Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis
Engineering, Construction and Architectural Management
ISSN: 0969-9988
Article publication date: 1 August 2023
Issue publication date: 2 January 2025
Abstract
Purpose
Prefabricated construction (PC) can benefit construction industry due to its high efficiency, energy saving, consumption reduction and safety. However, the high capital cost is a critical challenge hindering its development in China. The collaboration of PC stakeholders is conducive to improving cost management efficiency and optimizing resource allocation which has been ignored in previous studies. Therefore, this study aims to explore the collaboration paths of stakeholders in the process of solving critical cost influencing factors (CIFs) of PC to reduce costs.
Design/methodology/approach
Firstly, 25 CIFs and five main stakeholders that affect PC capital cost were identified through literature research and expert interviews. Then, questionnaires were used to investigate the relationship between stakeholders and CIFs from the perspectives of three stakeholder attributes of proximity, attitude and power, respectively. Finally, based on the survey data, three stakeholder-CIF networks from three attributes perspective and a comprehensive network were constructed and used for subsequent social network analysis.
Findings
(1) Stakeholders mainly show willingness and potential to collaborate on organization and management factors; (2) More stakeholders pay attention to incentive policies and the setting of prefabrication rates and assembly rates, while all stakeholders have the right to facilitate information and resource sharing in the PC supply chain; (3) The comprehensive network shows a core-periphery structure. As core stakeholders, contractor, designer and manufacturer are more likely to actively manage the 14 core CIFs.
Originality/value
This paper innovatively combined stakeholder and cost management in PC, and used two-mode network based on three stakeholder perspectives to reveal the collaboration potential and motivation of stakeholders in PC cost management. The findings not only provide guidance for stakeholders to find potential partners and optimize resource allocation in solving specific cost issues, but also facilitate stakeholders' sustainable collaboration to achieve PC's cost performance.
Keywords
Acknowledgements
This research was funded by Research and application of rural housing system by dry-connected precast concrete Sandwich panels, the branch project of key technologies of rural housing design and construction, National Key R&D Program of China, grant number 2018YFD1100903-02.
Citation
Zhang, Y., Liu, Y., Yu, R., Zuo, J. and Dong, N. (2025), "Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis", Engineering, Construction and Architectural Management, Vol. 32 No. 1, pp. 556-577. https://doi.org/10.1108/ECAM-04-2023-0392
Publisher
:Emerald Publishing Limited
Copyright © 2023, Emerald Publishing Limited