Controlling construction waste by implementing governmental ordinances in Hong Kong
Vivian W.Y. Tam, L.Y. Shen, Ivan W.H. Fung, J.Y. WangOwing to limited space, reducing the waste going to landfills has become a pressing issue in Hong Kong. As most of the solid waste was generated from construction activity, the…
Estimating productivity using simulation: A case study of Gaza beach embankment protection project
R.N. Rustom, A. YahiaRecently, there has been increased interest in the use of simulation for real‐time planning, scheduling, control of construction projects and obtaining optimum productivity. The…
A systematic procedure for developing the 3D model to evaluate the construction project progress
Zubair Ahmed Memon, Muhd Zaimi Abd., Mushairry MustaffarThis main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM…
Application of line‐of‐balance and 4D CAD for lean planning
A. Björnfot, R. JongelingThe purpose of this paper is to suggest the application of the line‐of‐balance (LoB) scheduling technique in combination with a 4D CAD workspace model as a method to improve the…
ISSN:
1471-4175e-ISSN:
1477-0857ISSN-L:
1471-4175Online date, start – end:
2001Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditors:
- Professor Peng Wu
- Professor Srinath Perera