Investigating the Drop-Out Rate from a BIM Course

Raido Puust (Department of Civil Engineering and Architecture, Tallinn University of Technology, Tallinn, Estonia)
Irene Lill (Department of Civil Engineering and Architecture, Tallinn University of Technology, Tallinn, Estonia)
Roode Liias (Department of Civil Engineering and Architecture, Tallinn University of Technology, Tallinn, Estonia)

10th Nordic Conference on Construction Economics and Organization

eISBN: 978-1-83867-051-1

ISSN: 2516-2853

Publication date: 1 May 2019

Abstract

Purpose

This study aims to initiate an investigation into the drop-out rate from building information modelling (BIM) courses.

Design/Methodology/Approach

During 2017-2018, BIM courses (16 weeks) have been developed as active learning modules. Peer instruction was used to engage students and improve the overall student’s performance. Students’ activity data were captured and analysed based on study groups and suggested study module completion dates.

Findings

By mapping students’ activity data against suggested completion date at various assessment milestones revealed a possible degradation of motivation throughout the course which, in turn, may have been a possible cause of drop-out.

Research Limitations/Implications

This paper presents ongoing research and a preliminary understanding about peer instruction effectiveness in BIM-related subjects as high intensity courses. It investigates whether a student’s active participation can improve their motivation to acquire a subject’s learning outcomes and reduce the drop-out.

Practical Implications

The peer instruction methodology that is used here is quite universal and can be successfully applied to various other subjects to increase the student’s involvement in the course.

Originality/Value

Results are drawn based on students’ involvement at the high intensity course and show the gradual increase of a learner’s motivation once they get continuous support from fellow learners and a teacher.

Keywords

Citation

Puust, R., Lill, I. and Liias, R. (2019), "Investigating the Drop-Out Rate from a BIM Course", Lill, I. and Witt, E. (Ed.) 10th Nordic Conference on Construction Economics and Organization (Emerald Reach Proceedings Series, Vol. 2), Emerald Publishing Limited, Leeds, pp. 325-333. https://doi.org/10.1108/S2516-285320190000002020

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Raido Puust, Irene Lill, Roode Liias.

License

Published in the Emerald Reach Proceedings Series. Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode


1. Introduction

Building information modelling (BIM), as a process, has been stated as one of the solutions to improve the construction industry’s poor productivity (McKinsey&Company, 2017) and enhance construction professionals’ career paths (Wu and Issa, 2013; Uddin and Khanzode, 2014). BIM implementation itself has been reported as primarily affected by “people issues” (Won et al., 2013) and therefore, one of the key focus areas to look at, is to analyse how BIM is taught (Sacks et al., 2018) to increase the knowledge of BIM.

Numerous research studies have investigated BIM education program development (Sacks and Pikas, 2013; Pikas et al., 2013; Succar and Sher, 2014), which has changed owing to industry needs in terms of BIM related topics, including new job roles (Abdirad and Dossick, 2016; Mayo et al., 2018; Succar et al., 2013; Uhm et al., 2017). BIM-related technology is tightly interconnected with the software and its availability for university course programs (Russell et al., 2014; Tuchkevich et al., 2015), which, in turn, define the topics to be learned. BIM subjects are often defined as courses that do not need any previous knowledge of computer aided design (CAD) (Sacks and Barak, 2010), and therefore, they can be incorporated into first- or second-year study programmes, and this has been tested by various universities (Vinšová et al., 2015). Developing courses that cover industry needs places considerable pressure onto current faculty members (Russell et al., 2014; Peterson et al., 2011; da Silva Vieira and Neto, 2016) and this could be the most significant barrier to integrating BIM into current university degree programs in some countries (Abbas et al., 2016).

