Search results
1 – 10 of 17Mohammed Gamil, Nagih M. Shaalan and Ahmed Abd El-Moneim
This study aims to present an efficient and reliable graphene nanoplatelets (GNPs)-based temperature sensor.
Abstract
Purpose
This study aims to present an efficient and reliable graphene nanoplatelets (GNPs)-based temperature sensor.
Design/methodology/approach
A high-quality dispersion of GNPs was dropped by casting method on platinum electrodes deposited on a polyethylene terephthalate (PET) substrate. The GNPs were characterized by scanning electron microscope, Raman spectroscopy and X-ray diffraction spectra to ensure its purity and quality. The temperature sensing behavior of the fabricated sensor was examined by subjecting it to different temperatures, range from room temperature (RT) to 150 °C.
Findings
Excellent resistance linearity with temperature change was achieved. Temperature coefficient of resistance of the fabricated sensor was calculated as 1.4 × 10–3°C. The sensor also showed excellent repeatability and stability for the measured temperature range. Good response and recovery times were evaluated at all the measured temperatures. With measuring the sensor response, the ambient temperature can be determined.
Originality/value
The present work presents a new simply and low cost fabricated temperature sensor based on GNPs working at a wide temperature range.
Details
Keywords
Sahour Sayed, Mohammed Gamil, Ahmed Fath El-Bab, Koichi Nakamura, Toshiyuki Tsuchiya, Osamu Tabata and Ahmed Abd El-Moneim
The purpose of this paper is to develop a new simple technique to synthesize graphene film on a flexible polyethylene terephthalate (PET) substrate and applied as a strain sensor.
Abstract
Purpose
The purpose of this paper is to develop a new simple technique to synthesize graphene film on a flexible polyethylene terephthalate (PET) substrate and applied as a strain sensor.
Design/methodology/approach
Graphene film was synthesized using laser treatment of graphene oxide (GO) film deposited on PET substrate. A universal laser system was used to simultaneously reduce and pattern the GO film into laser reduced graphene oxide (LRGO) film.
Findings
The laser treatment synthesizes a multilayer graphene film with overlapped flakes, which shows structure integrity, mechanical flexibility and electrical conductivity of 1,330 S/m. The developed LRGO/PET film was used to fabricate a high sensitivity strain sensor. The sensitivity and temperature dependency of its gauge factor (GF) was examined at applied strains up to 0.25 per cent and operating temperatures up to 80°C. The fabricated sensor shows stable GF of approximately 78 up to 60°C with standard error of the mean not exceeding approximately ± 0.2.
Originality/value
The proposed method offers a new simple and productive technique of fabricating large-scale graphene-based flexible devices at a low cost.
Details
Keywords
The ideology of “Local Architecture” was about the religious experience, social and cultural interpretations non-awareness, and solutions for environmental and social problems…
Abstract
The ideology of “Local Architecture” was about the religious experience, social and cultural interpretations non-awareness, and solutions for environmental and social problems. This case aims at producing a compatible architecture for this society. The problem of the paper deals with the absence of the local heritage in contemporary architecture. Most of our buildings reflect western ideologies, and use the local vocabulary, as has happened in most of the Arab architecture, that deals directly with a language of shapes to create compatibility with the public. Hence, the aim of the paper is to link the variables that the contemporary architecture formulated with concepts of local architecture. To meet such aims, the research is pivot around two themes: Firstly, tackling how to extract the forces that lead to the contemporariness of local heritage and formalize the DNA of any local community (Culture, Community Aspiration, Climate, and Technology), as well as discussing some experience that dealt with local architecture. Secondly, discussing some recent trials that learned from the previous attempts through history. The attempts strongly re-activate the local architecture in the contemporary challenges, namely, the use of heritage forms as is to conform to environmental determinants, development of these forms using contemporary materials through the visions of local architecture, and employing high-tech solutions to achieve contemporary appropriateness within traditional ideologies. In the end, the paper presents new ideas of the local architecture that learned from the previous experiences in our Arab societies to meet the needs of today's Arab societies.
