1 – 10 of 143Moses Kwadzo Ahiabu, Fidelis Emuze and Dilip Das
The need to adopt sustainable construction (SC) practices in project activities will be appreciated when clear benefits are known to the stakeholders in Ghana. The purpose of this…
Abstract
Purpose
The need to adopt sustainable construction (SC) practices in project activities will be appreciated when clear benefits are known to the stakeholders in Ghana. The purpose of this study was to evaluate the perceived benefits of using SC practices in building projects.
Design/methodology/approach
A modified Delphi method (MDM) was used to solicit the views of an expert panel on 33 benefits identified from the literature and validated by a pilot panel to ensure robustness. Statistical tools were used to analyse the data collected. The comparative analysis among the expert panel lends credence to the strong consensus reached on the 26 benefits of SC. The consensus reached by the expert panel after the three rounds were validated using the median and important scale of 70% response rate and above.
Findings
The essential benefits included the ability to enhance efficiency and improve the overall quality of life for all. Factors such as mandatory government policies and regulations are recommended as essential drivers to promote and sustain the implementation of SC in Ghana. The findings will enhance the drive for sustainability practices in construction projects in Ghana.
Originality/value
The study contributes to the body of knowledge regarding the benefits of SC from the perspective of experts in the Ghanaian construction industry. The paper would enhance stakeholders understanding the critical benefits of promoting and adopting SC practices in building projects.
Details
Keywords
Kofi Agyekum, Seth Yeboah Botchway, Emmanuel Adinyira and Alex Opoku
Recent reports based on the sustainable development goals (SDGs) have revealed that no country is in line with achieving the targets of the 2030 Agenda for sustainable…
Abstract
Purpose
Recent reports based on the sustainable development goals (SDGs) have revealed that no country is in line with achieving the targets of the 2030 Agenda for sustainable development, with the slowest progress being witnessed mainly on goals that are focused on the environment. This study examines environmental performance indicators for assessing the sustainability of building projects.
Design/methodology/approach
The study uses an explanatory sequential design with an initial quantitative instrument phase, followed by a qualitative data collection phase. An extensive critical comparative review of the literature resulted in the identification of ten environmental sustainability indicators. One hundred and sixty-seven questionnaire responses based upon these indicators from the Ghanaian construction industry were received. Data were coded with SPSS v22, analysed descriptively, and via inferential analysis. These data were then validated through semi-structured interviews with six interviewees who are fellows of their respective professional bodies, a senior academic (professor in construction project delivery) and a government official. Data obtained from the semi-structured validation interviews were analysed through the side-by-side comparison of the qualitative data with the quantitative data.
Findings
The findings from the study suggest that all the indicators were important in assessing building projects' environmental sustainability across the entire life cycle. Key among the identified indicators is the effects of the project on “water quality, air quality, energy use and conservation, and environmental compliance and management”. The interviewees further agreed to and confirmed the importance of these identified indicators for assessing the environmental sustainability of building projects in Ghana.
Originality/value
Compared to existing studies, this study adopts the exploratory sequential design to identify and examine the critical indicators in assessing the environmental sustainability across the entire lifecycle of building projects in a typical developing country setting, i.e. Ghana. It reveals areas of prime concern in the drive to place the local construction industry on a trajectory towards achieving environmental sustainability.
Details
Keywords
Benedict Ansere, Joshua Ayarkwa, Michael Nii Addy, Dickson Osei-Asibey and Ivy Maame Abu
This study aims to assess the awareness and knowledge level of procurement officers (POs) in Ghanaian tertiary educational institutions regarding sustainability in general and…
Abstract
Purpose
This study aims to assess the awareness and knowledge level of procurement officers (POs) in Ghanaian tertiary educational institutions regarding sustainability in general and specifically on environmental sustainability in the Public Procurement Act 2003 (Act 663) as amended.
Design/methodology/approach
Through purposive sampling technique and face-to-face interviews using semi-structured open-ended questions, qualitative data was collected from 19 POs who are well vested in the procurement profession and willingly agreed to partake in the research. The qualitative data were analyzed using content analysis technique to help organize and elicit meaning from the data collected and to draw realistic conclusions from it.
