Table of contents
Prevention through design: Trade‐offs in reducing occupational health and safety risk for the construction and operation of a facility
Helen Lingard, Tracy Cooke, Nick Blismas, Ron WakefieldThe research aims to explore the interaction between design decisions that reduce occupational health and safety (OHS) risk in the operation stage of a facility's life cycle and…
A framework for stakeholder management and corporate culture
Jason von Meding, Keith McAllister, Lukumon Oyedele, Kevin KellyThis paper aims to investigate the link between two knowledge areas that have not been previously linked conceptually: stakeholder management and corporate culture. Focussing on…
Modeling and assessment of competencies in urban local bodies for implementing PPP projects
Ganesh A. Devkar, Satyanarayana N. KalidindiThe weak competencies in urban local bodies (ULBs) for implementing public private partnership (PPP) projects are recognized as a major hurdle in uptake of the PPP model in India…
External agencies for supplementing competencies in Indian urban PPP projects
Ganesh A. Devkar, Satyanarayana N. KalidindiThe purpose of this paper is to analyze involvement of external agencies for supplementing competencies in Indian urban public private partnership (PPP) projects. There are two…
Value through innovation in long‐term service delivery : Facility management in an Australian PPP
Graham Brewer, Thayaparan Gajendran, Marcus Jefferies, Denny McGeorge, Steve Rowlinson, Andrew DaintyPublic‐private partnerships (PPPs) and other innovative procurement mechanisms are frequently used to deliver both an asset and a public service over a protracted period. The…
PFI/PPP, private sector perspectives of UK transport and healthcare
Robert Eadie, Phillip Millar, Rory GrantPublic private partnerships (PPP) and the private finance initiative (PFI) are defined as a range of practical long‐standing relationships between the public and private sectors…
Bathtub curves and pipe prioritization based on failure rate
Amarjit Singh, Stacy AdachiThe purpose of this paper is to analyze conditional failure rates, and prioritize water pipelines for replacement based on their expected failure rate where pipes are grouped…
Use of ANNs in complex risk analysis applications
Nayanthara De Silva, Malik Ranasinghe, C.R. De SilvaArtificial neural network (ANN) has been used for risk analysis in various applications such as engineering, financial and facilities management. However, use of a single network…
Strategies for construction waste management in Ho Chi Minh City, Vietnam
Florence Yean Yng Ling, Dinh Song Anh NguyenThere is a lack of waste minimization in Vietnam. This study aims to investigate the barriers that are faced in implementing waste management and the extent to which waste…
ISSN:
2044-124Xe-ISSN:
2044-1258ISSN-L:
2044-124XOnline date, start – end:
2011Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditor:
- Prof. Mohan Kumaraswamy