Details
Keywords
Fadi A. Fatayer, Amjad Z. Issa, Mohammed Abunemeh and Mohammed A.M. Dwikat
Construction contractors in Palestine, as in many other developing countries, suffer from many problems. One of their main problems is their inability to meet contractual…
Abstract
Purpose
Construction contractors in Palestine, as in many other developing countries, suffer from many problems. One of their main problems is their inability to meet contractual requirements, such as completing projects within time, at the agreed cost and to the desired quality. Therefore, this paper aims to investigate the causes of the non-fulfillment of contractual requirements in three different types of projects: building, road and electro-mechanical projects.
Design/methodology/approach
Two methods were adopted to collect the data – qualitative and quantitative. In total, 65 causes were identified from the literature and qualitative semi-structured interviews with professional experts. These causes were classified into five categories: managerial, financial, contractor capabilities, regulations and laws and political. In the quantitative approach, a questionnaire was developed and then distributed to 50 professional experts: 20 building experts, 15 road experts and 15 experts in electro-mechanical projects. A five-point Likert scale was used to assess the importance, from the perspective of the subject matter experts, of the causes that had been identified. About 35 responses, which represent a combined response rate of 70%, were received. The quantitative data were analyzed using descriptive statistics, with the mean, standard deviation and degree of importance for each of the identified causes being determined, and the SPSS software platform used to rank them.
Findings
The results reveal that the most important reasons why contractors did not fulfill their contractual requirements in building projects were that contracts were awarded to the contractor offering the lowest price, and the profit margin was low because of intense competition among contractors. In road projects, the most important causes were the poor estimation of the equipment required and a lack of standardized conditions in the construction sector, while in electro-mechanical projects, the most important causes were the inability of the contractor to estimate the cost of the project accurately because of unclear bid documents and a lack of contractor capital.
Originality/value
The results of this study will be useful to stakeholders and Palestinian contractor unions. They can be disseminated to give guidance so that contractors can avoid these problems in future construction projects and enhance their compliance with contractual requirements. Moreover, knowing about these causes may lead to the reduction of conflicts and disputes between contractual parties (owners and contractors), which in turn will be reflected in the work quality and reputation of contractors.
Details
Keywords
Adnan Alghail, Liu Yao, Mohammed Abbas and Yahia Baashar
The reasons behind the project management failure of higher education institutions (HEIs) have been researched for the past few years. One of the reasons is the lack of tools to…
Abstract
Purpose
The reasons behind the project management failure of higher education institutions (HEIs) have been researched for the past few years. One of the reasons is the lack of tools to integrate their knowledge process capabilities (KPC) with their project management (PM) to measure maturity by assessing these capabilities. Various project management maturity (PMM) models exist. Yet, there is a limited number of empirical studies that support the four integrations of KPC and PMM. Therefore, this study aims to propose a new heretical model, namely, KPC-knowledge management (KM) and evaluates a research model that includes the four KPC as an antecedent to PMM.
Design/methodology/approach
The suggested research model is assessed by using partial least squares structural equation modeling. Furthermore, the study's hypotheses were examined based on a sample of 352 respondents from the project management departments in 10 public universities in Yemen.
Findings
Analysis revealed that the derived PMM status could be benchmarked with the project management maturity model. Also, the study found that integrating the KPC into PM enables the institutions to perform critical tasks and value chain activities and enhance the PM maturity level as well. In contrast, if one of the capabilities does not positively impact PMM, it affects the maturity level of the entire project.
Research limitations/implications
The findings are obtained concerning data collected from public universities and represent the Yemeni context, limiting the generalization on a different geographical area. Also, this proposed model can be evaluated in a practical way like conducting a focus group, a set of interviews with specialists, a case study or action research. The qualitative research will help academics to validate our proposal for future research purposes.
Practical implications
The proposed approach may be adapted to the characteristics of organizations involved in projects as external performers (project-based organizations) and not just the HEIs projects. This study provides managers and policymakers with insights into assessing PMM and improving their organizational effectiveness when deciding which KPCs to focus on in the future.
