Airport Installations
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 February 1972
Abstract
Two speedwalk systems, 285 and 210 ft long, are being installed at Toronto International airport. They will be separated midway through the tunnel by a short corridor which accommodates a fire door.
Citation
(1972), "Airport Installations", Aircraft Engineering and Aerospace Technology, Vol. 44 No. 2, pp. 21-21. https://doi.org/10.1108/eb034868
Publisher
:MCB UP Ltd
Copyright © 1972, MCB UP Limited