Table of contents
Ripple effect of disruptions on performance in supply chains: an empirical study
An Thi Binh Duong, Tho Pham, Huy Truong Quang, Thinh Gia Hoang, Scott McDonald, Thu-Hang Hoang, Hai Thanh PhamThe present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.
Investigating the role of digitalisation in building collapse: stakeholders' perspective from unexplored approach
Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa, Mohamad Shaharudin SamsurijanStudies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…
Appraising alternative building technologies adoption in low-cost housing provision to achieving Sustainable Development Goal 11
Andrew Ebekozien, Clinton Ohis Aigbavboa, Mohamad Shaharudin SamsurijanThough alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…
Modelling the domino effect of advance payment system on project cash flow and organisational performance
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu, Onimisi ObariPrevious studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Integrated artificial and deep neural networks with time series to predict the ratio of the low bid to owner estimate
Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair, Khalid S. Al-GahtaniThe variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…
Mediating role of work engagement in the relationship between supervisor support and turnover intention among construction workers
Ernest Kissi, Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Eugene Danquah Smith, Prosper Babon-AyengWhile existing research has explored the association between supervisor support and turnover intention among construction workers, there is a notable gap in the literature…
Process model for international building permit benchmarking and a validation example using the Israeli building permit process
Judith Fauth, Tanya Bloch, Lucio SoibelmanBuilding permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to…
Help, I am not coping with my job! – A work-life balance strategy for the Eswatini construction industry
Douglas Aghimien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Nicholas Chileshe, Bhekinkosi Jabulani DlaminiThis paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the…
Understanding the BIM actor role: a study of employer and employee preference and availability in the construction industry
Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa, Obuks Augustine EjohwomuThe implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…
Project control system (PCS) implementation in engineering and construction projects: an empirical study in Saudi’s petroleum and chemical industry
Sahar Jawad, Ann Ledwith, Rashid KhanThere is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…
Public procurement of engineering services: the influence of task characteristics on organisational control
Klara Granheimer, Tina Karrbom Gustavsson, Per Erik ErikssonPrior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…
Can ChatGPT exceed humans in construction project risk management?
Roope Nyqvist, Antti Peltokorpi, Olli SeppänenThe objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context…
Evaluating the impact of material service life on embodied energy of residential villas in the United Arab Emirates
Abdul Rauf, Daniel Efurosibina Attoye, Robert H. CrawfordRecently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received…
People, space use and objects: an UWB-based quantifying approach for post-occupancy evaluation of new architectural spaces
Daniel Nygaard Ege, Pasi Aalto, Martin SteinertThis study was conducted to address the methodical shortcomings and high associated cost of understanding the use of new, poorly understood architectural spaces, such as…
Predicting construction project compliance with machine learning model: case study using Portuguese procurement data
Luís Jacques de Sousa, João Poças Martins, Luís SanhudoFactors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s…
Mentorship as a tool for improving construction artisan's skills to achieve sustainable development Goal 8 via qualitative approach
Andrew Ebekozien, Clinton Ohis Aigbavboa, Mohamad Shaharudin Samsurijan, John Aliu, Angeline Ngozika Chibuike NwaoleThe paucity of artisans in some construction trades and the transitioning of the experience of the few for sustainability calls for concern. Mentorship programmes offer a…
Sustainable development goals under threat: the impact of inflation on construction projects
Andrew Ebekozien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Mohamed Ahmed Hafez, Mohamad Shaharudin SamsurijanDespite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is…
A group decision-making model for architectural programming in megaprojects
Huijun Tu, Shitao JinDue to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible…
A LSTM algorithm-driven deep learning approach to estimating repair and maintenance costs of apartment buildings
Ji-Myong Kim, Sang-Guk Yum, Manik Das Adhikari, Junseo BaeThis study proposes a deep learning algorithm-based model to predict the repair and maintenance costs of apartment buildings, by collecting repair and maintenance cost data that…
Adoption challenges of building information modelling (BIM) and off-site construction (OSC) in healthcare construction: are they fellow sufferers?
Tan Tan, Grant Mills, Xiaolin Ma, Eleni PapadonikolakiOff-Site Construction (OSC) has received much government and public attention during and after COVID. Building Information Modelling (BIM) is an initiative discussed widely to…
The role of apprenticeship in skills development of construction artisans to achieving Sustainable Development Goal 8: stakeholders’ unexplored approach
Andrew Ebekozien, Clinton Ohis Aigbavboa, Mohamad Shaharudin Samsurijan, Wellington Didibhuku Thwala, Mohamed Ahmed Hafez AhmedStudies show that apprenticeships can enhance skills development and economic growth. There is a paucity of academic literature concerning apprenticeship’s role in developing…
Construction and demolition waste management in the United Arab Emirates through the 3R principle
Shadeedha Mohamed Saradara, Juan Carlos Flores Lara, Vikas Swarnakar, Abdul Rauf, Rubina Qureshi, Mutasem El Fadel, Malik Mansoor Ali KhalfanThis study reviews policies, green building regulations, key performance indicators (KPIs) and management methods related to construction and demolition waste (CDW) in the United…
ISSN:
0969-9988e-ISSN:
1365-232XISSN-L:
0969-9988Online date, start – end:
1994Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditor:
- Professor Chimay Anumba