To overcome these “people issues”, the learning process should develop various skills and be available for each student not only for those who are more active and respond to teachers’ questions in the classical learning environment. By using classical lecturing methods, it is difficult to simulate the so-called all-involved learning experience and active learning methods have offered a possible solution for that. Active learning embraces various teaching methodologies. For example, peer instruction (PI) as an active teaching method was popularised by Harvard Professor Eric Mazur in the early 1990s (Mazur, 1997). The main idea of peer instruction is to help students learn more from pre-class reading and to increase students’ engagement in discussion sessions (Crouch and Mazur, 2001; Alcalde and Nagel, 2018). Applying peer instruction may dramatically increase the teacher’s interventions (as more questions should be answered than usual) but the teacher availability and readiness to answer questions from the whole group is widely valued by students as it helps them to develop during the course and this reduces the failure rate (Zingaro and Porter, 2014). Peer instruction as a teaching method is very similar to other methods that share the same logic as flipped or inverted classroom (Bates and Galloway, 2012; Hsieh et al., 2015; Wang et al., 2018) or active learning (Lassen et al., 2018). Classical PI assumes that people in a PI session are equally involved (everybody is participating in discussions), but this is not always the case because it is not made compulsory. Therefore, special versions of PI have been developed in which each participant should ask a question before entering the discussion group as in the stepladder technique (Rogelberg et al., 1992; Michinov et al., 2015).

In this research, BIM course development over the period of 2017-2018 is described. The focus is to analyse the effect of course layout, which, from one side, aligns with industry needs but, from the other, may cause higher drop-out rates. The development of various skills usually means a higher rate of assessment types, which, in turn, may influence the motivation to finish the course. Peer instruction as a method has been chosen to give better support throughout the course and as a tool to get initial insights into the reasons for drop-outs.

2. Course design

The typical BIM course, if not based on one software package only, is usually a high educational density course, which means that it involves more than four different tools to be learned (Fonseca et al., 2017). Three separate BIM courses were developed during 2017-2018 in Tallinn University of Technology (TalTech). One with a focus on buildings, one for infrastructure and one for advanced BIM studies that combines both buildings and infrastructure topics. In this research, the analysis is carried out for the first of these, BIM for buildings, which was firstly designed for fourth year civil engineering students but later moved to the second year of studies. Table 1 shows how the “BIM for building” course evolved from an initial, lower density study program to a new, high educational density course.

Table 1

Educational density of the “BIM I” course in different study programmes

Course name Topics covered Software packages and/or services included
Building Information Modelling (BIM) I (4 ECTS credits, 2017) Introduction to BIM, BIM for preliminary design, BIM for architectural / structural detailed design, BIM for coordination Four major tools used (incl. Trimble SketchUp, Autodesk Revit, Tekla BIMsight, Autodesk Navisworks Manage)
Building information modelling basics (BIM I)* (6 ECTS credits, 2018) Introduction to BIM, BIM for preliminary design, BIM for architectural / structural and MEP detailed design, BIM for engineering (analysis), BIM for fabrication, BIM for coordination, BIM for construction management (VDC), BIM for visualization (including virtual reality) 10 major tools used (incl. Autodesk FormIt, Trimble SketchUp, Autodesk Revit, Autodesk Insight, Autodesk Green Building Studio, Autodesk Robot Structural Analysis Professional, Autodesk Advance Steel, Autodesk Navisworks Manage, Autodesk 3ds Max, Enscape)

*in bold are additions to the course for a new study program, MEP stands for mechanical–electrical–plumbing – common term for modelling of building systems.

The course has been designed as an active learning course in a university wide e-learning system called Moodle. It is divided into several modules (Table 2), each one of which has its own learning outcomes and assessments. The core idea of the course is to teach BIM process from the modelling perspective but include collaborative exercises.

Table 2

Course learning modules (LM), assessments (version 2018)

Course learning module Assessments
LM 0. Introduction
  • Self-introduction forum (not graded)

  • Sample quiz (not graded)

  • Theoretical quiz

  • Question/answer forum

LM 1. Preliminary design
  • Homework (preliminary design model, energy simulation)

  • Theoretical quiz

  • Question/answer forum

LM 2. Detailed design
  • Homework (architectural model)

  • Homework (structural model)

  • Homework (MEP model)

  • Theoretical quiz

  • Question/answer forum

LM 3. Model based construction drawings
  • Homework (basic structural analysis + sample construction drawings)

  • Theoretical quiz

  • Question/answer forum

LM 4. Virtual design and construction
  • Homework (4D simulation)

  • Theoretical quiz

  • Question/answer forum

LM 5. Visualization and virtual reality (VR)
  • Homework (visualization + VR preparation)

  • Theoretical quiz

  • Question/answer forum

LM 6. Project
  • Essay

  • Presentation of the project (based on previous modules)

The course begins with introductory lectures (usually during first 2 weeks, 3 × 45 min at one time). At the same time, the students start to carry out individual tasks and assessments (Table 2). Peer instruction is simulated in an e-learning environment, where each student must formulate at least one question at the end of the course module and answer or discuss another student’s questions. These questions and answers are assessed based on their constructiveness.

