Controlling the flow for flexiblity
40
Abstract
A move from build‐to‐order to off‐the‐shelf forced Unisys' Flemington plant to re‐think its manufacturing strategy. Integrating assembly with test and distribution through material and information flow proved to be the answer.
Citation
(1990), "Controlling the flow for flexiblity", Assembly Automation, Vol. 10 No. 3, pp. 125-128. https://doi.org/10.1108/eb004307
Publisher
:MCB UP Ltd
Copyright © 1990, MCB UP Limited