Table of contents
Multinational contracting and the eclectic paradigm of internationalization
Azmeri Rahman, Adrian J. Bridge, Steve Rowlinson, Bryan Hubbard, Bo XiaThe purpose of this paper is to present a novel version of Dunning’s eclectic paradigm of internationalisation (OLI framework) to explain both inbound and outbound Foreign Direct…
Challenges and drivers for data mining in the AEC sector
Vian Ahmed, Zeeshan Aziz, Algan Tezel, Zainab RiazThe purpose of this paper is to explore the current challenges and drivers for data mining in the AEC sector.
Stakeholder complexity in large scale green building projects: A holistic analysis towards a better understanding
Ka Yan Mok, Geoffrey Qiping Shen, Rebecca YangIn response to the world’s rising awareness on sustainability, industry players and policymakers are devoting great efforts to bolster green building developments. Every green…
Integrating value management into sustainable construction projects in Hong Kong
Ann Tit Wan Yu, Arshad Ali Javed, Tsun Ip Lam, Geoffrey Qiping Shen, Ming SunIntegrating sustainability into the value management (VM) process can provide a strategic platform for promoting and incorporating sustainable design and development during the…
A simulation-based framework for concurrent safety and productivity improvement in construction projects
Farshid Baniassadi, Amin Alvanchi, Ali MostafaviSafety and productivity are key concerns in the construction projects. While safety looks to the construction workers need to work in a safe environment, productivity affects the…
Construction projects as mechanisms for knowledge integration: Mechanisms and effects when diffusing a systemic innovation
John Lindgren, Stephen Emmitt, Kristian WidénThe purpose of this paper is to study knowledge integration (KI) when diffusing a systemic innovation. The objectives are to understand what mechanisms are used and when and what…
Causes of delays in the construction phase of Chinese building projects
Ting-Kwei Wang, David N. Ford, Heap-Yih Chong, Wei ZhangDelays during construction are one of the common scenarios in the construction industry. The purpose of this paper is to identify the primary causes of delays in the construction…
ISSN:
0969-9988e-ISSN:
1365-232XISSN-L:
0969-9988Online date, start – end:
1994Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditor:
- Professor Chimay Anumba