Aircraft Generators Produced Twice as Quickly: Stand No 5223
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 March 1990
Abstract
THE floor‐to‐floor time to manufacture component parts for an aircraft generator has been halved from one year to six months at the Power Systems Division of Lucas Aerospace, Hemel Hempstead, following reorganisation of its shop floor into production cells.
Citation
(1990), "Aircraft Generators Produced Twice as Quickly: Stand No 5223", Aircraft Engineering and Aerospace Technology, Vol. 62 No. 3, pp. 5-5. https://doi.org/10.1108/eb036907
Publisher
:MCB UP Ltd
Copyright © 1990, MCB UP Limited