Application of complex network theory in identifying critical elements of CRH2 train system

Huiru Zhang (State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing, China and School of Traffic and Transportation, Beijing Jiaotong University, Beijing, China)
Limin Jia (State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing, China and Beijing Engineering Research Center of Urban Traffic Information Intelligent Sensing and Service Technologies, Beijing, China)
Li Wang (School of Traffic and Transportation, Beijing Jiaotong University, Beijing, China and Beijing Engineering Research Center of Urban Traffic Information Intelligent Sensing and Service Technologies, Beijing, China)
Yong Qin (State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing, China)

Smart and Resilient Transportation

ISSN: 2632-0487

Article publication date: 10 December 2020

Issue publication date: 10 December 2020

817

Abstract

Purpose

Based on complex network theory, a method for critical elements identification of China Railway High-speed 2 (CRH2) train system is introduced in this paper.

Design/methodology/approach

First, two methods, reliability theory and complex theory, are introduced, and the advantages and disadvantages for their application in identifying critical elements of high-speed train system are summarized. Second, a multi-layer multi-granularity network model including virtual and actual nodes is proposed, and the corresponding fusion rules for the same nodes in different layers are given.

Findings

Finally, taking CRH2 train system as an example, the critical elements are identified by using complex network theory, which provides a reference for train operation and maintenance.

Originality/value

A method of identifying key elements of CRH2 train system based on integrated importance indices is introduced, which is a meaningful extension of the application of complex network theory to identify key components.

Keywords

Citation

Zhang, H., Jia, L., Wang, L. and Qin, Y. (2020), "Application of complex network theory in identifying critical elements of CRH2 train system", Smart and Resilient Transportation, Vol. 2 No. 1, pp. 35-52. https://doi.org/10.1108/SRT-03-2020-0002

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Huiru Zhang, Limin Jia, Li Wang and Yong Qin.

License

Published in Smart and Resilient Transportation. Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence maybe seen at http://creativecommons.org/licences/by/4.0/legalcode


1. Introduction

1.1 Background

Because of its advantages of rapid speed, high frequency and good service, the high-speed railway system has become a national business card. China’s high-speed railway mileage reached 29,000 kilometers until the end of 2018, more than 66% of the world’s total and is still in a period of rapid development (People’s Transportation Network, 2019). According to the medium and long-term railway network planning, a high-speed railway network with the main framework of “eight vertical eight horizontal” will be formed by 2030 (National Railway Administration, 2016).

At present, there are many types of high-speed trains in China such as CRH1, CRH2, CRH3, CRH5, CRH6 and CRH380 and each type of train is slightly different to meet the requirements of different operation scenarios. Among them, the CRH2 train is widely used, mainly serving various new high-level railways such as national trunk railways, interregional trunk railways and intercity suburban railways. Therefore, the CRH2 train is studied as an example in this paper. A high-speed train system is an extremely complex system with tens of thousands of components with different structures and functions (He, 2007a, 2007b). The train system, also called the equipment system, includes six subsystems and there are interaction relationships between these subsystems. Furthermore, each subsystem consists of a large number of elements with interactional relations (Figure 1).

The identification of system-level critical elements is of great practical significance, which is conducive to maintaining the safety and reliability of high-speed railway system. On the one hand, it can support the reliability improvement and optimization during the design stage. On the other hand, it can also reasonably allocate the detection and maintenance resources during the operational phase. Because of the large scale and high complexity of high-speed train systems, system-level critical element identification methods that require a large number of reliability tests and statistical data become infeasible. In practice, however, only a small amount of experimental data, field data and engineering experience information is available (Lin et al., 2018). Therefore, a more cost-effective identification method is needed in high-speed railway systems to achieve operational reliability, availability, maintainability and supportability (Saraswat and Yadava, 2008).

1.2 Related literature

The critical elements of the high-speed train system refer to the unit that plays an important role in maintaining the global topology and normal functions. The importance measure is the common method of system-critical elements identification, which can be roughly divided into the following two types.

1.2.1 Importance measurement based on reliability theory.

In the existing research on the identification of critical elements, important indices of reliability have been widely used. Birnbaum’s importance is a sensitivity analysis method widely used in the field of component reliability (Wang et al., 2004). Critical importance is usually combined with fault tree analysis to measure the impact of failed critical components on system failures (Espiritu et al., 2007; Lambert, 1975). The reliability achievement worth (RAW) importance mainly measures the importance of the component to maintain the current reliability level of the system, and alternately, the reliability reduction worth (RRW) importance is mainly used to analyze the degree of influence on the current reliability level of the system when the component is always unreliable (Bisanovic et al., 2016). Fussell-Vesely’s importance is mainly used to evaluate the influence of a minimal cut set containing at least one failed component on the system reliability (Van Der Borst and Schoonakker, 2001). The Bayesian reliability importance measures the probability that a component fails given that the system fails (Zhu and Kuo, 2014).

