To read this content please select one of the options below:

IMPROVING FLOW IN THE WORKSHOP

FRANCIS PEYRONNET (Bendix Electronics, France)

Logistics World

ISSN: 0953-2137

Article publication date: 1 March 1988

103

Abstract

Manufacturing companies are facing up to the challenge of reducing lead‐time and in‐process stocks, and increasing flexibility. Kanban methods are being seen as an essential tool in meeting the challenge. Francis Peyronnet, manager of Kanban and Production Control for Bendix Electronics, France, outlines the steps required for implementing Kanban links between several production workshops.

Citation

PEYRONNET, F. (1988), "IMPROVING FLOW IN THE WORKSHOP", Logistics World, Vol. 1 No. 3, pp. 135-139. https://doi.org/10.1108/eb007431

Publisher

:

MCB UP Ltd

Copyright © 1988, MCB UP Limited

Related articles