Neurofuzzy modelling of construction projects' duration II: application
Engineering, Construction and Architectural Management
ISSN: 0969-9988
Article publication date: 1 February 2001
Abstract
The first paper of this two‐paper series has developed an understanding of neurofuzzy concept modelling techniques. This second paper demonstrates the power and versatility of neurofuzzy methods when applied to the determination of construction project duration. The paper explains data selection and preprocessing, the modelling process and optimization of developed models. The paper also presents and discusses the results generated by the developed model.
Keywords
Citation
BOUSSABAINE, A.H. (2001), "Neurofuzzy modelling of construction projects' duration II: application", Engineering, Construction and Architectural Management, Vol. 8 No. 2, pp. 114-129. https://doi.org/10.1108/eb021175