To read this content please select one of the options below:

Turnaround project risk assessment using hybrid fuzzy SWARA and EDAS method: case of upstream oil process industries in Iran

Mohammad Reza Moniri (Department of Industrial Management, Faculty of Management and Accounting, Shahid Beheshti University, Tehran, Iran)
Akbar Alem Tabriz (Department of Industrial Management, Faculty of Management and Accounting, Shahid Beheshti University, Tehran, Iran)
Ashkan Ayough (Department of Industrial Management, Faculty of Management and Accounting, Shahid Beheshti University, Tehran, Iran)
Mostafa Zandieh (Department of Industrial Management, Faculty of Management and Accounting, Shahid Beheshti University, Tehran, Iran)

Journal of Engineering, Design and Technology

ISSN: 1726-0531

Article publication date: 28 December 2020

Issue publication date: 21 June 2021

355

Abstract

Purpose

The purpose of this paper is to propose a new framework for assessing the risks of turnaround projects in upstream oil process plants.

Design/methodology/approach

This study represents a new hybrid framework for turnaround project risk assessment. First, according to experts’ opinions, the project risks were identified using interviews and brainstorming. The most important risks selected by experts and a hybrid multiple-attribute decision-making (MADM) method used to assess and prioritize them. The proposed MADM method uses fuzzy step-wise weight assessment ratio analysis (SWARA) and fuzzy evaluation based on distance from average solution (EDAS) methods based on trapezoidal fuzzy numbers.

Findings

In this research, 28 usual risks of turnaround projects are identified and 10 risks are then selected as the most important ones. The findings show, that among the risks of upstream oil industry turnaround projects from the perspective of experts, the risk of timely financing by the employer, with an appraisal score of 0.83, has the highest rank among the risks and the risk of machine and equipment failure during operation, with an appraisal score of 0.04, has the lowest rank.

Research limitations/implications

The risk analysis based on inputs collected from the experts in the Iranian upstream oil industry, and so the generalization of the results is limited to the context of developing countries, especially oil producer ones. However, the proposed risk analysis methodology and key insights developed can be useful for researchers and practitioners in any other process industry everywhere.

Originality/value

A novel framework for risk assessment is introduced for turnaround projects in the oil industry using MADM methods. There is no literature on using MADM methods for turnaround project risk analysis in the oil and gas industries. Furthermore, this paper presents a hybrid fuzzy method based on SWARA and EDAS.

Keywords

Citation

Moniri, M.R., Alem Tabriz, A., Ayough, A. and Zandieh, M. (2021), "Turnaround project risk assessment using hybrid fuzzy SWARA and EDAS method: case of upstream oil process industries in Iran", Journal of Engineering, Design and Technology, Vol. 19 No. 4, pp. 966-988. https://doi.org/10.1108/JEDT-07-2020-0287

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Emerald Publishing Limited

Related articles