IMPROVING FLOW IN THE WORKSHOP
FRANCIS PEYRONNET
(Bendix Electronics, France)
103
Abstract
Manufacturing companies are facing up to the challenge of reducing lead‐time and in‐process stocks, and increasing flexibility. Kanban methods are being seen as an essential tool in meeting the challenge. Francis Peyronnet, manager of Kanban and Production Control for Bendix Electronics, France, outlines the steps required for implementing Kanban links between several production workshops.
Citation
PEYRONNET, F. (1988), "IMPROVING FLOW IN THE WORKSHOP", Logistics World, Vol. 1 No. 3, pp. 135-139. https://doi.org/10.1108/eb007431
Publisher
:MCB UP Ltd
Copyright © 1988, MCB UP Limited