In general, the following assumptions are made before the analysis of reliability importance.

  • Failure probabilities and repair times are independent.

  • Component states and associated probabilities are known.

However, in real systems, components are interdependent in the process of implementing functions and reliability also affects each other (Dobson et al., 2007). Therefore, for a complex system such as the high-speed train system, it is almost infeasible to accurately obtain information on the reliability importance of each component to identify critical components, which is also uneconomical.

1.2.2 Importance measurement based on complex network theory.

As the groundbreaking work of Watts and Strogatz (1998) regarding small-world networks and Barabási and Albert (1999) regarding scale-free networks, real-word phenomena have begun to be studied from the perspective of actual networks and network theory. Taking components as nodes and connecting relationships as arcs are the main mean of abstracting actual systems into complex networks (Lin et al., 2018; Wang et al., 2017). Kou et al. (2018) proposed a new method that can better use the theory of network flow to represent the network: arcs represent the components, and nodes are the transitive relation. For the distributed and complex electromechanical system, Wang et al. (2016) generated a penetrable visibility graph method that combines the phase space reconstruction method. Topological features include degree centrality (DC), betweenness centrality (BC), closeness centrality (CC), etc (Bonacich, 2007; Brandes et al., 2016; Chen et al., 2012; Du et al., 2015; Hu et al., 2015).

The application of the topological approach to measure importance is quite popular. On the one hand, it has obvious advantages in the analysis of complex systems because it is relatively simple to use. On the other hand, it offers the capability of identifying elements of structural reliability, i.e. network edges and nodes whose failure can induce severe damage to the network through the physical disconnection of its parts. However, the traditional complex network approach only focuses on the topology characteristics of the network and ignores the physical significance of the components (Hines and Blumsack, 2008; Zio and Golea, 2012). In this respect, it is important to possibly overcome these limitations by complementation with more actual characteristic analyzes on components of complex systems (Bompard et al., 2009).

1.3 Contributions

A method of identifying key elements of the CRH2 train system based on integrated importance indices is introduced, which is a meaningful extension of the application of complex network theory to identify key components. Our work makes two important contributions.

  1. A multi-layer multi-granularity network model suitable for the identification of critical elements in the high-speed train system is presented, including virtual nodes and actual nodes. The rules for merging edges of the same component at different layers are given.

  2. Considering the topology structure, actual function and risk characteristics of the high-speed train system, an integrated importance ranking algorithm based on entropy weight and grey relation analysis is proposed. This algorithm compensates for the lack of actual features of the complex network theory.

The rest of this paper is structured as follows: Section 2 describes a multi-layer multi-granularity network model and details the rule of fusion. Section 3 explains the integrated importance ranking algorithm of the proposed network model. A case study is used to verify the effectiveness of the network model and importance ranking algorithm in Section 4. Finally, conclusions are drawn in Section 5.

2. Methodology

2.1 The network model

Based on the definition of dependency relationship between elements in train system in Wang et al. (2017), we define the connection relationship between the components in the established network as mechanical connection, electrical connection and information connection. Therefore, the conception of the mechanical layer, electrical layer and information layer is proposed. The multi-layer multi-granularity network S is built as follows:

(1) {S={S1,S2,,Si,}Si={Gi,α,Gi,β,Gi,y}Gi,α={Vi,Ei,α}Gi,β={Vi,Ei,β}Gi,γ={Vi,Ei,γ}
where Si is subsystem i of the train system, Gi,α, Gi,β and Gi,γ are the mechanical layer, electrical layer and information layer of subsystem i, Vi is the set of nodes of subsystem i, Ei,α, Ei,β and Ei,γ are the set of links of three layers of subsystem i.
(2) {Vi={vivir,Vireal}Vireal={vi,1real,vi,2real,,vi,sreal,}
where vivir is the virtual node of subsystem i, Vireal is the set of real nodes of subsystem i, vi,sreal is the real node s of subsystem i. Note that, nodes in different layers of the same subsystem are identical:
(3) {Ei,u={Ei,uaffi,Ei,uact}Ei,uaffi={evivir,vi,1real,,evivir,vi,sreal,},u{α,β,γ}Ei,uact={evi,1real,vi,2realu,evi,sreal,vi,trealu,}
where Ei,uaffi is the set of links representing affiliation relationships of subsystem i, Ei,uact is the set of links representing action relationships of subsystem i, evivir,vi,sreal is the link between vivir and vi,sreal, evi,sreal,vi,trealu is the link between vi,sreal and vi,treal at layer u.

