To read this content please select one of the options below:

A fuzzy integrated approach for project selection

Bersam Bolat (Management Engineering, Istanbul Technical University, Istanbul, Turkey)
Ferhan Çebi (Management Engineering, Istanbul Technical University, Istanbul, Turkey)
Gül Tekin Temur (Management Engineering, Istanbul Technical University, Istanbul, Turkey)
İrem Otay (Management Engineering, Istanbul Technical University, Istanbul, Turkey)

Journal of Enterprise Information Management

ISSN: 1741-0398

Article publication date: 8 April 2014

1553

Abstract

Purpose

The purpose of this paper is to develop a systematic and comprehensive project selection model utilizing fuzzy multi-objective linear programming (FMOLP) that deals with the imprecise data in IS projects and uncertain judgment of decision makers.

Design/methodology/approach

First, projects are prioritized by considering both quantitative and qualitative factors. A fuzzy analytical hierarchical process (FAHP) is used in order to obtain weights of each project that indicates their priorities. At the second step, project selection decision is completed by using FMOLP. Then, the sensitivity analysis is performed to evaluate the robustness of the proposed integrated model.

Findings

The result of this study indicates that an integrated approach utilizing FAHP and FMOLP can be used as a supportive tool for project selection in IS context. It decreases the uncertainty caused from uncertain judgment of decision makers.

Research limitations/implications

Future studies are suggested to design models having fuzzy constraints such as budget and resources. Moreover, for future studies, non-linear membership functions can be used.

Practical implications

Actual projects are provided from the Turkish IS company for prioritizing process and a hypothetical mathematical model is demonstrated using illustrative data.

Originality/value

This study contributes to the relevant literature by proposing a comprehensive model considering many conflicting ideas of decision makers on quantitative and qualitative criteria, and evaluating projects in an integrated way including FAHP and FMOLP.

Keywords

Citation

Bolat, B., Çebi, F., Tekin Temur, G. and Otay, İ. (2014), "A fuzzy integrated approach for project selection", Journal of Enterprise Information Management, Vol. 27 No. 3, pp. 247-260. https://doi.org/10.1108/JEIM-12-2013-0091

Publisher

:

Emerald Group Publishing Limited

Copyright © 2014, Emerald Group Publishing Limited

Related articles