Table of contents
Risk management and contingency sum of construction projects
Terence Y.M. Lam, Njavwa SiwingwaMost organisations do not have established guidelines for the estimation and management of contingency funds. The purpose of this paper is to identify the risk factors at the…
Factors affecting tender price in the Ghanaian construction industry
Ernest Kissi, Theophilus Adjei-Kumi, Edward Badu, Emmanuel Bannor BoatengTender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI…
Latent geotechnical pathogens inducing cost overruns in highway projects
Alolote Ibim Amadi, Anthony HighamThis paper aims to investigate the statistical validity of geotechnical risk factors in accounting for cost overruns in highway projects. The study hypothesises that “latent…
The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman
Adekunle Sabitu Oyegoke, Naseer Al KiyumiProject delay is becoming a problem in the Sultanate of Oman as evidenced by many delayed projects across the country. The purpose of this study is to examine causes and effects…
Investor perspectives on property crowdfunding: evidence from Australia
Braam Lowies, Christa Viljoen, Stanley McGrealThe purpose of this study is to investigate the perceptions of property investors of the risks and returns associated with property crowdfunding as an investment vehicle. The…
Project bank accounts: the second wave of security of payment?
Rachel Griffiths, Wayne Lord, Jeremy CogginsThe purpose of this study is to identify building contractors’ views as to the need for, impact of and barriers to the use of project bank accounts (PBAs) in the UK construction…
ISSN:
1366-4387e-ISSN:
1759-8443ISSN-L:
1366-4387Online date, start – end:
2005Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditors:
- Dr Peadar Davis
- Dr Kaushal Keraminiyage