To read this content please select one of the options below:

Achieving sustainability through integrating risk management into the architectural design process

Ayman Ahmed Ezzat Othman (Architectural Engineering Department, The British University in Egypt, Cairo, Egypt)
Nermeen Mohamed Amin Abdelwahab (Architectural Engineering Department, The British University in Egypt, Cairo, Egypt)

Journal of Engineering, Design and Technology

ISSN: 1726-0531

Article publication date: 5 February 2018

814

Abstract

Purpose

The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects.

Design/methodology/approach

A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities.

Findings

ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP.

Research limitations/implications

This paper focused only on the integration of RM into ADP.

Originality/value

The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Keywords

Citation

Othman, A.A.E. and Abdelwahab, N.M.A. (2018), "Achieving sustainability through integrating risk management into the architectural design process", Journal of Engineering, Design and Technology, Vol. 16 No. 1, pp. 25-43. https://doi.org/10.1108/JEDT-09-2017-0087

Publisher

:

Emerald Publishing Limited

Copyright © 2018, Emerald Publishing Limited

Related articles