The structure diagram of the network is shown in Figure 2. In the equipment system, each subsystem Si has a virtual node vivir and several real nodes, and two real nodes may have different relationships at the mechanical, electrical and information layers.

2.2 Fusion rules of links of different layers

For the constructed multi-layer complex network, fusion rules of edges of the different layer are given (Zhang et al., 2020). With the help of a common vertex, the connections of different layers can be merged. For example, through node 5, evi,5real,vi,3realα and evi,5real,vi,4realβ can be merged (Figure 3). If two nodes have connections at different layers, the connections are merged into one. For example, for nodes 3 and 5, evi,5real,vi,3realα and evi,5real,vi,3realγ are merged into one.

3. An integrated importance ranking algorithm

An importance ranking algorithm considering the actual function and risk characteristics of the complex network based on the topology structure is proposed.

3.1 Selection and calculation of indices

3.1.1 Indices of topology characteristics.

The topology indicator Kstopo  of component s consists of four indices. Topology degree Idegtopo(s) is the simplest centrality measure of a node in a complex network, and the more links a given node is connected the more important it will be. Topology closeness centrality Iclose topo (s) represents the “closeness” of a node to the others and the larger the value, the more important the node is. Topology betweenness Ibetw topo (s) refers to the number of shortest paths through a given node in the complex network, and the larger the value, the more important the component. Topology efficiency Inetopo(s) measures the network efficiency on the condition that the component s is in failure, and the smaller the value is, the more important it is, which is contrary to the judgment standard of the other three indices:

(4) Kstopo=F(Idegtopo(s),Iclosetopo(s),Inetopo(s),Ibetwtopo(s)){Idegtopo(s)=t=1mastIclosetopo(s)=(m1)/t=1mdstInetopo(s)=1/m(m1)st1/dstIbetwtopo(s)=asbSσab(s)/σab
where ast is the value of the sth row and the jth column of the adjacency matrix, m is the total number of nodes in complex network S; dst is the shortest path between node s and t, which is the number of links between two nodes; both values σab(s) and σab are related to the number of shortest paths between nodes a and b, but the difference is that the former only calculates the shortest paths through node s. The indicator Kstopo mainly presents the topology characteristic of the complex network. The bigger the value Kstopo is, the more important the component corresponding to the node is in the topology structure.

3.1.2 Indices of function characteristics.

On the basis of the Kstopo, the function importance indicator Ksfunc  is defined according to the importance of the components to the train operation.

(5) Ksfinc=F(Idegfunc(s),Idosefunc(s),Inefunc(s),Ibetwfunc(s)){Idegfunc(s)=ωsIdegtopo (s)Iclose func (s)=ωsIclose topo (s)Ine func (s)=ωsIne topo (s)Ibetw func (s)=ωsIbetw topo (s)
where ωs is the coefficient representing the function importance of node s, and the value can be given through the method of scoring by expert’s experience (Table 1).

On the basis of rich practical experience, experts rank the importance of each node, with scores ranging from 0 to 1. If the value of Ksfunc  is large, the corresponding component plays an important role in ensuring the normal operation of the train.

3.1.3 Indices of risk characteristics.

Considering the possibility and impact of the failure, the risk indicator Ksrisk is defined:

(6) Ksrisk=F(Idegrisk(s),Icloseisk(s),Inerisk(s),Ibetw risk(s)){Idegrisk(s)=pslst=1mastIcloserisk(s)=(m1)/t=1mdstInerisk(s)=1/m(m1)st1/dstIbetw risk(s)=asbVσab(s)/σab
where ps is the coefficient of occurrence frequency of node s counted from fault data (Table 2); qsa is the impact on node a after the failure of node s; dst is the risk shortest path from nodes s to t; ls is the severity of the impact on train operation when node s fails obtained from the historical text data. Note that, the impact on train operation we mentioned here means that the train has to be stopped temporarily and ls is the value of the current state that the node has degraded from the optimal state, where ls ranges from 0 to 100. A larger Ksrisk means that when the corresponding component fails, the greater the impact on train operation.

3.2 Integrated importance measure

An importance ranking algorithm combining the entropy weight method and grey relational analysis is introduced here to measure the integrated importance.