3. Methods

3.1. Data collection

The data used for analysis were obtained from two sources: (a) the university’s study information system (number of declarations and final grades) and (b) student’s individual activities with the completion date from an e-learning environment. In addition, a feedback system at the end of the course was in place and responses were gathered. However, these course feedback responses cannot be fully used in the current research as key information, for example, whether student respondents “passed” or “failed” cannot be distinguished and, with the high drop-out rate, this may introduce bias into the analysis.

3.2. Data measures

The course in both years was taken by different study groups. As such, the main interest was to understand if student performance depends on a study group itself. Division was made into two separate groups: (a) study program students and (b) open university students. Although there could be many other variables affecting the drop-out rate (for example, a previous background or knowledge) these are not taken account in this preliminary analysis. In fact, the course did not have any compulsory prerequisites. The course in both years has been an elective subject for all student groups.

3.3. Data analysis

The preliminary analysis was carried out at two different levels of detail. Firstly, the key performance indicators of student accomplishments were compared during the BIM course editions of 2017 and 2018. Secondly, as more data was gathered during 2018, it is analysed against learning outcomes where suggested learning module completion times should be followed but are not made compulsory except for the final deadline at the end of semester. These data give insights into students’ capability to manage their time.

4. Results

4.1. Core performance analysis (2017 vs 2018)

The BIM course layout has evolved in time (Table 1). Table 3 summarises the core statistics of the BIM courses that were delivered during 2017-2018. We can conclude from Table 3 that the number of various assessments can positively drive the student’s performance (final grade) as he/she is more engaged with the study content. The difference is small but visible. On the other hand, we see a moderate drop-out rate in terms of the course completion rate when compared with the previous year (2017). We explain this by the fact that the course needs more engagement and work during the semester and if students fail to do it on their own, their motivation reduces. The increased load of the course (see Table 1) is directly connected with the nature of the course (elective or compulsory course).

Table 3

A summary of student basic activity during the course

2017 2018
Study programme Open University Study programme Open University
Number of registrants (% from total) 43 (77%) 13 (23%) 27 (84%) 5 (16%)
First assessment (quiz) finished 40 9 24 2
First modelling task finished (preliminary design) 40 9 18 1
Course completed (% from study group total) 31 (72%) 6 (46%) 12 (44%) 1 (20%)
Average grade (max 5) 4.39 4.33 4.5 5
Number of various assessments 5 20

4.2. Motivation vs performance and time management (2018)

We take a closer look, how the motivation differs between those who finish the course and who don’t. Hereby, the motivation is defined through a student’hx2019;s continuous activity. The analyses are divided into two main groups. Starting with those who took the course through the full-time study program. Table 4 presents students' performance in terms of activity completion on-time. Positive numbers indicate the number of days ahead of time that an activity was finished and negative numbers refer to learning activities completed after the suggested completion times (in days). It should be noted that the course has only one deadline, at the end of semester. Therefore, each student was able to apply his own time management to finish the course on-time.