Findings
The results showed that most POs were aware of the Public Procurement Act 2003 (Act 663) as amended, primarily through seminars and workshops organized by the Public Procurement Authority. The interviewees demonstrated a good understanding of sustainable procurement, considering its social, environmental and economic aspects. However, one respondent primarily associated sustainability with only environmental issues. The POs were, however, of the view that the Amended Act 914 (2016) does not give detailed highlights on environmental sustainability, making implementation very difficult, especially regarding the procurement of goods. Overall, the findings indicate a positive level of environmental sustainability awareness and knowledge among the interviewed POs regarding the Public Procurement Act 2003 (Act 663) as amended.
Social implications
The findings from the study could be used by policymakers to strategize educational campaigns by using the POs’ knowledge and awareness to the implementers of Act 663 (2003) as amended to effectively ensure environmental sustainability in procurement practices. The findings from the study have also contributed to the literature on procurement policy by drawing the attention of policy formulators to give equal attention to all the sustainability pillars, i.e. social, economic and environmental. This would consequently help the implementers to contribute to achieving sustainable development.
Originality/value
This study is one of the few empirical qualitative types of research seeking the views of POs in tertiary educational institutions in Ghana on sustainability and environmental sustainability as enshrined in the Public Procurement Act 2003 (Act 663) as amended. The findings give positive feedback to policymakers on the knowledge and awareness level of the POs on environmental sustainability and highlight the importance of awareness programmes and educational initiatives by the Public Procurement Authority and other stakeholders to ensure compliance with the Act.
Details
Keywords
Aba Essanowa Afful, Joshua Ayarkwa, Godwin Kojo Kumi Acquah, Ama Antwi Darkwa Ossei Assibey and Dickson Osei-Asibey
The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems…
Abstract
Purpose
The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems approach. Through a review of extant literature, this study contributes to knowledge of the global delivery of ESBs by identifying research trends and gaps that can be tackled in future research, and current hotspots in capacity building (CB) research within the built environment (BE). The adopted systems approach to CB postulates that the construction industry is systemized in nature, and thus, CB solutions within the industry should be approached from a systems approach.
Design/methodology/approach
A literature search was conducted using the Scopus search engine, augmented by Google Scholar and Web of Science, to produce 54 relevant articles for analysis. The scientometric analysis was undertaken with the use of VOSViewer to better understand the broad literature on CB in the construction industry which would not have been possible with traditional data analysis. The content analysis allowed, for a systematic review of selected articles, to reveal key themes in this study.
Findings
Through a content analysis, four levels of CB were identified within the construction industry; individual level, organizational level, industry level and state level. Nine sub-capacities were subsumed under the four identified levels adopted from Potter and Brough (2004), including but not limited to Performance capacity, Workload capacity, Supervisory capacity, Industry Role capacity and Systems capacity. Under each sub-capacity, key questions were posed to aid identify the capacity needs of BE professionals. A framework for identifying capacity needs in the BE is proposed.
Practical implications
The findings of this study serve as a useful reference for practitioners and policymakers to assess their level of commitment to CB efforts for ESB delivery. The findings of this study have revealed that building the capacities of BE professionals to deliver ESBs should be addressed as part of a broader framework, interdependent on the other levels of CB in the systemic construction industry.
Originality/value
As a review study identifying capacity needs for BE professionals to deliver ESBs, this study enhances knowledge of CB within the construction industry.
Details
Keywords
Aba Essanowa Afful, Ama Darkwah Darkwah Osei Assibey Antwi, Joshua Ayarkwa and Godwin Kojo Kumi Acquah
This study aims to explore the impact of the indoor environment on recovery from COVID-19 infections. Extant literature on the impact of the four key themes of the indoor…
Abstract
Purpose
This study aims to explore the impact of the indoor environment on recovery from COVID-19 infections. Extant literature on the impact of the four key themes of the indoor environment (indoor air quality, indoor thermal quality, daylighting and visual comfort, and acoustic comfort) on COVID-19 infection and recovery rates were reviewed.
Design/methodology/approach
Data collection for this study was based on extant literature within the Scopus database and scoped to a time frame of 2020–2021 because the topical issue of indoor environmental quality (IEQ) and its impact on COVID-19 arose in the wake of the pandemic. In total, 224 documents were systematically desk reviewed from various journals.
