Table of contents
Joint reliability based design and periodic preventive maintenance policy for systems sold with warranty
M.N. Darghouth, Daoud Ait-Kadi, Anis ChelbiThe authors consider a system which is a part of a complex equipment (e.g. aircraft, automobile, medical equipment, production machine, etc.), and which consists of N independent…
Ranking of barriers for effective maintenance by using TOPSIS approach
Rajesh Kumar Singh, Ayush Gupta, Ashok Kumar, Tasmeem Ahmad KhanIn present context of globalization, maintenance of production systems is very important. Many of the organizations are facing a lot of problems in maintenance management…
An optimal production/maintenance strategy under lease contract with warranty periods
Zied Hajej, Nidhal Rezg, Gharbi aliThe purpose of this paper is to investigate the optimal production policy and maintenance strategy for leased equipment under a lease contract with warranty periods. In order to…
Enhancing building maintenance cost performance with proper management of spare parts
Cheong Peng Au-Yong, Azlan Shah Ali, Faizah AhmadScheduled building maintenance requires appropriate and adequate spare parts to replace existing parts on a regular basis. Management of spare parts is seen as an important…
Adapting the SHEL model in investigating industrial maintenance
Lasse Metso, Salla Marttonen, Nils E. Thenent, Linda B. NewnesThe purpose of this paper is to identify and categorise problems in knowledge management of industrial maintenance, and support successful maintenance through adapting the SHEL…
Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
Ratapol WudhikarnThe purpose of this paper is to describe the overall equipment cost loss (OECL) methodology and an implementation of this methodology, to compare the outcomes of OECL with those…
The utilization of ISO 9004: case study of the maintenance area of a public transportation company
Rosângela Maria Vanalle, Wagner Cezar Lucato, Roberto Torres RodriguesThe continuous improvement in the performance and satisfaction of all stakeholders is a permanent management objective and part of an organisation’s strategy. To achieve this…
ISSN:
1355-2511e-ISSN:
1758-7832ISSN-L:
1355-2511Online date, start – end:
1995Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditor:
- Prof Salih O'Duffua