Planning flexible system structures
W. Eversheim
(RWTH Aachen, Germany)
P. Kettner
(RWTH Aachen, Germany)
K.P. Mertz
(RWTH Aachen, Germany)
61
Abstract
Construction of devices is not the most important element of flexible assembly systems; the true value lies in the realisation of systematic and need‐oriented planning.
Citation
Eversheim, W., Kettner, P. and Mertz, K.P. (1986), "Planning flexible system structures", Assembly Automation, Vol. 6 No. 3, pp. 141-144. https://doi.org/10.1108/eb004201
Publisher
:MCB UP Ltd
Copyright © 1986, MCB UP Limited