To read this content please select one of the options below:

Warranty costs analysis under accelerated life test for power Ishita distribution with type-I censored data

Intekhab Alam (Department of Statistics and Operations Research, Aligarh Muslim University, Aligarh, India) (St. Andrews Institute of Technology and Management, Gurugram, India)
Ahteshamul Haq (Department of Statistics and Operations Research, Aligarh Muslim University, Aligarh, India)
Lalit Kumar Sharma (St. Andrews Institute of Technology and Management, Gurugram, India)
Sumit Sharma (St. Andrews Institute of Technology and Management, Gurugram, India)
Ritika (St. Andrews Institute of Technology and Management, Gurugram, India)

International Journal of Quality & Reliability Management

ISSN: 0265-671X

Article publication date: 16 January 2023

Issue publication date: 22 August 2023

78

Abstract

Purpose

In this paper, the authors design accelerated life test and provide its application in the field of accelerated life test. The authors use maximum likelihood estimation method as a parameter estimation method.

Design/methodology/approach

In this paper we design accelerated life test and provide its application in the field of accelerated life test. The authors use maximum likelihood estimation method as a parameter estimation method.

Findings

In this study, the authors design accelerated life test under Type-I censoring when the lifetime of test items follows PID and also provides its application in the field of warranty policy. The following conclusion is made on the basis of this study. (1) An inverse relationship is shown between the shape parameter with the expected total cost and expected cycle time, while the shape parameter directly relates to the expected cost rate (see Table 5). (2) A direct relationship is shown between the scale parameter with the expected total cost and expected time cycle, while the inverse relationship is shown with the expected cost rate (see Table 5). (3) An inverse relationship is shown between the replacement age and the expected cost rate, while there are direct relationships between expected total cost and expected time cycle (see Table 5).

Originality/value

This paper is neither published or neither accepted anywhere.

Keywords

Citation

Alam, I., Haq, A., Sharma, L.K., Sharma, S. and Ritika (2023), "Warranty costs analysis under accelerated life test for power Ishita distribution with type-I censored data", International Journal of Quality & Reliability Management, Vol. 40 No. 8, pp. 1983-1998. https://doi.org/10.1108/IJQRM-08-2022-0251

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited

Related articles