To read this content please select one of the options below:

INDUSTRY

Anti-Corrosion Methods and Materials

ISSN: 0003-5599

Article publication date: 1 July 1988

14

Abstract

£5.3 Million finishing system for new car. A contract worth £5.3 million has been won by Durr Ltd, Warwick, to re‐equip part of the No 2 paint shop at Austin Rover Group's Longbridge plant, where the new R8 car will be finished.

Citation

(1988), "INDUSTRY", Anti-Corrosion Methods and Materials, Vol. 35 No. 7, pp. 22-23. https://doi.org/10.1108/eb020679

Publisher

:

MCB UP Ltd

Copyright © 1988, MCB UP Limited

Related articles