To read this content please select one of the options below:

Post-COVID-19 strategic sourcing decisions for escorting stakeholders’ expectations and supplier performance in construction project works

Atul Kumar Sahu (Department of Industrial and Production Engineering, Guru Ghasidas Vishwavidyalaya, Bilaspur, India)
Prabhu M. (Department of Business Administration, College of Administration and Economics, Lebanese French University, Erbil, Iraq)
K.T. Vigneswara Rao (Faculty of Finance, NICMAR Business School, NICMAR University, Pune, India)

Journal of Global Operations and Strategic Sourcing

ISSN: 2398-5364

Article publication date: 24 June 2022

Issue publication date: 27 April 2023

583

Abstract

Purpose

The occurrence of COVID-19 has impacted the wide-reaching dimensions of manufacturing, materials, procurement, management, etc., and has loaded disruptions in the wide range of supply chain (SC) activities. The impact of COVID-19 has twisted supplier performance and influenced stakeholders’ thinking towards selecting supplier sources and making strategic sourcing decision for convinced arrangement of construction management (CM) resources. Nowadays, suppliers are intently evaluated by stakeholders in post-COVID-19 phase to induce agile availability of CM resources. Accordingly, this paper aims to demonstrate competent CM dimensions under post COVID-19 scenario for ease managing construction projects by the stakeholders.

Design/methodology/approach

The authors have implicated Grey Sets Theory along with decision-making trial and evaluation laboratory (DEMATEL) technique for understanding significant outcomes. Varieties of diverse decision aspects responsible for strategically influencing supplier sourcing decision is projected under post COVID-19 scenario for handling construction projects by the stakeholders.

Findings

This study investigated sustainable construction management dimensions (SCMD) at the stage of resource deliveries and client aspirations under post COVID-19 situation. The study demonstrated “Lead time” as the most crucial, “Product Range” as the second and “Customers dealings and relationship” as the third crucial aspect considering by the stakeholders for selecting supplier sources based on the attainment of performance score of 0.1338, 0.1273 and 0.1268, respectively. It is found that high lead time stimulates the stakeholders to divert their orders to other competent supplier sources holding a low degree of lead time as compared.

Research limitations/implications

The present study rollovers its existence by serving critical thinking, conceptual modelling, criteria identification and evaluation under CM domain for drafting effectual strategies by the suppliers. The study investigated the impact of COVID-19 on stakeholders’ decision-making and enlisted SCMD that strategically stimulated them in choosing supplier sourcing decision.

Originality/value

The present study realizes the insights of stakeholders in the post COVID-19 scenario related to the supplier sources based on performance score. The study quantified sustainable supplier attribute for construction work and practices. The study analysed the expectations of the stakeholders purchasing different varieties of construction materials from supplier sources for civil works in the post COVID-19 scenario.

Keywords

Citation

Sahu, A.K., M., P. and Rao, K.T.V. (2023), "Post-COVID-19 strategic sourcing decisions for escorting stakeholders’ expectations and supplier performance in construction project works", Journal of Global Operations and Strategic Sourcing, Vol. 16 No. 2, pp. 224-257. https://doi.org/10.1108/JGOSS-02-2022-0011

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited

Related articles