To read this content please select one of the options below:

Adaptability of BIM technology to mitigate the cost overruns in design and build projects

K.L. Chamikara (Department of Building Economics, University of Moratuwa, Moratuwa, Sri Lanka)
B.A.K.S. Perera (Department of Building Economics, University of Moratuwa, Moratuwa, Sri Lanka)
Dinithi Piyumra Raigama Acharige (Department of Building Economics, University of Moratuwa, Moratuwa, Sri Lanka)
Biyanka Ekanayake (School of Built Environment, University of Technology Sydney, Sydney, Australia)

Construction Innovation

ISSN: 1471-4175

Article publication date: 18 July 2024

133

Abstract

Purpose

Cost overruns are an inevitable issue in design and build (D&B) projects. In D&B projects, causes for cost overruns can be managed by adopting appropriate building information modelling (BIM) functions. Because there is a research gap in synergy between the use of BIM for mitigating cost overruns in D&B projects, this study aims to evaluate the adaptability of BIM to manage cost overrun issues in them.

Design/methodology/approach

Research objectives were attained through a quantitative research approach adopting the Delphi technique, which consists of three rounds of a questionnaire survey. Through statistical tools, the collected data were analysed.

Findings

This research revealed the ten most crucial causes for cost overruns in D&B projects, where continuous changes in designs and drawings are the top causes. Change and revision management and interoperability are the most crucial BIM functions to address the aforementioned cause. Subsequently, 16 enablers, 26 barriers and 19 strategies to implement BIM to manage the identified significant causes of cost overruns were overviewed.

Originality/value

This study addresses the literature gap pertaining to the cost overrun in D&B projects and the application of BIM by studying the causes for cost overrun, suggesting BIM functions to mitigate the above cause. Moreover, this study assessed the probable barriers and enablers for BIM adoption in construction projects from D&B perspective.

Keywords

Acknowledgements

The authors would like to thank various individuals and organisations for their contributions to the research project described in this publication.

Disclosure statement: No potential conflict of interest was reported by the authors.

Citation

Chamikara, K.L., Perera, B.A.K.S., Raigama Acharige, D.P. and Ekanayake, B. (2024), "Adaptability of BIM technology to mitigate the cost overruns in design and build projects", Construction Innovation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/CI-01-2024-0018

Publisher

:

Emerald Publishing Limited

Copyright © 2024, Emerald Publishing Limited

Related articles