To read this content please select one of the options below:

CT COMMENTARY

Anti-Corrosion Methods and Materials

ISSN: 0003-5599

Article publication date: 1 March 1962

13

Abstract

On‐site Pipeline Production. WE can all easily conjure up a picture of pipe‐laying operations with mounds of earth from the trench, the trench‐digging plant and possibly pipewrapping equipment prominently arrayed. An essential part of the picture is, of course, the line of pipe sections on the surface awaiting installation. But are these great lengths of pipe really an essential part of the scene? Apparently not.

Citation

(1962), "CT COMMENTARY", Anti-Corrosion Methods and Materials, Vol. 9 No. 3, pp. 53-56. https://doi.org/10.1108/eb019936

Publisher

:

MCB UP Ltd

Copyright © 1962, MCB UP Limited

Related articles