Social implications
This study contributes to the current PM awareness in Yemen and facilitates its success using the knowledge processes capabilities in Yemen's HEIs. It encourages organizations to take this opportunity to revive the projects and achieve a maximum level of maturity.
Originality/value
This study provides new insights into two domains through the link between knowledge management and PM. To the best of the authors' knowledge, this paper is among the first to empirically study the impact of the four KPC toward PMM. It enriches the theoretical perspective of PM. Also, it contributes to the literature on the success factor of KPC, which can be considered to improve organizational performance.
Details
Keywords
Luqman Oyekunle Oyewobi, Olatunde Folaranmi Adedayo, Seth Olufemi Olorunyomi and Richard Jimoh
The purpose of this paper is to explore the mediating effect of learning capacity in the relationship between the social media usage by the construction of small- and medium-sized…
Abstract
Purpose
The purpose of this paper is to explore the mediating effect of learning capacity in the relationship between the social media usage by the construction of small- and medium-sized enterprises (SMEs) and their business performance in Nigeria.
Design/methodology/approach
A quantitative survey technique was used to collect data from the owner/manager of construction SMEs in Nigeria. The partial least square structural equation modeling was used in the assessment of the measurement model and structural model to assess the validity and reliability of the measures and to evaluate the hypotheses proposed in the conceptual model.
Findings
Empirical findings indicated a significant positive relationship between learning capacity and performance of SMEs. Similarly, the use of social media is significantly and positively associated to the business performance of SMEs. It has also been shown that learning capacity is a mediator of the relationship between social media and SME performance.
Research limitations/implications
The data for the study is are all from a single industry and a related line of business, so it could be more interesting to include more companies across sectors or industries. The finding contributes to the ongoing debate on the effect of social media on business performance. It also defined the need for the owner/manager of SMEs to understand and appreciate the effect of social media through the organization's learning potential to gain a sustainable competitive advantage.
Practical implications
There are a number of theoretical and practical implications for academics and practitioners who are interested in further studies of organizational social media. The research presents a quantitative study on the effect of social media adoption on the organizational performance of the construction industry. This study confirms the mediating role of learning capability in the relationship between the use of social media and performance of SMEs operating in the construction industry.
Originality/value
This study empirically examined the relationship between social media adoption and the SMEs learning capability and business performance by evaluating a hypothesized conceptual framework to establish the relationships.
Details
Keywords
Poor quality of design documents and Design Deficiencies (DDs) are critical factors that can potentially cause time and cost overrun and lead to project failure. Despite the…
Abstract
Purpose
Poor quality of design documents and Design Deficiencies (DDs) are critical factors that can potentially cause time and cost overrun and lead to project failure. Despite the importance of this issue, few studies have been conducted to explore the underlying relations among the causes and effects of DDs, and it is not clear how they exert influence on each other. However, it is imperative to have a clear understanding of their interrelationships so as to devise intervention strategies. The purpose of this study is, therefore, to explore these causes and effects.
Design/methodology/approach
To this aim, a qualitative system dynamics model was provided to visualize how various factors interact with one another. The model was developed and validated by drawing on the expertise of industry-related experts. The key causes and effects of the DDs were identified through the investigation of the model.
Findings
It was concluded that design management of project and the composition of design teams are critical. The obtained results also showed that more attention should be paid to the enhancement of knowledge circulation and communication within design firms and increasing the awareness of managers and owners from the technical consequences of their managerial decisions.
Research limitations/implications
It is worth mentioning that the design process could be deeply affected by the quality, frequency and strength of relationships among the project’s parties. Early involvement of contractors, for example, can significantly contribute to enhancing design quality. This study investigates factors’ interactions in projects delivered using the traditional design-bid-build method. As relationships between the project’s parties could be different in various project delivery methods, further research is indeed needed to assess factors’ interactions in projects delivered using other methods.
Originality/value
It is believed that the proposed model by providing a better insight into the connections of causes and effects could aid project managers of different parties with planning the strategies to reduce DDs and mitigate their effects.