3.2.1 Index preprocessing.

Because the goals and directions of these indices are different, processing all performance values for every component into a comparability sequence is necessary. If there are m components and n index, the sth component can be expressed as Is = (Is1,Is2,⋯,Isx,⋯,Isn), where Isx is the performance value of index x of component s. The term Is can be translated into Ds by use of one of the equations (7)(8):

(7) dsx=Isxmin{Isx,s=1,2,,m}max{Isx,s=1,2,,m}min{Isx,s=1,2,,m} for s=1,2,,mx=1,2,,n
(8) dsx=max{Isx,s=1,2,,m}Isxmax{Isx,s=1,2,,m}min{Isx,s=1,2,,m} for s=1,2,,mx=1,2,,n

Equation (7) is used for the-larger-the-better index and equation (8) is used for the-smaller-the-better index.

3.2.2 Entropy weight calculation.

The concept of entropy is well suited to measuring the utility value of indices to represent the average intrinsic information transmitted for decision-making. In general, the smaller the entropy Ei of a certain index is, the greater the variation degree of the index value is and the more information can be provided, the greater the weight of the index value is. On the contrary, the greater the entropy, the smaller the weight.

(9) D=(dsx)m×n={d11d12d1nd21d22d2ndm1dm2dmn}m×n for s=1,2,,mx=1,2,,n
(10) fsx=dsxs=1mdsx,s=1,2,,m,x=1,2,,n
(11) ex=1lnns=1mfsxlnfsx
(12) wx=(1ex)/(nx=1nex)
where m is the number of actual data for evaluation objects, n is the number of indices selected, fsx is the proportion of the sth component to the xth index, ex is the entropy value of the xth index, wx is the weight of the xth index.

3.2.3 Grey relational analysis.

The state of the components in the high-speed train system is regarded as a grey system, and the critical elements are identified based on the value of correlation degree. The reference sequence fsx is defined as d0x = (dsx,s = 1,2,⋯,m):

(13) Δsx=|d0xdsx|
(14) γ(I0x,Isx)=min{Δsx}+ρmax{Δsx}Δsx+ρmax{Δsx} for s=1,2,,mx=1,2,,n
(15) Γs=1nx=1nγ(I0x,Isx) for s=1,2,,m
where γ(I0x,Isx) is the grey relational coefficient between I0x and Isx; ρ is the distinguishing coefficient, ρ ∈ [0,1]; Γs is the weighted grey relational grade.

4. Numerical example

A typical CRH2 train system is taken as an example to illustrate the feasibility of the model and algorithm proposed in this study. The code is implemented in Ri386 3.4.3, uses Gephi to draw graphics and runs on a 64-bit Windows operating system.

4.1 Data and parameters

The components composing the rail train are more than 40,000 (Kou et al., 2018). To facilitate the analysis, we select some representative elements for study and finally form a multi-layer multi-granularity network composed of 5 virtual nodes and 125 actual nodes (Table 3).

Note that, virtual and actual nodes are encoded together in the network construction. For example, the virtual node “PANTOGRAPH” corresponds to the unshown node whose label should be “2” in Table 3.

4.2 Results

4.2.1 Fusion rules of links of different layers.

Taking the bogie subsystem as an example to illustrate the fusion rules. CRH2 train adopts the 4M4T marshaling mode, its motor car uses the SKMB-200 power bogie and the trailer uses the SKTB-200 trailer bogie. According to the structure and fault data of CRH2 bogie and the extraction rules of components, a total of 31 components are extracted as nodes in each layer of the multi-layer network model of the bogie subsystem (Table 4).

Node Bogie is a virtual node that connecting with all the other nodes belonging to the bogie subsystem, presenting the affiliation relationships between the subsystem and components. In Figure 4, the affiliation connections are blue and the actual connections are in different shades of pink, which is proportional to the degree of each node. In Figure 4(c), the nodes labeled “50” and “57” are motor and main windpipe, which are hidden in the fused bogie network because they are divided into other subsystems. Figure 4(d) is the result of fusing the mechanical layer, electrical layer and information layer, which contains all the connection relationships of the bogie subsystem. The combined network comprehensively considers all connection relationships and greatly reduces the complexity of multi-layer network computing. Next, fusion rules are applied to the complex network of the high-speed train system and critical elements will be identified.

4.2.2 Indices calculation.

After adopting the fusion rules, the complex network of the high-speed train system has 130 nodes and 370 edges. In Figure 5, the node is colored according to its outdegree value, which reflects the activity of the node in the network (Snijders, 2003). The outdegree value of each virtual node is relatively large because it has affiliation relationships with all actual nodes in its subsystem.