Table 4

Time management of a study group “study program”

Student ID Learning module
0.1 0.2 0.3 0.4 1.1 1.2 1.3 2.1 2.2 2.3 2.4 2.5 3.1 3.2 3.3 4.1 4.2 4.3 5.1 5.2 5.3 6.1 6.2
2 -8 -8 -1 -4 -48 -40 -40
3 -28 -35 -28 -40 -42 -45 -62 -51 -41 -37 -38 -41 -35 -37 -37 -32 -32 -33 -26 -26 -27 -20 -2
4 -17 -52 -45 -57 -64 -66 -66 -67 -55 -53 -53 -53 -49 -49 -49 -42 -43 -43 -36 -36 -36 -29 -8
5 -1 -8 -11 -10 -13 -22
6 3 -3 -2 5 0 -2 -2 -33 -42 -37 -38 -38 -35 -36 -36 -30 -30 -30 -24 -24 -28 -18 -2
7 0 0 5 -3 -4 -6 -63 -52 -42 -37 -38 -42 -35 -36 -37 -30 -31 -32 -25 -25 -27 -22 -8
8 -22 -22 -23 -16
10 4 -2 5
12 3 -9 -2 -17 -17 -31 -40
13 0 0 -6 -48
14 -3 -10 -3 -52 -46 -52 -73 -68 -54 -48 -50 -50 -43 -44 -44 -37 -37 -37 -30 -30 -30 -26 -8
15 4 4 0 -1 3 2 -55 -47 -37 -43 -44 -44 -37 -38 -38 -32 -32 -32 -25 -25 -26 -19 -2
16 -1 -2 5 7 1 -3 -3 -53 -42 -40 -41 -41 -36 -36 -36 -29 -30 -30 -23 -24 -24 -17 -2
17
18 -5 -7 -14
19 -2 -2 5 -73
20 -8 -14 -8
22 -2 -8 -3
23 -2 -5 0 2 3 3 -4 2 5 -5 -8 -8 -2 -3 -7 -2 -4 -8 -5 -8 -17 -10 -2
24 -3 -3 -3 -11 -36 -52 -52
25
27 3 -8 -1 3 -2 -64 -72 -68 -55 -51 -51 -52 -48 -48 -49 -42 -42 -42 -36 -36 -36 -29 -8
30 -1 -64
31 5 5 -1 6 7 2 -5 -49 -36 -31 -33 -33 -32 -33 -33 -28 -30 -30 -23 -24 -24 -17 -2
32 3 -73 -96 -89
33 3 3 0 3 3 2 -14 -16 -6 -26 -27 -30 -23 -23 -31 -25 -26 -30 -19 -20 -24 -19 -2
34 -8
35 -21 -66 -59 -76 -70 -72 -72 -59 -47 -43 -44 -44 -37 -37 -37 -30 -31 -31 -24 -25 -27 -24 -8

We can clearly see that some drop-outs are already visible before the first assessment is made (Student IDs 17 and 25). We could only explain these as attempts to see what the course is about and what the requirements are and, if those did not align with the students’ own expectations, they discontinued. We can clearly see that being behind the suggested completion date, doesn’t affect the possibility to finish on-time (for example, Student ID 35 began late and lagged the recommended schedule by 70+ days). The second study group, “open university”, is shown in Table 5.

Table 5

Time management of a study group “open university”

Student ID Learning module
0.1 0.2 0.3 0.4 1.1 1.2 1.3 2.1 2.2 2.3 2.4 2.5 3.1 3.2 3.3 4.1 4.2 4.3 5.1 5.2 5.3 6.1 6.2
1 4 3 0 7 1 -2 -4 -11 -4 -12 -15 -17 -26 -26 -26 -19 -22 -22 -16 -17 -17 -15 -2
9 -24 -24
21 -100
26 -4 -15 -8 -1
28

We see a similar pattern here. There is one who does not start the course and those who decide to give up. With “open university” students, we clearly connect this with their daily duties because these students are participating in the course while having a full-time job. When we compare “best-in-class” students in terms of their time management, both study groups are similar: 25 days behind the schedule is quite normal in the middle of the course.

5. Conclusions

During 2017-2018, new BIM courses were developed as active learning courses. To reflect the industry needs for students to develop various skills, the course was expanded in 2018 (in terms of the number of assessments and assessment types). This research was carried out to analyse the preliminary drawbacks if the increased course learning density in terms of the number and types of assessments affecting student performance and drop-out rates. Overall, we see an improvement in the performance of students who finish the course (higher grade).

We note the high drop-out rate and that we can’t fully explain its increase from 2017 to 2018 (as a percentage of those who started the course). This may be partly explained that in 2017 students were able to present the homework that aligned with the video learning content. In 2018 all videos were meant to be warm-up exercises and each student should present their original work that should not be based on previous works (they declare the chosen project beforehand which, in turn, should be unique).

