Implementing Drum‐Buffer‐Rope to Control Manufacturing Lead Time
The International Journal of Logistics Management
ISSN: 0957-4093
Article publication date: 1 January 1991
Abstract
Drum‐Buffer‐Rope (DBR) is a relatively new approach to inventory and logistics management that effectively supports reduced manufacturing lead‐time. Previous studies have not emphasized this fact nor explained how it is accomplished. This paper describes DBR mechanics, proposes appropriate implementation steps, identifies key ideas, and reports experience with one DBR application. Key ideas identified include the use of input control and excess capacity. Input control is readily implemented within DBR while excess capacity permits DBR flow to be maintained. The reported application demonstrates both the effectiveness of DBR in reducing lead‐time and its vulnerability to misunderstanding.
Keywords
Citation
Fry, T.D., Karwan, K.R. and Steele, D.C. (1991), "Implementing Drum‐Buffer‐Rope to Control Manufacturing Lead Time", The International Journal of Logistics Management, Vol. 2 No. 1, pp. 12-18. https://doi.org/10.1108/09574099110804634
Publisher
:MCB UP Ltd
Copyright © 1991, MCB UP Limited