4.2.2.1 Indices in topology characteristics.

Idegtopo,Iclosetopo,Inetopo and Ibetwtopo are calculated as shown in Figure 6. The ranking results of importance will be quite different if it is performed according to each index separately, and therefore the topology index Ktopo is of great significance to present the integrated topology importance (Figure 7). The weights of each indicator are: Wtopo = {0.280, 0.281, 0.165, 0.274}. Rank nodes by the value of Ktopo and the top 30 are shown in Table 5.

The K70topo  value of the bogie frame is the largest (0.788), that is, this component is the most important one from the perspective of the topology structure. This is followed by car body, motor bearing, axle box, etc., and the topology critical components are formed. Overall, the difference of the Ktopo value is obvious in the whole system, the scores of the bogie subsystem and the air-brake subsystem are relatively higher than the other parts. Next, Kfunc and Krisk are calculated separately based on the result of Ktopo.

4.2.2.2 Indices in function characteristics.

Based on the topology indices and function score, Kfunc is obtained (Figure 8). The weights of each indicator are: Wfunc = {0.272, 0.235, 0.165, 0.328}. Rank nodes by the value of Kfunc and the top 30 are shown in Table 6.

Motor bearing is the most important component on the point of function importance that with the largest value of K50func  (0.613), followed by bogie frame, axle box, brake cylinder, wheel, etc. The difference in the Ktopo of the components is significant. In contrast, most components in the network have a high Kfunc with an average of 0.35. That is to say, the components selected in this paper are very important in the process of train operation.

4.2.2.3 Indices in risk characteristics.

Similarly, Krisk is obtained as shown in Figure 9 and the top 30 are shown in Table 7. The weights of each indicator are: Wrisk={0.286,0.266,0.161,0.287}.

In terms of the probability of risk and the severity of the consequences, the bogie frame is the most important component, with a K70risk  value of 0.584, followed by IGBT, gearbox, motor bearing, axle box, etc. The probability of nodes with high Ktopo and Kfunc degenerating to failure is supposed to be small, but once the components fail, the consequences are very serious, so the value of Krisk may be very large such as the bogie frame.

4.2.2.4 The important elements.

The maximum values of the topology index Ktopo, the function index Kfunc and the risk index Krisk are used as the grey-reference. Based on the grey relational analysis, the integrated importance indicator K is obtained and the critical components are obtained (Table 8).

Compare the four tables from Tables 5 to 8, we can get the following conclusions.

  • Generally, based on a comprehensive analysis of the three indicators of topology, function and risk, the most important element of the CRH2 train system is the bogie frame. The bogie frame is the basic stress point of the bogie and the installation foundation of various components. It has a connection relationship with almost all components of the bogie subsystem, so the topology index value is very high and the integrated importance based on the topological structure is also relatively high, which means that it is a component that requires the focus of the relevant railway department.

  • Carbody, motor bearing, axle box, gearbox and brake cylinder are ranked in the top 10 in all tables, which means that they are very important and require more attention to keep train operation safely. Here, the car body is defined as a combination of electromechanical components, that is, the train system except for the other five subsystems clearly given in the text.

  • Most of the key elements of the CRH2 train system identified by complex network theory belong to the bogie subsystem, so this subsystem needs special attention.

5. Conclusions

This study aims to introduce a method for identifying critical elements of the CRH2 train system based on complex network theory. A multi-layer multi-granularity network model suitable for the CRH2 train system is presented, including virtual nodes and actual nodes. Based on the network characteristic index, entropy weight and grayscale theory, the integrated importance ranking algorithm considering the three dimensions of topology, function and risk is proposed. Finally, a CRH2 train system is provided. Compared with the identification results by topology, function and risk indicator separately, the critical elements identified by the integrated importance ranking algorithm is more reasonable because it comprehensively takes into consideration the characteristics of the complex network in three dimensions. The most important element of the identified key elements is the bogie frame and most of the components belong to the bogie subsystem of the train, which also means that this subsystem is the one that needs the most attention of relevant staff.

In summary, the critical elements identification method based on complex network theory proposed in this paper enables decision-makers to not only improve train reliability in the design phase but also allocate maintenance resources more reasonably during the operation phase. At the same time, this method has universality and can be applied to the identification of critical elements of any other type of train on the basis of corresponding data.

Figures

Composition diagram of the high-speed train system

Figure 1.

Composition diagram of the high-speed train system

Structure diagram of the network

Figure 2.

Structure diagram of the network

Fusion rules of links

Figure 3.

Fusion rules of links

Fusion rules applied in bogie subsystem

Figure 4.

Fusion rules applied in bogie subsystem

Fusion rules applied in the high-speed train network

Figure 5.

Fusion rules applied in the high-speed train network

Value of 

Idegtopo,Iclosetopo,Inetopo and Ibetwtopo

Figure 6.