Findings
The study identified that air pollutants such as PM2.5 and PM10 as well as air-conditioned places, low ambient temperatures, poor ventilation and no views of the outdoor environment were deteriorating factors for COVID-19 patients. On the other hand, proper ventilation, the use of air cleaners, views of the outdoor environment and allowance for ample daylighting were improvement factors for COVID-19 patients. The inter-relationship of the various concepts was presented in an ontology chart.
Practical implications
As COVID-19 still exists and keeps evolving, this study provides suggestions to industry professionals, especially health-care Facility Managers, to create a post-pandemic environment focusing on the IEQ and finding long-term and reliable solutions for the well-being of occupants. Adaptability is crucial. New, creative technology solutions are being introduced daily, but it is up to the facility managers and health-care professionals to analyse and specify the most cost- and outcome-effective technologies for their facility.
Originality/value
The study brought to light the pivotal role of the indoor environment on the health and well-being of occupants, particularly in the contraction, spread, prevention and control of infectious diseases such as COVID-19.
Details
Keywords
Safowaa Osei-Tutu, Joshua Ayarkwa, Dickson Osei-Asibey, Gabriel Nani and Aba Essanowa Afful
This study aimed to identify barriers impeding circular economy (CE) uptake in the construction industry in literature, categorize them for the development of a framework and to…
Abstract
Purpose
This study aimed to identify barriers impeding circular economy (CE) uptake in the construction industry in literature, categorize them for the development of a framework and to seek the interrelationships among the categorized barriers. This allowed for identifying integrated solutions to holistically address the barriers. The study also sought to identify the “hot” themes, the knowledge gaps and future research directions on barriers impeding CE.
Design/methodology/approach
Forty-eight relevant articles were desk reviewed from different construction peer-reviewed journals and published conference papers. A scientometric analysis allowed for co-occurrence of keywords relating to CE. A content analysis enabled the identification of 79 barriers impeding the uptake of CE in the construction industry which were further categorized into six distinct categories for the development of a framework showing the interrelationships among the categorized barriers.
Findings
The identified barriers include construction sector inertia, lack of design standards, lack of knowledge, awareness and understanding, design cost, and perception of second-hand materials as substandard among others. The study categorized the identified barriers for better understanding into six different groups: cultural barriers, social barriers, environmental barriers, economic barriers, technical barriers and technological barriers. Strategies to address the barriers were also proposed. The interrelationships among the various barriers were also shown in a proposed framework to educate professionals on the interconnectivity of the barriers.
Practical implications
Categorization of the various barriers impeding CE uptake contributes to the body of knowledge. Also, the interrelationships among the various categorized barriers in the framework will enable construction professionals make informed decisions regarding the successful integration of CE in the industry, better appreciate the barriers that impede CE uptake and apply strategies to holistically address the barriers. This will expand current knowledge outside the narrow scope of isolated barriers.
Social implications
To the global construction industry, the review presents a list of barriers and their interrelationships that could provide implementation strategies for the uptake of CE in the industry.
Originality/value
The geographical scope of this study is not limited, and therefore encourages wide applicability of the findings to the global construction industry.
Details
Keywords
Okechukwu Bruno-Kizito Nwadigo, Nicola Naismith, Ali GhaffarianHoseini, Amirhosein GhaffarianHoseini and John Tookey
Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to…
Abstract
Purpose
Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.
Design/methodology/approach
The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.
Findings
The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.
Originality/value
This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.
Details
Keywords
Aba Essanowa Afful, Joshua Ayarkwa, Godwin Kojo Kumi Acquah, Dickson Osei-Asibey and Ama Antwi Darkwah Osei Assibey
This research presents a comprehensive review of the literature on the barriers to incorporating indoor environmental quality (IEQ) principles into building designs. The aim was…
Abstract
Purpose
This research presents a comprehensive review of the literature on the barriers to incorporating indoor environmental quality (IEQ) principles into building designs. The aim was to identify these barriers in the literature and subsume them under broad categories for the development of a framework showing the interrelationships among the barriers.
