Modelling of tri-parameter bidding integrating cost, time and risk: a stochastic approach
Mohamad Rabie, Sameh El-SayeghThis paper aims to propose a new tri-parameter bidding model integrating cost, time and risk. The key value of the model is that it remains within the framework of the competitive…
Prioritizing cost management system considerations for Nigerian housing projects
Lovelin Ifeoma Obi, Mohammed Arif, Dennis J. KulondaThis study aims to develop a success factor model to understand and facilitate improved cost management system (CMS) implementation in low-cost housing (LcH) project delivery in…
São Paulo’s office market: scenario for the next years
Claudio Tavares de Alencar, João Rocha Lima, Eliane MonettiThe purpose of this paper is to simulate possoble scenarios of São Paulo’s office market recovering. In 2006, a previous paper that dealt with the same issue was published which…
Financial performance and operating strategies of Malaysian property development companies during the global financial crisis
Toong Khuan Chan, Abdul-Rashid Abdul-AzizThe purpose of this paper is to characterise the financial performance and to identify the operating strategies of property development companies in Malaysia during the 2008…
Analysis of schedule deviations in road construction projects and the effects of project physical characteristics:
Ibrahim MahamidThis study aims to investigate the schedule deviation in road construction projects and the effect of project physical characteristics on schedule deviations. The study also…
Procurement strategies for enhancing exploration and exploitation in construction projects
Per Erik ErikssonThe purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.
ISSN:
1366-4387e-ISSN:
1759-8443ISSN-L:
1366-4387Online date, start – end:
2005Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditors:
- Dr Peadar Davis
- Dr Kaushal Keraminiyage