Value of Idegtopo,Iclosetopo,Inetopo and Ibetwtopo

Topology importance ranking results

Figure 7.

Topology importance ranking results

Function importance ranking results

Figure 8.

Function importance ranking results

Risk importance ranking results

Figure 9.

Risk importance ranking results

Grading standard for evaluating the function importance in the high-speed train system

Score [0, 0.3] [0.4, 0.7] [0.8, 1]
Standard Less important Important Very important

The grading standard for failure frequency

Score 1 2 3
Failure frequency High Medium Low

The virtual and actual nodes of the whole network (only partial actual nodes are listed)

Node type Node’s label Component name Node’s label Component name
Virtual nodes PANTOGRAPH Pantograph subsystem BOGIE Bogie subsystem
TRACTION Traction subsystem SIGNAL Signal subsystem
AIRBRAKE Air and brake subsystem
Actual node 1 Carbody 7 Dropper
3 Pillar … … … …
4 Insulator … … … …
5 Location device … … … …
6 Catenary 130 Close-fitting checker

The virtual and actual nodes in the bogie subsystem

Label Name
BOGIE Bogie
70 Bogie frame
71 Wheel
72 Axle box bearing
73 Axle box
74 Axle
75 Primary vertical vibration absorber
76 Axle spring
77 Secondary vertical vibration absorber
78 Secondary lateral vibration absorber
79 Anti-yaw vibration absorber
80 High-speed adjusting valve
81 Certain pin
82 Anti-rolling torsion bar
83 Air spring
84 Traction rod
85 Lateral stop
86 Coupling
87 Gearbox
88 Grounding device
89 Lubrication device
90 Sand device
91 Troubleshoot device
92 Junction box
93 Speed sensor1
94 Speed sensor2
95 Speed sensor3
96 Speed sensor4
97 Speed sensor5
98 Accelerate sensor
99 Gearbox bearing temperature sensor
100 Axis temperature sensor

Nodes in the top 30 of topology importance

Order Name Ktopo
1 Bogie frame 0.788
2 Carbody 0.584
3 Motor bearing 0.401
4 Axle box 0.383
5 Junction box 0.310
6 Gearbox 0.309
7 Brake clamp 0.303
8 Brake cylinder 0.302
9 Axle spring 0.266
10 Axle 0.255
11 Wheel 0.251
12 Pressure cylinder 0.248
13 High-speed adjusting valve 0.237
14 Certain pin 0.237
15 Traction rod 0.237
16 Gearbox bearing temperature sensor 0.227
17 Primary vertical vibration absorber 0.225
18 Coupling 0.223
19 Grounding device 0.223
20 Brake disc 0.219
21 Air spring 0.217
22 Lateral stop 0.217
23 IGBT 0.215
24 Axle box bearing 0.214
25 Accelerate sensor 0.208
26 Main windpipe 0.202
27 Secondary vertical vibration absorber 0.197
28 Secondary lateral vibration absorber 0.197
29 Anti-yaw vibration absorber 0.197
30 Anti-rolling torsion bar 0.197

Nodes in the top 30 of function importance

Order Name Kfunc
1 Motor bearing 0.613
2 Bogie frame 0.603
3 Axle box 0.551
4 Brake cylinder 0.502
5 Wheel 0.494
6 Gearbox 0.460
7 IGBT 0.458
8 Carbody 0.438
9 Main windpipe 0.401
10 Contract line 0.394
11 Bow suspension 0.392
12 Brake clamp 0.384
13 Junction box 0.383
14 Axle spring 0.377
15 Pressure cylinder 0.376
16 Axle 0.369
17 Lower rod 0.364
18 Pillar 0.364
19 Underframe 0.364
20 Carbon slide 0.363
21 Brake disc 0.363
22 Catenary 0.361
23 Support capacitor 0.358
24 Upper rod 0.357
25 Gearbox bearing temperature sensor 0.357
26 Wind cylinder 0.356
27 Dropper 0.355
28 Axle box bearing 0.354
29 Transmission control unit 0.354
30 Main air cylinder 0.353