Details
Keywords
Faizan Naveed and Khurram Iqbal Ahmad Khan
This paper investigates the causative relation between information complexity and construction quality. The objectives are to identify the challenges faced in the communication of…
Abstract
Purpose
This paper investigates the causative relation between information complexity and construction quality. The objectives are to identify the challenges faced in the communication of information and data on construction projects and determine how these barriers influence quality performance of a project.
Design/methodology/approach
Limitations in the literature on information seeking, coupled with the utilization of Theory of Motivated Information Management as a response led to the development of research problem statement. Through comprehensive review of literature published between the years 2005–2019, the paper first identified barriers of information communication in the industry and key performance indicators of construction quality, followed by content analyses to rank and screen out the least important variables. This paved the way for quantitative and qualitative analyses through 180 structured questionnaires and 11 expert opinion sessions that respectively led to the use of systems thinking approach to establish causality.
Findings
The study finds ineffective communication, unclear details, changes in contract, information delays, unpleasant relationships between stakeholders and project complexity as the most critical factors causing information complexity in a construction project. These factors cause a reduction in quality performance of a project through increased rework and decreased implementation of total quality management.
Practical implications
The study will assist project managers to diagnose quality-related issues in their projects, trace them back to the challenges and barriers of information communication and then make policy/strategic interventions to reduce such issues through improved information flow.
Originality/value
Majority of the studies in this field of work have identified the effects of ineffective information flow on overall project performance, but very few have focused specifically on the quality of construction projects.
Details
Keywords
Tisha Meriam Cherian and C. Joe Arun
The strict lockdown during COVID-19 has suspended construction, procurement and logistics in construction industry and affected the entire Supply Chain Management (SCM). The…
Abstract
Purpose
The strict lockdown during COVID-19 has suspended construction, procurement and logistics in construction industry and affected the entire Supply Chain Management (SCM). The COVID-19 has been universally observed in all sectors, but a limited study has been done in construction industry and also the ways to mitigate it. Hence, the current study aims to identify the impact of COVID-19 in Construction Supply Chain (CSC) and to analyse the influence of factors on Supply Chain (SC) performance during uncertainty in the construction industry.
Design/methodology/approach
From previous studies, the factors enhancing the SCM performance are taken. The research follows a qualitative in-depth interview to identify the factors and quantitative study to collect data using a questionnaire. Samples for the study were chosen using purposing sampling techniques. The collected data were analysed using “Statistical Package for Social Science” (SPSS V 20).
Findings
Effect of COVID-19 is more on medium sized builders and developers. A positive impact is found between SC agility, SC resilience and information technology (IT) capabilities on SC performance.
Research limitations/implications
Firstly, the study adopted cross-sectional data to test the hypothesis. The study results on the combined effect of the factors SC agility, SC resilience and IT capability during uncertainty were found to have a positive influence. The longitudinal study would enrich the understanding of the research. Secondly, the study was focussed on the perspective of the dynamic capability view. Further studies can adopt a multi-method approach to develop a theoretical framework using in-depth study and empirical validation. It will help in a better understanding of the current situation and young discipline in SC. Thirdly, the study has considered only Kerala construction companies; hence, the data were less. More data with better results will be obtained if the study has included construction companies from other states. Fourthly, the study can be extended to understand the interdependent effects of SC agility, SC resilience and information technology capability on performance. Presently, the interdependent effect in the study is limited.
Practical implications
The study helps the construction professionals to understand the preventive measures needed for the industry during any uncertainty. Also, the study is expected to help the construction managers and leaders with better performance in SCM and other business activities by adopting IT connectivity and being agile in all situations. Moreover, the study also helps policymakers take active solutions by providing awareness and incentives to the construction industry professionals. The literature and the factors will also help the academicians in further research progress.
Originality/value
The research is important for construction professionals to comprehend the impact of COVID-19 and to analyse the influence of factors such as SC agility, SC resilience and IT capabilities on improving the SC performance. This research can assist private and public construction firms to enhance SC performance during times of uncertainty. The result is likely to help construction companies with better SC performance and helps academicians' further progress in research.
Details