The Stratofreighter Air Duct and Anticing Systems: The Method of Manufacture and Installation of the Plastic Ducts Developed by the Boeing Aircraft Company
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 November 1948
Abstract
THE U.S. Air Force recently ordered twenty‐seven C‐97 Strato‐freighters in addition to the thirteen previously ordered, some of which have been delivered. These are the cargo version of the Boeing Aircraft Company's Stratocruiser.
Citation
Perry, H.W. (1948), "The Stratofreighter Air Duct and Anticing Systems: The Method of Manufacture and Installation of the Plastic Ducts Developed by the Boeing Aircraft Company", Aircraft Engineering and Aerospace Technology, Vol. 20 No. 11, pp. 335-336. https://doi.org/10.1108/eb031689
Publisher
:MCB UP Ltd
Copyright © 1948, MCB UP Limited