Table of contents
Current state of construction enterprise information systems: survey research
Omer Tatari, Daniel Castro‐Lacouture, Mirosław J. SkibniewskiThe paper's purpose is to describe and examine the level of utilisation of construction enterprise information systems (CEIS) and to identify critical success factors and benefits…
1194
A non‐linear optimisation technique based on the complex method: The optimal design of a concrete trough supporting a new lightweight rail track system, LR55
H. Al Nageim, D. PountneyThe aim is to present findings of a theoretical analysis for optimal design of a concrete trough for a new lightweight low‐profile rail track system.
858
Application of treemaps to the analysis of competitively bid project cost overruns
T.P. WilliamsCompetitively bid construction projects are often completed for amounts greater than the original low‐bid amount. Improved methods of predicting a projects potential to experience…
935
Planning and implementation of effective collaboration in construction projects
M. Shelbourn, N.M. Bouchlaghem, C. Anumba, P. CarrilloThe twenty‐first century is now seen as the time for the construction industry to embrace new ways of working if it is to continue to be competitive and meet the needs of its ever…
6190
ISSN:
1471-4175e-ISSN:
1477-0857ISSN-L:
1471-4175Online date, start – end:
2001Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditors:
- Professor Peng Wu
- Professor Srinath Perera