Nodes in the top 30 of risk importance

Order Name Krisk
1 Bogie frame 0.584
2 IGBT 0.561
3 Gearbox 0.538
4 Motor bearing 0.525
5 Axle box 0.518
6 Brake cylinder 0.459
7 Wheel 0.401
8 Brake clamp 0.389
9 Carbody 0.366
10 Pressure cylinder 0.341
11 Axle box bearing 0.337
12 Certain pin 0.303
13 Axle 0.301
14 Axle spring 0.299
15 Brake disc 0.296
16 Primary vertical vibration absorber 0.291
17 Traction rod 0.285
18 lateral stop 0.276
19 Air spring 0.276
20 High-speed adjusting valve 0.276
21 Anti-yaw vibration absorber 0.262
22 Secondary vertical vibration absorber 0.262
23 Secondary lateral vibration absorber 0.262
24 Coupling 0.254
25 Accelerate sensor 0.248
26 Anti-rolling torsion bar 0.246
27 Gearbox bearing temperature sensor 0.241
28 Transmission control unit 0.225
29 Speed sensor4 0.223
30 Speed sensor5 0.223

Nodes in the top 20 of integrated importance

Order Name Ktopo Kfunc Krisk K
1 Bogie frame 0.788 0.603 0.584 0.991
2 Motor bearing 0.401 0.613 0.525 0.789
3 Axle box 0.383 0.551 0.518 0.734
4 IGBT 0.215 0.458 0.561 0.687
5 Gearbox 0.309 0.460 0.538 0.685
6 Carbody 0.584 0.438 0.366 0.660
7 Brake cylinder 0.302 0.502 0.459 0.658
8 Wheel 0.251 0.494 0.401 0.620
9 Brake clamp 0.303 0.384 0.389 0.578
10 Pressure cylinder 0.248 0.376 0.341 0.550
11 Axle spring 0.266 0.377 0.299 0.540
12 Axle box bearing 0.214 0.354 0.337 0.536
13 Axle 0.255 0.369 0.301 0.536
14 Certain pin 0.237 0.352 0.303 0.529
15 Brake disc 0.219 0.363 0.296 0.527
16 Traction rod 0.237 0.352 0.285 0.524
17 High speed adjusting valve 0.237 0.352 0.276 0.521
18 Primary vertical vibration absorber 0.225 0.340 0.291 0.520
19 Main wind pipe 0.202 0.401 0.215 0.517
20 lateral stop 0.217 0.345 0.276 0.516

References

Barabási, A.L. and Albert, R. (1999), “Emergence of scaling in random networks”, Science (Science), Vol. 286 No. 5439, pp. 509-512, available at: https://doi.org/10.1126/science.286.5439.509

Bisanovic, S., Samardzic, M. and Aganovic, D. (2016), “Application of component criticality importance measures in design scheme of power plants”, International Journal of Electrical and Computer Engineering (Ijece)), Vol. 6 No. 1, pp. 63-70, available at: https://doi.org/10.11591/ijece.v6i1.9061

Bompard, E., Napoli, R. and Xue, F. (2009), “Analysis of structural vulnerabilities in power transmission grids”, International Journal of Critical Infrastructure Protection, Vol. 2 No. 1-2, pp. 5-12, available at: https://doi.org/10.1016/j.ijcip.2009.02.002

Bonacich, P. (2007), “Some unique properties of eigenvector centrality”, Social Networks, Vol. 29 No. 4, pp. 555-564, available at: https://doi.org/10.1016/j.socnet.2007.04.002

Brandes, U., Borgatti, S.P. and Freeman, L.C. (2016), “Maintaining the duality of closeness and betweenness centrality”, Social Networks, Vol. 44, pp. 153-159, available at: https://doi.org/10.1016/j.socnet.2015.08.003

Chen, D., , L., Shang, M.S., Zhang, Y.C. and Zhou, T. (2012), “Identifying influential nodes in complex networks”, Physica A: Statistical Mechanics and Its Applications, Vol. 391 No. 4, pp. 1777-1787, available at: https://doi.org/10.1016/j.physa.2011.09.017

Dobson, I., Carreras, B.A., Lynch, V.E. and Newman, D.E. (2007), “Complex systems analysis of series of blackouts: cascading failure, critical points, and self-organization”, Chaos: An Interdisciplinary Journal of Nonlinear Science, Vol. 17 No. 2, available at: https://doi.org/10.1063/1.2737822

Du, Y., Gao, C., Chen, X., Hu, Y., Sadiq, R. and Deng, Y. (2015), “A new closeness centrality measure via effective distance in complex networks”, Chaos: An Interdisciplinary Journal of Nonlinear Science, Vol. 25 No. 3, available at: https://doi.org/10.1063/1.4916215

Espiritu, J.F., Coit, D.W. and Prakash, U. (2007), “Component criticality importance measures for the power industry”, Electric Power Systems Research, Vol. 77 No. 5-6, pp. 407-420, available at: https://doi.org/10.1016/j.epsr.2006.04.003

He, H. (2007a), “The innovative chinese high-speed railway technology(1)”, Eng. Sci, Vol. 9, pp. 4-18, available at: https://doi.org/10.1063/1.1713045

He, H. (2007b), “The innovative chinese high-speed railway technology(2)”, Eng. Sci, Vol. 9, pp. 4-18.

