Technical Paper Response: Determination of Manufacturing Cycle Time in Multi‐stage Production Systems
International Journal of Operations & Production Management
ISSN: 0144-3577
Article publication date: 1 March 1989
Abstract
A corrected attempt to determine the size of in‐process inventory and the manufacturing lead time for an n‐stage production system is made. This corrects the earlier model developed by Ornek and Collier by accurately deriving the model for determining the manufacturing cycle time.
Keywords
Citation
Goyal, S.K. and Singhal, S. (1989), "Technical Paper Response: Determination of Manufacturing Cycle Time in Multi‐stage Production Systems", International Journal of Operations & Production Management, Vol. 9 No. 3, pp. 60-63. https://doi.org/10.1108/EUM0000000001232
Publisher
:MCB UP Ltd
Copyright © 1989, MCB UP Limited