Project scheduling by incorporating potential quality loss cost in time-cost tradeoff problems: The revised KKH model

Amin Mahmoudi (Department of Construction and Real Estate, School of Civil Engineering, Southeast University, Nanjing, China)
Saad Ahmed Javed (School of Business, Nanjing University of Information Science and Technology, Nanjing, China and College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing, China)

Journal of Modelling in Management

ISSN: 1746-5664

Article publication date: 20 March 2020

Issue publication date: 4 August 2020

451

Abstract

Purpose

The study aims to introduce two new models of project scheduling by incorporating potential quality loss cost (PQLC) in time–cost tradeoff problems by overcoming the drawbacks of the existing Kim, Khang and Hwang (KKH) model. The proposed methods are named the Revised KKH-I (RKKH-I) and Revised KKH-II (RKKH-II) models for project scheduling.

Design/methodology/approach

The performance of the existing KKH model has been tested using a numerical example followed by the identification of the main shortcomings of the KKH method. Later, a concrete effort has been made to address its shortcomings while improving its performance significantly. The comparative analysis of the Revised KKH models with the original model has also been presented along with sensitivity analyses.

Findings

The study recognizes that the construct on which the original KKH method was built is important; however, certain drawbacks make it unable to consider PQLC in projects, thus making its practical use questionable. The comparative analysis of the proposed methodology with the original method demonstrated that the new models (RKHH-I and II) are more comprehensive and intelligent than the existing KKH model.

Originality/value

The comparative analysis of the original KKH model and its improved version reveals that the revised model is far more suitable for project scheduling. The study is important for project managers who recognize project scheduling being one of the key parameters associated with project management process, crucial to control every day during the management of projects.

Keywords

Acknowledgements

This study was supported by the National Natural Science Foundation of China (NSFC-71771052 and 71372199). The study includes the work, which corresponds to the doctoral dissertation of the first author at Southeast University. The authors would like to thank Dr Morteza Bagherpour for his comments on the first version of the current study.

Citation

Mahmoudi, A. and Javed, S.A. (2020), "Project scheduling by incorporating potential quality loss cost in time-cost tradeoff problems: The revised KKH model", Journal of Modelling in Management, Vol. 15 No. 3, pp. 1187-1204. https://doi.org/10.1108/JM2-12-2018-0208

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Emerald Publishing Limited

Related articles