To read this content please select one of the options below:

Developing a comprehensive methodology for BPR projects by employing IT tools

Nazanin Eftekhari (Mads Clausen Institute, University of Southern Denmark, Sønderborg, Denmark)
Peyman Akhavan (Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran)

Business Process Management Journal

ISSN: 1463-7154

Article publication date: 1 February 2013

1623

Abstract

Purpose

The purpose of this paper is to present a comprehensive IT tools based methodology (CITM) for BPR projects in order to facilitate implementing BPR project by considering relevant IT tools in each phase of the methodology, both approaches (clean slate and analysis of existing processes on details), and failure analysis for diminishing the risk of the BPR project.

Design/methodology/approach

In today's world, corporations need to adjust with the environment changes in order to stay stable in facing market changes. This paper presents a comprehensive methodology in which by considering different aspects for implementing BPR project including IT tools, both BPR approaches, and failure analysis can facilitate BPR project. The proposed methodology's validation was tested by getting the 50 experts' ideas in each phase of the methodology and in a case study at organization and planning department in an IT company.

Findings

The structured methodology developed in this paper contain the two debatable approaches of BPR (clean slate approach as well as analysis of existing processes on details approach). This methodology enables the organization to derive a proper way to implement BPR project in order to its situation. In every phase of this methodology, based on their applications in each specific phase, required softwares and IT tools are proposed. The applicability of methodology was analyzed and confirmed thoroughly by the 50 BPR experts and in a case study at an IT company.

Originality/value

This study provides a comprehensive methodology to consider the gap of the BPR methodologies in their comprehensiveness, use IT tools and softwares and lower the risk of the BPR implementation. In developing the CITM the challenging approaches are considered, the related softwares and IT tools are proposed and failure analysis is done and considered in each phase of the CITM in order to decrease the risk of its implementation.

Keywords

Citation

Eftekhari, N. and Akhavan, P. (2013), "Developing a comprehensive methodology for BPR projects by employing IT tools", Business Process Management Journal, Vol. 19 No. 1, pp. 4-29. https://doi.org/10.1108/14637151311294831

Publisher

:

Emerald Group Publishing Limited

Copyright © 2013, Emerald Group Publishing Limited

Related articles