Findings
A multi-phase, strong nonlinearity and large-scale fully coupled THMC model is developed for simulating the multi-physics processes involving solid-liquid-gas flow, heat transfer, NGH phase change and rock deformation during NGH decomposition. The proposed model is validated against with the experimental data, showing high accuracy and reliability.
Research limitations/implications
Some assumptions are made to make the model tractable, including (1) the composition gas of hydrate is pure methane; (2) the gas-liquid multi-phase flow in the pore obeys Darcy's law; (3) hydrate occurs on the surface of soil particles, both of them form the composite consolidation material; (4) the small-strain assumption is applied to composite solid materials, which are treated as skeletons and cannot be moved; (5) momentum change caused by phase change is not considered.
Practical implications
NGH has been regarded as one of the most important resources due to its large amounts of reserve. However, NGH development still faces many technical challenges, such as low production rate and reservoir instability resulting from NGH decomposition. Most of the existing studies decouple the process with solid deformation and seepage behavior, but the accuracy of the numerical results will be sacrificed to certain extent. Therefore, it is very important and necessary to develop a fully coupled THMC model for simulating the hydrate decomposition and studying its mechanical behavior.
Social implications
NGH, widely distributed in shallow seabed or permanent frozen region, has the characteristics of high energy density and high combustion efficiency (Yan et al., 2020). A total of around 7.5 × 1,018 m3 has been proved to exist around the world and 1 m3 of NGH can release about 160–180 m3 of natural gas (Kvenvolden and Lorenson) under normal conditions. Safely and sustainably extracting NGH commercially can effectively relieve global energy pressure and contribute to achieving carbon reduction goals.
Originality/value
The novelty of the present work lies in mainly two aspects. First, a fully coupled THMC model is developed for studying the multi-physics processes involving solid-liquid-gas flow, heat transfer, NGH phase change and solid deformation during NGH dissociation. Second, the numerical solution is obtained by using a fully implicit finite element method (FEM) and is validated against experimental data.