A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques
Engineering, Construction and Architectural Management
ISSN: 0969-9988
Article publication date: 25 August 2021
Issue publication date: 24 November 2022
Abstract
Purpose
The accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's tacit experiences, knowledge and background. The purpose of this paper is to develop a scientifically robust analytical approach by presenting a novel classification mechanism for defining the level of project complexity in terms of work contents (WCs), scope, building structures (BSs) and site conditions.
Design/methodology/approach
Empiricism is adopted to deductively analyze variables obtained from secondary data within extant literature and primary project data to develop project type classifications. Specifically, and from an operational perspective, a two-stage “waterfall process” was adopted. In stage one, the research identified 56 variables affecting project complexity from literature and utilized a structured questionnaire survey of 100 project managers to measure the relevance of these. A total of 27 variables were revealed to be significant and exploratory factor analysis (EFA) is adopted to cluster these variables into six-factor thematic groups. In stage two, data from 62 real-life projects (including the layout and structural plans) were utilized for computing the factor score using the six-factor groups. Finally, hierarchical cluster analysis (HCA) is adopted to classify the projects into collected distinctive groups and each of a similar nature and characteristics.
Findings
The developed theoretical framework (that includes a novel complex index) provides a robust “blueprint platform” for main contractors to compile their project complexity database. The research outputs enable project managers to generate a more accurate picture of complexity at the pre-construction stage.
Originality/value
While numerous research articles have provided a comprehensive framework to define project complexity, scant empirical works have assessed it at the pre-construction stage or utilized real-life project samples to classify it. This research addresses this knowledge gap within the prevailing body of knowledge.
Keywords
Citation
Sing, M.C.P., Edwards, D.J., Leung, A.W.T., Liu, H. and Roberts, C.J. (2022), "A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques", Engineering, Construction and Architectural Management, Vol. 29 No. 9, pp. 3754-3774. https://doi.org/10.1108/ECAM-09-2020-0726
Publisher
:Emerald Publishing Limited
Copyright © 2021, Emerald Publishing Limited