Table of contents
Risk perception and propensity in bid/no-bid decision-making of construction projects
Yong Qiang Chen, Su Juan Zhang, Li Sha Liu, Jia HuMaking the right bid/no-bid decision is critical to the success and development of construction contracting enterprises. Decision makers’ personal characteristics, such as risk…
Linking employee empowerment with productivity in off-site construction
Faisal Alazzaz, Andrew WhyteThe purpose of this paper is to address current knowledge gaps in off-site sub-element fabrication efficiency factors, by identifying an explicit relationship between productivity…
Valuing innovation in construction and infrastructure: Getting clients past a lowest price mentality
Martin Loosemore, Justin RichardThe purpose of this paper is to continue the discussion about the actual and potential role of clients in driving more innovation in the construction sector through interviews…
Statutory adjudication in Western Australia: adjudicators’ views
Ping Yung, Kieran Rafferty– The purpose of this paper is to evaluate the effectiveness of the statutory adjudication legislation in Western Australia against its stated aims.
Strategies for improving energy saving behaviour in commercial buildings in Malaysia
Nurul Sakina Mokhtar Azizi, Suzanne Wilkinson, Elizabeth FassmanThe purpose of this paper is to investigate the level of energy saving behaviour between green and conventional office buildings in Malaysia to determine if people in green…
Risk management implementation in small and medium enterprises in the UK construction industry
Ali Rostami, James Sommerville, Ing Liang Wong, Cynthia LeeThe competition and challenges facing construction firms during the recent recession have brought risk management (RM) to the fore in people’s minds. Examination of the…
The relationship between pre-construction decision-making and the effectiveness of risk control: Testing the time-safety influence curve
Helen Lingard, Lance Saunders, Payam Pirzadeh, Nick Blismas, Brian Kleiner, Ron WakefieldThe purpose of this paper is to explore the relationship between the timing with which decisions are made about how to control work health and safety (WHS) risks in construction…
ISSN:
0969-9988e-ISSN:
1365-232XISSN-L:
0969-9988Online date, start – end:
1994Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditor:
- Professor Chimay Anumba