To read this content please select one of the options below:

Accountability‐based order fulfillment process reengineering towards supply chain management: A case study at a semiconductor equipment manufacturer

Linda L. Zhang (Department of Operations, Faculty of Economics and Business, University of Groningen, Groningen, The Netherlands)
Roger J. Jiao (Woodruff School of Mechanical Engineering, Georgia Institute of Technology, Atlanta, Georgia, USA)
Qinhai Ma (School of Business Administration, Northeastern University, Shenyang, China)

Journal of Manufacturing Technology Management

ISSN: 1741-038X

Article publication date: 9 February 2010

2140

Abstract

Purpose

The purpose of this paper is to provide a methodology to industry and academia on how to reengineer the order fulfillment process (OFP) by capitalizing on integration and coordination across the entire supply chain to sustain supply chain management.

Design/methodology/approach

A case study at a semiconductor equipment manufacturer in Singapore is undertaken.

Findings

This paper confirms that the traditional OFPs present companies a challenge to satisfy the demanding customer requirements while achieving performance optimization of each supply chain partner; and it is imperative to reengineer the OFPs to stay competitive. To successfully reengineer OFPs, the efforts should be systematically organized to, for example, exploit potential processes as many as possible, determine an optimal process based on mathematically sound grounds.

Research limitations/implications

The use of a single case study may limit the generalizability of the findings.

Practical implications

A methodology incorporating accountability‐centered approach and simulation is developed for companies to reengineer OFPs while considering the entire supply chain.

Originality/value

The literature does not provide solutions for reengineering OFPs regardless of the fact that OFP reengineering is an emerging area of interest. This paper presents a valuable contribution to this topic by introducing a methodology and by applying the methodology to a semiconductor equipment manufacturer in Singapore.

Keywords

Citation

Zhang, L.L., Jiao, R.J. and Ma, Q. (2010), "Accountability‐based order fulfillment process reengineering towards supply chain management: A case study at a semiconductor equipment manufacturer", Journal of Manufacturing Technology Management, Vol. 21 No. 2, pp. 287-305. https://doi.org/10.1108/17410381011014413

Publisher

:

Emerald Group Publishing Limited

Copyright © 2010, Emerald Group Publishing Limited

Related articles