Hines, P. and Blumsack, S. (2008), “A centrality measure for electrical networks”, Proc. Annu. HI Int. Conf. Syst. Sci., available at: https://doi.org/10.1109/HICSS.2008.5

Hu, R.J., Li, Q., Zhang, G.Y. and Ma, W.C. (2015), “Centrality measures in directed fuzzy social networks”, Fuzzy Information and Engineering, Vol. 7 No. 1, pp. 115-128, available at: https://doi.org/10.1016/j.fiae.2015.03.008

Kou, L., Qin, Y., Jia, L. and Fu, Y. (2018), “Multistate reliability evaluation of bogie on high speed railway vehicle based on the network flow theory”, International Journal of Software Engineering and Knowledge Engineering, Vol. 28 No. 04, pp. 431-451, available at: https://doi.org/10.1142/S0218194018400053

Lambert, H.E. (1975), Fault Trees for Decision Making in Systems Analysis. PhD Thesis 1, available at: https://doi.org/10.1017/CBO9781107415324.004

Lin, S., Wang, Y., Jia, L., Zhang, H. and Li, Y. (2018), “Intuitionistic mechanism for weak components identification method of complex electromechanical system”, Journal of Intelligent and Fuzzy Systems, Vol. 34 No. 1, pp. 583-598, available at: https://doi.org/10.3233/JIFS-17807

National Railway Administration (2016), “The medium and long term railway network planning”, available at: www.nra.gov.cn/jgzf/flfg/gfxwj/zt/other/201607/t20160721_26055.shtml

People’s Transportation Network (2019), “China’s high-speed railway mileage reached 29 000 kilometers, more than two-thirds of the world’s total”, available at: http://news.sina.com.cn/c/2019-01-09/doc-ihqfskcn5554631.shtml

Saraswat, S. and Yadava, G.S. (2008), “An overview on reliability, availability, maintainability and supportability (RAMS) engineering”, International Journal of Quality and Reliability Management, Vol. 25 No. 3, pp. 330-344, available at: https://doi.org/10.1108/02656710810854313

Snijders, T. (2003), “Accounting for degree distributions in empirical analysis of network dynamics”, Dyn. Soc. Netw. Model. …, pp. 1-16.

Van Der Borst, M. and Schoonakker, H. (2001), “An overview of PSA importance measures”, Reliability Engineering and System Safety, Vol. 72 No. 3, pp. 241-245, available at: https://doi.org/10.1016/S0951-8320(01)00007-2

Wang, W.W.W., Loman, J. and Vassiliou, P. (2004), “Reliability importance of components in a complex system”, Annual Reliability and Maintainability Symposium. pp. 6-11, available at: https://doi.org/10.1109/RAMS.2004.1285415

Wang, Y., Bi, L., Lin, S., Li, M. and Shi, H. (2017), “A complex network-based importance measure for mechatronics systems”, Physica A: Statistical Mechanics and Its Applications, Vol. 466, pp. 180-198, available at: https://doi.org/10.1016/j.physa.2016.09.006

Wang, R.X., Gao, J.M., Gao, Z.Y., Gao, X. and Jiang, H.Q. (2016), “Complex network theory-based condition recognition of electromechanical system in process industry”, Science China Technological Sciences, Vol. 59 No. 4, pp. 604-617, available at: https://doi.org/10.1007/s11431-016-6025-2

Watts, D.J. and Strogatz, S.H. (1998), “Collective dynamics of ‘small-world’ networks”, Nature, Vol. 393 No. 6684, p. 440.

Zhang, H., Jia, L., Wang, L. and Wang, M. (2020), “Identifying critical component set of high-speed train system based on topological integrated importance analysis”, Lecture Notes in Electrical Engineering, Springer, pp. 109-118, available at: https://doi.org/10.1007/978-981-15-2866-8_11

Zhu, X. and Kuo, W. (2014), “Importance measures in reliability and mathematical programming”, Annals of Operations Research, Vol. 212 No. 1, pp. 241-267, available at: https://doi.org/10.1007/s10479-012-1127-0

Zio, E. and Golea, L.R. (2012), “Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements”, Reliability Engineering and System Safety, Vol. 101, pp. 67-74, available at: https://doi.org/10.1016/j.ress.2011.11.009

Acknowledgements

This study is funded by the National Key Research and Development Program of China (2016YFB1200401).

Corresponding author

Li Wang can be contacted at: wangli@bjtu.edu.cn

Related articles