Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm
Engineering, Construction and Architectural Management
ISSN: 0969-9988
Article publication date: 18 November 2022
Issue publication date: 1 March 2024
Abstract
Purpose
In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but receives limited attention. The current work presents an optimization model for scheduling multiple tower cranes' service with overlapping areas while achieving collision-free between cranes.
Design/methodology/approach
The cooperative coevolutionary genetic algorithm (CCGA) was proposed to solve this model. Considering the possible types of cross-tasks, through effectively allocating overlapping area tasks to each crane and then prioritizing the assigned tasks for each crane, the makespan of tower cranes was minimized and the crane collision avoidance was achieved by only allowing one crane entering the overlapping area at one time. A case study of the mega project Daxing International Airport has been investigated to evaluate the performance of the proposed algorithm.
Findings
The computational results showed that the CCGA algorithm outperforms two compared algorithms in terms of the optimal makespan and the CPU time. Also, the convergence of CCGA was discussed and compared, which was better than that of traditional genetic algorithm (TGA) for small-sized set (50 tasks) and was almost the same as TGA for large-sized sets.
Originality/value
This paper can provide new perspectives on multiple tower crane service sequencing problem. The proposed model and algorithm can be applied directly to enhance the operational efficiency of tower cranes on construction site.
Keywords
Acknowledgements
The first author is grateful for the financial support provided by Beijing Social Science Fund General Project (No. 19GLB011).
Data availability statement: All data, models and code supporting the findings of this study are available from the corresponding author upon reasonable request.
Citation
Yin, J., Li, J., Yang, A. and Cai, S. (2024), "Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm", Engineering, Construction and Architectural Management, Vol. 31 No. 3, pp. 1348-1369. https://doi.org/10.1108/ECAM-08-2022-0767
Publisher
:Emerald Publishing Limited
Copyright © 2022, Emerald Publishing Limited