To read this content please select one of the options below:

Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects

Anthony Olukayode Yusuf (Department of Quantity Surveying, Faculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife, Nigeria)
Akintayo Opawole (Department of Quantity Surveying, Faculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife, Nigeria)
Nofiu Abiodun Musa (Department of Quantity Surveying, Faculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife, Nigeria)
Dele Samuel Kadiri (Department of Quantity Surveying, Faculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife, Nigeria)
Esther Ilori Ebunoluwa (Department of Quantity Surveying, Faculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife, Nigeria)

International Journal of Building Pathology and Adaptation

ISSN: 2398-4708

Article publication date: 11 October 2022

Issue publication date: 20 November 2024

247

Abstract

Purpose

This study examined factors influencing the organisational capabilities of the public sector for building information modelling (BIM) implementation in construction projects with a view to enhancing the performance of public sector projects.

Design/methodology/approach

The study adopted a quantitative descriptive analysis that was based on primary data. In total, 198 valid questionnaires obtained from construction professionals within the public sector provided primary quantitative data for the assessment. The respondents provided the responses on the factors which were identified through an in-depth synthesis of literature relating to organisational capabilities of the public sector. Data collected were analysed using descriptive and inferential statistics.

Findings

The findings established that the potential of the public sector to deploy BIM in construction projects is greatly influenced by varying degree of organisational capability attributes with bureaucratic culture (mean score, MS = 3.37), structural complexity (MS = 3.17), lack of skilled and trained staff (MS = 3.12), personnel stability (MS = 3.11), staff cooperation (MS = 3.09) and political constraint (MS = 3.07) ranked highest. Through factor analysis, these and other highly influential factors were grouped into eight components, namely management-related, policy-related, technical-related, attitude-related, work structure-related, work ethic-related, decision-related and feedback-related factors. This grouping reflects the various components of organisational capability attributes which the public sector needs to efficiently develop to benefit from project management paradigm introduced by BIM.

Practical implications

This study provided information for improving specific capability attributes with respect to human and technical resources as well as other soft infrastructure to support BIM implementation on building projects by the public sector client. The study also serves as a guide for understanding BIM implementation by the public sector in similar socio-political and economic contexts.

Originality/value

This assessment indicates various degrees by which the organisational attributes of public sector have influenced the attributes' capability to implement BIM on construction projects. Thus, findings provide information on areas of improvement for better implementation of BIM by the public sector in project delivery.

Keywords

Citation

Yusuf, A.O., Opawole, A., Musa, N.A., Kadiri, D.S. and Ebunoluwa, E.I. (2024), "Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects", International Journal of Building Pathology and Adaptation, Vol. 42 No. 5, pp. 1058-1083. https://doi.org/10.1108/IJBPA-01-2022-0020

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited

Related articles