Further research will investigate student motivation and the influence of active learning techniques on their performance more closely. Owing to the course electivity in the study program to date, the future analysis will also focus on how the subject becoming compulsory affects the drop-out rate.

References

Abbas, Din, and Farooqui, 2016Abbas, A., Din, Z. U. and Farooqui, R. (2016), “Integration of BIM in construction management education: an overview of Pakistani Engineering universities”, Procedia Engineering, 145, pp. 151157.

Abdirad, and Dossick, 2016Abdirad, H. and Dossick, C. S. (2016), “BIM curriculum design in architecture, engineering, and construction education: a systematic review”, Journal of Information Technology in Construction, 21, pp. 250271.

Alcalde, and Nagel, 2018Alcalde, P. and Nagel, J. (2018), “Why does peer instruction improve student satisfaction more than student performance? A randomized experiment”, International Review of Economics Education, In Press.

Bates, and Galloway, 2012Bates, S. and Galloway, R. (2012), “The inverted classroom in a large enrolment introductory physics course: a case study”, paper presented at HEA STEM Conference, London, United Kingdom.

Crouch, and Mazur, 2001Crouch, C. H. and Mazur, E. (2001), “Peer instruction: Ten years of experience and results”, American Journal of Physics, 69, pp. 970977.

da Silva Vieira, and Neto, 2016da Silva Vieira, M. M. and Neto, B. G. A. (2016), “Peer instruction: continuing teacher education in higher education”, Procedia – Social and Behavioral Sciences, 217, pp. 249256.

Fonseca, Redondo, Valls, and Villagrasa, 2017Fonseca, D., Redondo, E., Valls, F. and Villagrasa, S. (2017), “Technological adaptation of the student to the educational density of the course. A case study: 3D architectural visualization”, Computers in Human Behavior, 72, pp. 599611.

Hsieh, Amarnath, and Tsai, 2015Hsieh, S.-H., Amarnath, C. B. and Tsai, Y.-H. (2015), “On teaching BIM technology courses in civil engineering”, in International Conference on Innovative Production and Construction (IPC 2015), Perth, Western Australia, Australia, pp. 2730.

Lassen, Hjelseth, and Tollnes, 2018Lassen, A. K., Hjelseth, E. and Tollnes, T. (2018), “Enhancing learning outcomes by introducing BIM in civil engineering studies – experiences from a university college in Norway”, International Journal of Sustainable Development and Planning, 13(1), pp. 6272.

Mazur, 1997Mazur, E. (1997), “Peer instruction: Getting students to think in class”, AIP Conference Proceedings, 399, pp. 981988.

Mayo, Wu, McCuen, Issa, and Smith, 2018Mayo, G., Wu, W., McCuen, T., Issa, R. R. A. and Smith, D. (2018), “Implementation of the BIM body of knowledge (BOK) framework for program planning in academia”, in proceedings of the AiC Conference, Orlando, Florida, USA.

McKinsey&Company, 2017McKinsey&Company (2017), “Reinventing construction: a route to higher productivity”, available at: https://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/reinventing-construction-through-a-productivity-revolution (accessed 26 September 2018).

Michinov, Morice, and Ferrières, 2015Michinov, N., Morice, J. and Ferrières, V. (2015), “A step further in peer instruction: Using the stepladder technique to improve learning”, Computers & Education, 91, pp. 113.

Peterson, Hartmann, Fruchter, and Fischer, 2011Peterson, F., Hartmann, T., Fruchter, R. and Fischer, M. (2011), “Teaching construction project management with BIM support: Experience and lessons learned”, Automation in Construction, 20, pp. 115125.

Pikas, Sacks, and Hazzan, 2013Pikas, E., Sacks, R. and Hazzan, O. (2013), “Building information modeling education for construction engineering and management. II: Procedures and implementation case study”, Journal of Construction Engineering and Management, 139(11), pp. 05013002-12.

Rogelberg, Barnes-Farrell, and Lowe, 1992Rogelberg, S. G., Barnes-Farrell, J. L. and Lowe, C. A. (1992), “The stepladder technique: an alternative group structure facilitating effective group decision making”, Journal of Applied Psychology, 77, pp. 730737.

