To read this content please select one of the options below:

Dadri Power Plant of National Thermal Power Corporation Limited

Ajay Shukla ((NTPC-PMI))
Goutam Dutta (Indian Institute of Management, Ahmedabad)

Publication date: 31 March 2016

Abstract

This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management, enforcement of safety rules, managing regulation iand in team building in leadership. A suitable case for site management, it shows in spite of being a public sector undertaking, how the project was constructed in record time of 42 months.

Keywords

Acknowledgements

NTPC-PMI and IIMA acknowledge the support and cooperation of Mr. A.C. Chaturvedi, Mr. K.K. Sharma, Mr. S.N Ganguly (RED WR-II) and the entire NTPC Dadri Team.

Citation

Shukla, A. and Dutta, G. (2016), "Dadri Power Plant of National Thermal Power Corporation Limited", . https://doi.org/10.1108/CASE.IIMA.2019.000096

Publisher

:

Indian Institute of Management Ahmedabad

Copyright © 2016 by the Indian Institute of Management, Ahmedabad

Related articles