Search results

1 – 3 of 3
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 7 November 2016

Fahim Ullah, Bilal Ayub, Siddra Qayyum Siddiqui and Muhammad Jamaluddin Thaheem

The purpose of this paper is to investigate the critical decision factors of public–private partnership (PPP) concession which is complex due to a number of uncertain and random…

1489

Abstract

Purpose

The purpose of this paper is to investigate the critical decision factors of public–private partnership (PPP) concession which is complex due to a number of uncertain and random variables. To identify critical factors contributing to determination of concession period, this study reviews the published literature. It also identifies countries contributing most in PPP research. As a whole, it provides a mutually beneficial scenario by formulating a decision-making matrix.

Design/methodology/approach

This paper reviews the literature published during the period 2005-2015. A two-staged methodology is followed on retrieved scholarly papers: first, countries contributing to PPP are identified along with authors and affiliated institutions. Second, using frequency analysis of shortlisted critical factors, yearly appearance and stakeholders affected, a decision matrix is formulated.

Findings

The most contributing country toward PPP research is China, followed by the USA both in terms of country- and author-based contribution. In total, 63 factors are identified that affect PPP concession out of which, 8 per cent are highly critical and 21 per cent are marginally critical for decision-making.

Practical implications

Critical factors of PPP concession period will be identified with the help of decision-making matrix. This will help in adequate resource allocation for handling critical factors ensuring project success. Researchers may also understand the research trends in the past decade to usher ways for future improvements.

Originality/value

This paper reports findings of an original and innovative study, which identifies critical success factors of PPP concession period and synthesizes them into a decision-making matrix. Many of the previous studies have identified and ranked the critical factors but such a synthesis has not been reported.

Details

Journal of Financial Management of Property and Construction, vol. 21 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Article
Publication date: 13 March 2017

Fahim Ullah, Muhammad Jamaluddin Thaheem, Siddra Qayyum Siddiqui and Muhammad Bilal Khurshid

The purpose of this paper is to investigate the level of implementation of Six Sigma (SS) in the construction industry of Pakistan along with the current state of affairs and the…

2238

Abstract

Purpose

The purpose of this paper is to investigate the level of implementation of Six Sigma (SS) in the construction industry of Pakistan along with the current state of affairs and the challenges, and opportunities for a successful implementation.

Design/methodology/approach

The research is purely exploratory in nature. Based on published work, critical success factors are gathered, and a number of questionnaire surveys and interviews are conducted to refine and quantify their impact. A system dynamics framework to assess the SS influence on project success is developed and case study project are simulated.

Findings

The construction industry of Pakistan is still functioning in a traditional way; marred with low level of awareness and ad hoc approaches, the findings point to a huge improvement opportunity. Further, when under planning projects are exposed to SS, the chances of project success improve better than under execution projects.

Research limitations/implications

The limited level of awareness possessed by the respondents constrains the possible outreach of this work in industrially developed contexts. However, this work may become an impetus for further research in managing quality in construction industry.

Practical implications

The findings can be used to improve the quality provision of construction projects.

Originality/value

This work may trigger an important debate over the research and implementation of SS in the construction industry of developing countries that may greatly benefit by improving the quality of their projects and rectify their diminishing reputation for project success.

Details

The TQM Journal, vol. 29 no. 2
Type: Research Article
ISSN: 1754-2731

Keywords

Access Restricted. View access options
Article
Publication date: 6 June 2016

Siddra Qayyum Siddiqui, Fahim Ullah, Muhammad Jamaluddin Thaheem and Hamza Farooq Gabriel

This paper aims at collecting and reviewing the published literature on the Six Sigma in construction along with its critical success factors (CSFs).

2061

Abstract

Purpose

This paper aims at collecting and reviewing the published literature on the Six Sigma in construction along with its critical success factors (CSFs).

Design/methodology/approach

The research is based on literature review. Based on the keyword and semantic search techniques, papers published on the topic of Six Sigma during 2000-2015 are retrieved. Frequency analysis is performed to find out significance of identified CSFs, and zoning is performed based on the product of frequency of appearance and parties affected by the CSFs.

Findings

A total of 69 CSFs are identified as published in the literature. Based on an inclusion criterion of minimum 15 appearances, 22 CSFs are shortlisted for further analysis. Of these CSFs, around 32 per cent fall into red zone (most critical), 50 per cent into yellow and 18 per cent into green zone (least critical).

Research limitations/implications

This work is limited by partial identification of CSFs. Though based on an extensive search, the retrieved CSFs may not be all the published ones. However, more thorough search techniques can be applied to improve upon this work.

Practical implications

The findings can be used to facilitate the decision-making in the context of project success.

Originality/value

This work is an original attempt at gathering Six Sigma CSFs applicable to construction projects. It may be used for further research and development to help ensure project quality and success.

Details

International Journal of Lean Six Sigma, vol. 7 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

Access

Year

Content type

Article (3)
1 – 3 of 3
Per page
102050