Russell, Cho, and Cylwik, 2014Russell, D., Cho, Y. K. and Cylwik, E. (2014), “Learning opportunities and career implications of experience with BIM/VDC”, Practice Periodical on Structural Design and Construction, 19(1), pp. 111121.

Sacks, and Barak, 2010Sacks, R. and Barak, R. (2010), “Teaching building information modeling as an integral part of freshman year civil engineering education”, Journal of Professional Issues in Engineering Education and Practice, 136(1), pp. 3038.

Sacks, and Pikas, 2013Sacks, R. and Pikas, E. (2013), “Building information modeling education for construction engineering and management. I: Industry requirements, state of the art, and gap analysis”, Journal of Construction Engineering and Management, 139(11), pp. 0401301612.

Sacks, Eastman, Lee, and Teicholz, 2018Sacks, R., Eastman, C., Lee, G. and Teicholz, P. (2018), BIM handbook: a guide to building information modeling for owners, designers, engineers, contractors, and facility managers, Wiley, Hoboken, New Jersey.

Won, Lee, Dossick, and Messner, 2013Won, J., Lee, G., Dossick, C. S. and Messner, J. (2013), “Where to focus for successful adoption of building information modeling within organization”, Journal of Construction Engineering and Management, 139(1).

Succar, Sher, and Williams, 2013Succar, B., Sher, W. and Williams, A. (2013), “An integrated approach to BIM competency assessment, acquisition and application”, Automation in Construction, 35, pp. 174189.

Succar, and Sher, 2014Succar, B. and Sher, W. (2014), “A competency knowledge-base for BIM learning”, Australasian Journal of Construction Economics and Building - Conference Series, 2(2).

Tuchkevich, Rechinsky, Vysotskiy, Zolotova, and Tuchkevich, 2015Tuchkevich, E., Rechinsky, A., Vysotskiy, A., Zolotova, J. and Tuchkevich, V. (2015), “ADN and AP programs for civil engineering students”, Procedia Engineering, 117, pp. 1,137-1,142.

Uddin, and Khanzode, 2014Uddin, M. M. and Khanzode, A. R. (2014), “Examples of how building information modeling can enhance career paths in construction”, Practice Periodical on Structural Design and Construction, 19(1), pp. 95102.

Uhm, Lee, and Jeon, 2017Uhm, M., Lee, G. and Jeon, B. (2017), “An analysis of BIM jobs and competencies based on the use of terms in the industry”, Automation in Construction, 81, pp. 6798.

Vinšová, Achten, and Matějovská, 2015Vinšová, I., Achten, H. and Matějovská, D. (2015), “Integrating BIM in education: lessons learned”, in proceedings of 33th annual conference of eCAADe, Vienna, Austria, pp. 127133.

Wang, Jou, Lv, and Huang, 2018Wang, J., Jou, M., Lv, Y. and Huang, C.-C. (2018), “An investigation on teaching performances of model-based flipping classroom for physics supported by modern teaching technologies”, Computers in Human Behavior, 84, pp. 3648.

Wu, and Issa, 2013Wu, W. and Issa, R. R. A. (2013), “BIM education and recruiting: Survey-based comparative analysis of issues, perceptions, and collaboration opportunities”, Journal of Professional Issues in Engineering Education & Practice, 140(2), pp. 04013014-9.

Zingaro, and Porter, 2014Zingaro, D. and Porter, L. (2014), “Peer instruction in computing: The value of instructor intervention”, Computers & Education, 71, pp. 8796.