Design/methodology/approach
The research design used a systematic desktop review which comprised of three levels of screening. The first level allowed for a broad selection of papers; the second level of screening was done to limit the results to papers within the construction industry, and the third level of screening limited the documents strictly to the publication period of 2000–2021.
Findings
Twenty-four (24) barriers were identified in the literature, including lack of integrated design teams, which ranked the highest in appearance, high initial costs, poor market for IEQ buildings and higher design charges among others. The identified barriers were classified into six (6) categories namely capacity barriers, economic barriers, process-related barriers, cultural barriers, client-related barriers and steering barriers.
Practical implications
The findings of this study would enable practitioners and policymakers to better understand what is preventing the widespread adoption of IEQ designs in the built environment and devise actionable strategies to overcome them. It adds to the body of knowledge on IEQ research by categorizing the various barriers that prevent the delivery of IEQ projects.
Social implications
The developed barriers in this research can serve as a useful checklist to future researchers who may want to validate the barriers to IEQ designs in empirical studies and in different settings.
Originality/value
The interconnectivity revealed by the web-like framework allows for an appreciation of the various barriers of IEQ adoption which would help in expanding the current knowledge on IEQ beyond the narrow scope of isolated barriers. The fact that the papers selected in this study are not limited geographically, underscores the wide applicability of the findings in the global construction industry.
Details
Keywords
Frank Ato Ghansah, De-Graft Owusu-Manu, Joshua Ayarkwa, David John Edwards and M. Reza Hosseini
While smart building technologies (SBTs) implementation ensures sustainability, their adoption is hampered by latent barriers, especially in project management processes. These…
Abstract
Purpose
While smart building technologies (SBTs) implementation ensures sustainability, their adoption is hampered by latent barriers, especially in project management processes. These latent barriers must be addressed to facilitate the successful and widespread adoption of SBTs. Therefore, this study aims to explore the significant latent barriers inhibiting the project management processes in adopting SBTs in developing countries.
Design/methodology/approach
A positivist research philosophy couched within a deductive approach was adopted to undertake a quantitative questionnaire survey of 227 project management and design team participants. Descriptive and inferential analytical tools (including a one sample T-test and exploratory factor analysis) were then adopted to interpret data collected.
Findings
The results reveal that the “high cost of smart sustainable materials and equipment” is the major significant barrier hindering the adoption of SBTs in developing countries. Latent barriers were: “structure and time-related barriers,” “construction-related barriers” and “human, policy and cost-related barriers”.
Originality/value
The study contributes novel insights into the prevailing nascent discourse on SBTs from the perspectives of construction project managers and design teams in developing countries, particularly. Furthermore, to the best of the authors’ knowledge, this is the first study that ascertains the significant barriers inhibiting project management processes in adopting SBTs in developing countries.
Details
Keywords
Emmanuel Nsiah Ankomah, Joshua Ayarkwa and Kofi Agyekum
The purpose of this study is to ascertain the extent to which the practices of small and medium building contractors (SMBCs) conform to lean construction (LC) principles…
Abstract
Purpose
The purpose of this study is to ascertain the extent to which the practices of small and medium building contractors (SMBCs) conform to lean construction (LC) principles. Ultimately, practical results encourage a discourse on the true potentials and challenges to the holistic uptake of LC principles in the Ghanaian construction industry.
Design/methodology/approach
This research is based on a qualitative case study approach. The data was obtained through face-to-face structured interviews.
Findings
Across the cases, it was realized that there is a low-level application of LC principles among SMBCs. There was no indication that lean concepts were used on a company-wide basis in the Ghanaian construction industry. Furthermore, the study revealed that the traditional wasteful approach to managing construction projects was still prevalent among the firms.
Practical implications
This paper uses the 4P model as a foundation for assessing the extent to which the practices of SMBCs conform to LC principles. Practically, the study also created a certain level of awareness among the SMBCs about LC, LC principles and the benefits of the application of these principles within organizations.
Originality/value
This study contributes to the body of knowledge as it uncovers the status of LC implementation among SMBCs in the Ghanaian construction industry. The findings that are presented in this paper can be used as a starting point to disseminate the research and practice of LC among SMBCs.
Details