To read this content please select one of the options below:

$44.00 (excl. tax) 30 days to view and download

Implementation of Material Requirements Planning: Safety Lead Times

Steven A. Melnyk, Chris J. Piper

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 February 1981

417

Abstract

This article presents the results of a simulation study of implementation practices for material requirements planning systems. In particular, the role of safety lead times in ensuring effective delivery performance is analysed and some general guidelines are suggested.

Citation

Melnyk, S.A. and Piper, C.J. (1981), "Implementation of Material Requirements Planning: Safety Lead Times", International Journal of Operations & Production Management, Vol. 2 No. 1, pp. 52-61. https://doi.org/10.1108/eb054675

Publisher

:

MCB UP Ltd

Copyright © 1981, MCB UP Limited

Related articles