This research was supported by the “Integrating Education with Consumer Behaviour Relevant to Energy efficiency and Climate Change at the Universities of Russia, Sri Lanka and Bangladesh (BECK) project co-funded by the Erasmus+ Programme of the European Union. The European Commission support for the production of this publication does not constitute an endorsement of the contents which reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Prelims
THE ECONOMICS AND BUSINESS OF CONSTRUCTION
Updating and Cleaning Out: The “Make or Buy” Decision in Construction Revisited
Bispevika Project: Research for Constructing a Collaborative Value Chain
Social Considerations in the Procurement of Road and Railroad Projects in Sweden
Standardization and Industrialized Construction of Special Purpose Building
Identifying Contradictions of Integrating Life-Cycle Costing in Design Practices
Advancing Networking-Based Business Management in Construction Markets
Contracts and Culture in a Partnering Project
Sub-Contractors’ Perception of Contracting: The Case of Crime
Project Managers: Gatekeepers or Inside Men?
The Hybridity of Strategic Partnerships and Construction Supply Chain Management
Dynamic Capabilities and Risk Management: Evaluating the CDRM Model for Clients
An Opposite Design-Build Procurement Method: Competing on Quality with a Fixed Price
CONSTRUCTION AND PROJECT MANAGEMENT
An Appraisal of Water Infrastructure Projects’ Financing Challenges in South Africa
The Soft Factors in Design Management: a Hidden Success Factor?
Room to Manoeuvre: Governing the Project Provisions
A Longitudinal View of Adopting Project Alliancing: Case Finland
A Simulation-Based Optimization for Contractors in Precast Concrete Projects
Governed by Municipal Land Allocations: Implications for Housing Developers
Situation Picture Through Construction Information Management
Who Benefit from Crime in Construction? A Structural Analysis
Quality Evaluation of Contractor’s Schedule in the Bidding Phase
Activity Cruciality as Measure of Network Schedule Structure Resilience
Construction Programmes and Programming: A Critical Review
Procurement Research: Current State and Future Challenges in the Nordic Countries
Exploitative Learning in Inter-Organizational Projects: Evidence from Dutch Infrastructure Practices
The Transition from Design-Bid-Build Contracts to Design-Build
Exploring the Dynamics of Supplier Innovation Diffusion
Understanding Collaborative Working in a Facilitated Interdisciplinary Environment
Ensuring Successful Knowledge Transfer in Building Renovation Projects
Public Private Collaboration in the Context of Zero Emission Neighbourhood
Strategizing and Project Management in Construction Projects: An Exploratory Literature Review
BUILDING INFORMATION, DATA AND DIGITALIZATION
BIM-Enabled Education: a Systematic Literature Review
A BIM-Enabled Learning Environment: a Conceptual Framework
“I Work All Day with Automation in Construction: I am a Sociomaterial-Designer”
Developing Smart Services to Smart Campus
An Overview of BIM Adoption in the Construction Industry: Benefits and Barriers
BIM for Construction Education: Initial Findings from a Literature Review
Model for Smart, Self-learning and Adaptive Resilience Building
Investigating the Drop-Out rate from a BIM Course
INNOVATIONS IN THE CONSTRUCTION PROCESS
Senior Residence Concepts in Norway: Challenges and Actions for a Sustainable Development
3D-Printing Technology in Construction: Results from a Survey
Product and Manufacturing Systems Alignment: a Case Study in the Timber House Building Industry
Opening the Black Box of Accessibility Regulation
Orchestrating Multi-Actor Collaborative Innovation Across Organizational Boundaries
SUSTAINABILITY AND RESOURCE EFFICIENCY
Social Sustainability in Modelling of Value Creation in Housing Refurbishment
Reviewing the Role of Sustainability Professionals in Construction
Exploring the Evolution and Impact of Building Environment Assessment Methods in Achieving Green Building
STAKEHOLDERS OF CONSTRUCTION AND REAL ESTATE
Challenging the Rhetoric of Construction Briefing: Insights from a Formula 1 Sports Venue
Underlying Causes for Risk Taking Behaviour Among Construction Workers
Towards Developing a Framework for User-Driven Innovation in Refurbishment
Reconstructing Knowledge Integration in the Norwegian AEC-Industry
Institutional Complexity for Chinese International Contractors
BUILT ENVIRONMENTS
BIM Related Innovation in Healthcare Precinct Design and Facilities Management
Location is Crucial in Retrofit: Strategy Selection in Different Regions
CONSTRUCTION EDUCATION AND RESEARCH
From Theoretical to Practical Competence on Health and Safety
A Test Platform of Viable Methods to Improve Production and Learning on Construction Sites