The collaborative approaches of the knowledge-based performance management system and lean six sigma to improve contractor productivity and safety performances

Rahadian Haryo Bayu Sejati (School of Business Management, Bandung Institute of Technology (ITB), Bandung, Indonesia)
Dermawan Wibisono (School of Business Management, Bandung Institute of Technology (ITB), Bandung, Indonesia)
Akbar Adhiutama (School of Business Management, Bandung Institute of Technology (ITB), Bandung, Indonesia)

International Journal of Lean Six Sigma

ISSN: 2040-4166

Article publication date: 16 April 2024

Issue publication date: 27 August 2024

224

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Keywords

Citation

Bayu Sejati, R.H., Wibisono, D. and Adhiutama, A. (2024), "The collaborative approaches of the knowledge-based performance management system and lean six sigma to improve contractor productivity and safety performances", International Journal of Lean Six Sigma, Vol. 15 No. 5, pp. 1065-1101. https://doi.org/10.1108/IJLSS-07-2023-0125

Publisher

:

Emerald Publishing Limited

Copyright © 2024, Emerald Publishing Limited