Work Study Volume 23 Issue 1
Abstract
The Stevenage distribution centre of British Insulated Callender Cables found its internal telephone system not only slow and inconvenient in use but, worst of all, unreliable. In choosing a new communication system reliability was the important fact, for a large distribution centre can only run smoothly if there is efficient internal transfer of information.
Citation
(1974), "Work Study Volume 23 Issue 1", Work Study, Vol. 23 No. 1, pp. 3-36. https://doi.org/10.1108/eb048299
Publisher
:MCB UP Ltd
Copyright © 1974, MCB UP Limited