Table of contents
Project specific partnering
ROBERT K. LORAINEThe scope of this paper covers the development of partnering since 1985. It starts with the early associations that were formed in the petrochemical and process industries between…
Concession contracts for power generation
ANTONY MERNA, NIGEL J. SMITHConcession contracts provide a mechanism for transferring the traditional public sector client roles of market research, project appraisal, project financing, operation and…
Evaluating performance potential in the selection of construction contractors
GARY D. HOLT, PAUL O. OLOMOLAIYE, FRANK C. HARRISA quantitative contractor selection technique which embraces the pre‐qualification, evaluation and final selection processes is being developed. The emphasis is on evaluating…
Estimator: a prototype of an integrated bid preparation system
TAREK HEGAZY, OSAMA MOSELHICompiling bid proposals for construction projects is a process that depends on extensive computation as well as on experience‐based judgement. Despite the proliferation of…
A facility programming information framework
GREGORY M. PERKINSON, VICTOR E. SANVIDO, FRANCOIS GROBLERThis paper presents a conceptual framework to store, manage and retrieve facility programming information called a Facility Programming Product Model (FPPM). The FPPM represents…
ISSN:
0969-9988e-ISSN:
1365-232XISSN-L:
0969-9988Online date, start – end:
1994Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditor:
- Professor Chimay Anumba