To read this content please select one of the options below:

Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm

Jing Yin (Department of Industrial Engineering, Beijing University of Civil Engineering and Architecture, Beijing, China)
Jiahao Li (Department of Industrial Engineering, Beijing University of Civil Engineering and Architecture, Beijing, China)
Ahui Yang (Department of Management Science and Engineering, China University of Geosciences Beijing, Beijing, China)
Shunyao Cai (Department of Construction Management, Chongqing University, Chongqing, China)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 18 November 2022

Issue publication date: 1 March 2024

272

Abstract

Purpose

In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but receives limited attention. The current work presents an optimization model for scheduling multiple tower cranes' service with overlapping areas while achieving collision-free between cranes.

Design/methodology/approach

The cooperative coevolutionary genetic algorithm (CCGA) was proposed to solve this model. Considering the possible types of cross-tasks, through effectively allocating overlapping area tasks to each crane and then prioritizing the assigned tasks for each crane, the makespan of tower cranes was minimized and the crane collision avoidance was achieved by only allowing one crane entering the overlapping area at one time. A case study of the mega project Daxing International Airport has been investigated to evaluate the performance of the proposed algorithm.

Findings

The computational results showed that the CCGA algorithm outperforms two compared algorithms in terms of the optimal makespan and the CPU time. Also, the convergence of CCGA was discussed and compared, which was better than that of traditional genetic algorithm (TGA) for small-sized set (50 tasks) and was almost the same as TGA for large-sized sets.

Originality/value

This paper can provide new perspectives on multiple tower crane service sequencing problem. The proposed model and algorithm can be applied directly to enhance the operational efficiency of tower cranes on construction site.

Keywords

Acknowledgements

The first author is grateful for the financial support provided by Beijing Social Science Fund General Project (No. 19GLB011).

Data availability statement: All data, models and code supporting the findings of this study are available from the corresponding author upon reasonable request.

Citation

Yin, J., Li, J., Yang, A. and Cai, S. (2024), "Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm", Engineering, Construction and Architectural Management, Vol. 31 No. 3, pp. 1348-1369. https://doi.org/10.1108/ECAM-08-2022-0767

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited